These representations were sent to the Inspectors in the Further Main Modifications (FMM) consultation, which ran from 14th September to 5pm on 28th October. Read what happens next.
The representations below have been submitted to us by the individuals or groups named, and are published here at their request. Inclusion doesn't imply endorsement by us.
Asks for a published account of housing capacity in built-up areas before the modified Green Belt allocations are confirmed, and for explanations of reduced safeguards and firm arrangements for local facilities.
Questions why the Council ruled out Ryecroft Farm as unavailable while treating a tenancy at Town End Farm differently. Asks for its lease and assessment to be published and for it to be appraised as an alternative to SES30 if the lease constraint is removed.
Challenges the combined effects and deliverability of seven Green Belt allocations in Chapeltown, Ecclesfield and Grenoside, including farmland loss, housing capacity, local facilities and infrastructure. Asks for reassessment of the evidence and alternatives before the allocations are confirmed.
Says the Council has not assessed or secured the community facilities needed for SES29 and SES30 together. Asks the Inspectors to resolve provision, delivery and any effects on housing capacity before confirming the allocations
Says the Council uses Defra's predictive farmland map to support individual allocations without publishing the extent or grades of farmland affected. Asks for comparisons of alternatives and retention of survey requirements
Questions the different meanings given to Yorkshire Water's red ratings in its disclosed assessment and the published infrastructure evidence. Asks for the position on sewer capacity and the funding and timing of upgrades to be established before relying on homes from SES30 and NES37.
Challenges whether the affordable housing total in FMM33 is supported by the figures and delivery evidence in EXAM 187A. Asks for a revised total based on a published breakdown by location, corrected housing figures and evidence of funding.
Raises concerns about the Quaker burial ground at SES30, transport provision, the proposed SES29 roundabout and the late publication of the equality assessment. Calls for updated traffic modelling, consideration of Infield Lane as an alternative and a fairer distribution of development.
Asks for NES37, NES38 and NES39 to be removed from the Plan, with replacement homes through urban alternatives and higher densities linked to public transport. Seeks a pause to the examination and changes to farmland protection, Hesley Wood safeguards and affordable housing figures.