| 2 |
REF8.0001 |
14/09/2026 |
Linda Tibbles |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
Not specified |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 3 |
REF8.0002 |
14/09/2026 |
Alex Tibbles |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
Not specified |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 4 |
REF8.0003 |
14/09/2026 |
James and Marcy Tibbles |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
Not specified |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 5 |
REF8.0004 |
14/09/2026 |
Simon Jones |
Email |
National Highways |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 6 |
REF8.0005 |
15/09/2026 |
Mohamed Raftar |
Email |
Individual |
|
EXAM 221 |
|
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 7 |
REF8.0006 |
16/09/2026 |
John Daniels |
Email |
Individual |
|
Integrated Impact Assessment, EXAM 219, EXAM 130C, EXAM 217C |
|
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 8 |
REF8.0007 |
16/09/2026 |
Mohamed Raftar |
Email |
Individual |
|
EXAM 221 |
|
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 9 |
REF8.0008 |
21/09/2026 |
David Barton |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 10 |
REF8.0009 |
22/09/2026 |
Kerrie Holland |
Email |
Fisher German |
Exolum |
Not specified |
Not specified |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 11 |
REF8.0010 |
23/09/2026 |
Jennifer Chaplin and Jacob Priestley |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 12 |
REF8.0011 |
29/09/2026 |
Tom Mcilvanney |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 13 |
REF8.0012 |
30/09/2026 |
James Langler |
Email |
Historic England |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 14 |
REF8.0013 |
04/10/2026 |
Valerie Birks |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 15 |
REF8.0014 |
07/10/2026 |
S Hartwell |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 16 |
REF8.0015 |
08/10/2026 |
Andrew Barson |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 17 |
REF8.0016 |
08/10/2026 |
Lindy Hinchcliffe |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM16 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 18 |
REF8.0017 |
08/10/2026 |
Callum Beardow |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 19 |
REF8.0018 |
08/10/2026 |
Aron Spall |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 20 |
REF8.0019 |
08/10/2026 |
Helen Wales |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 21 |
REF8.0020 |
08/10/2026 |
Chris Smith |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 22 |
REF8.0021 |
08/10/2026 |
Kerry Maltby |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 23 |
REF8.0022 |
08/10/2026 |
Wayne Maltby |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 24 |
REF8.0023 |
08/10/2026 |
Maisie Wilson |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 25 |
REF8.0024 |
08/10/2026 |
Rebecca White |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 26 |
REF8.0025 |
09/10/2026 |
Ken Mobley |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 27 |
REF8.0026 |
09/10/2026 |
Adele Schwartz |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 28 |
REF8.0027 |
09/10/2026 |
Richard Hull |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 29 |
REF8.0028 |
09/10/2026 |
John Bishop |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 30 |
REF8.0029 |
09/10/2026 |
Jayne Hull |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 31 |
REF8.0030 |
09/10/2026 |
Patricia Marsh |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 32 |
REF8.0031 |
09/10/2026 |
Zuzanna Krzyzewska |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 33 |
REF8.0032 |
09/10/2026 |
Holly Heaton |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 34 |
REF8.0033 |
11/10/2026 |
Alison Andrews |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM31 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 35 |
REF8.0034 |
11/10/2026 |
Paul Wainwright |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM28 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 36 |
REF8.0035 |
11/10/2026 |
Kim Bogunovic |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM28 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 37 |
REF8.0036 |
12/10/2026 |
Barbara Parkin |
Email |
Individual |
|
EXAM 219, EXAM 221, EXAM 222 |
Not specified |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 38 |
REF8.0037 |
12/10/2026 |
Tracey Fisher |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 39 |
REF8.0038 |
12/10/2026 |
Robert Neil Brown |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 40 |
REF8.0039 |
12/10/2026 |
Gillian Hill |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 41 |
REF8.0040 |
12/10/2026 |
Carl Yellot-Bilby |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 42 |
REF8.0041 |
12/10/2026 |
Katie Hardie |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM16 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 43 |
REF8.0042 |
12/10/2026 |
R Cater-Whitham |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219, EXAM 221 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 44 |
REF8.0043 |
12/10/2026 |
Tom Turner |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 45 |
REF8.0044 |
13/10/2026 |
David Cronshaw |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 46 |
REF8.0045 |
13/10/2026 |
Dawn Stevens |
Email |
Individual |
|
EXAM 221 |
Not specified |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 47 |
REF8.0046 |
13/10/2026 |
Vicky Russell |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 48 |
REF8.0047 |
13/10/2026 |
Nia Ross |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 49 |
REF8.0048 |
13/10/2026 |
Not specified |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 50 |
REF8.0049 |
13/10/2026 |
Jane Howling |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 51 |
REF8.0050 |
13/10/2026 |
Catherine Smith |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0001 - REF8.0050 |
|
|
|
|
| 52 |
REF8.0051 |
13/10/2026 |
Duncan Burdon Bailey |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 53 |
REF8.0052 |
13/10/2026 |
Angela Burdon Bailey |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 54 |
REF8.0053 |
14/10/2026 |
John and Lisa Poter |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM16 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 55 |
REF8.0054 |
14/10/2026 |
Sally Walton |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 56 |
REF8.0055 |
14/10/2026 |
SM Gladwin |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 57 |
REF8.0056 |
14/10/2026 |
Rebecca Rasooly |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 58 |
REF8.0057 |
14/10/2026 |
Robert Milner |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 59 |
REF8.0058 |
15/10/2026 |
Ian Horner |
Email |
Councillor |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 60 |
REF8.0059 |
15/10/2026 |
Joseph Dunn |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 61 |
REF8.0060 |
15/10/2026 |
Helen O'Neill |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM31 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 62 |
REF8.0061 |
15/10/2026 |
Melanie Lindsley |
Email |
Coal Authority |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 63 |
REF8.0062 |
15/10/2026 |
Lauren Armstrong |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 64 |
REF8.0063 |
16/10/2026 |
Jessica Drinkwater |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 65 |
REF8.0064 |
16/10/2026 |
Lindsey Stagg |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 66 |
REF8.0065 |
16/10/2026 |
Jane Richardson |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 67 |
REF8.0066 |
16/10/2026 |
Sarah Roberts |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 68 |
REF8.0068 |
16/10/2026 |
Lauren Casey |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM33 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 69 |
REF8.0069 |
16/10/2026 |
Jill Dunn |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM31 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 70 |
REF8.0070 |
16/10/2026 |
Lauren Casey |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 224 |
FMM28, FMM5 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 71 |
REF8.0071 |
16/10/2026 |
Phillip O'Neill |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM31 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 72 |
REF8.0072 |
16/10/2026 |
Penelope Clay |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 73 |
REF8.0073 |
17/10/2026 |
Susan and Mike Housley |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 74 |
REF8.0074 |
17/10/2026 |
Barbara Parkin |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM16 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 75 |
REF8.0075 |
17/10/2026 |
Chloe Sylvester |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 76 |
REF8.0076 |
18/10/2026 |
Penny Miller |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 77 |
REF8.0077 |
18/10/2026 |
Andrea Platts and Fraser Laurie |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 78 |
REF8.0078 |
18/10/2026 |
Rosalyn and David Platts |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 79 |
REF8.0079 |
18/10/2026 |
Katie Edwards |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 80 |
REF8.0080 |
18/10/2026 |
Nick Cupit |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 81 |
REF8.0081 |
18/10/2026 |
Clare Robinson |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 82 |
REF8.0082 |
18/10/2026 |
Pauline Green and Vincent Green |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 83 |
REF8.0083 |
18/10/2026 |
Alex Tibbles |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 84 |
REF8.0084 |
19/10/2026 |
James Tibbles |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 85 |
REF8.0085 |
19/10/2026 |
Tracey Goulsbra |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 86 |
REF8.0086 |
19/10/2026 |
Shaun Crookes |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 87 |
REF8.0087 |
19/10/2026 |
Linda Tibbles |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 88 |
REF8.0088 |
19/10/2026 |
Tracey Stratford-Smith |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 89 |
REF8.0089 |
19/10/2026 |
Mr and Mrs Atkins |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 90 |
REF8.0090 |
19/10/2026 |
Nigel Dorman |
Email |
Individual |
|
EXAM 222, EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 91 |
REF8.0091 |
19/10/2026 |
Deborah and Glyn Hitchen |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 92 |
REF8.0092 |
19/10/2026 |
Michelle Dewire |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219, EXAM 222 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 93 |
REF8.0093 |
19/10/2026 |
Margaret Melluish |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 94 |
REF8.0094 |
19/10/2026 |
Cath Readings |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 95 |
REF8.0095 |
19/10/2026 |
Samantha Green |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 96 |
REF8.0096 |
19/10/2026 |
Lynne Henwood |
Email |
Individual |
|
EXAM 221, EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 97 |
REF8.0097 |
19/10/2026 |
A White |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 98 |
REF8.0098 |
19/10/2026 |
C White |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 99 |
REF8.0099 |
19/10/2026 |
Dawn Jordan |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 100 |
REF8.0100 |
19/10/2026 |
Louis |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0051 - REF8.0100 |
|
|
|
|
| 101 |
REF8.0101 |
19/10/2026 |
Jess Doncaster |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM33 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 102 |
REF8.0102 |
19/10/2026 |
Helen Doncaster |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM33 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 103 |
REF8.0103 |
19/10/2026 |
Shaun Doncaster |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM33 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 104 |
REF8.0104 |
19/10/2026 |
Paul Bridges |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 105 |
REF8.0105 |
19/10/2026 |
Julie McLennan |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 106 |
REF8.0106 |
19/10/2026 |
Lianne Lynch |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 107 |
REF8.0107 |
19/10/2026 |
Andrew R Turner |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 108 |
REF8.0108 |
19/10/2026 |
Alice Green |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 109 |
REF8.0109 |
19/10/2026 |
Wendy Miller and Robert Miller |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 110 |
REF8.0110 |
19/10/2026 |
Louise Green |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 111 |
REF8.0111 |
20/10/2026 |
Sandra Gorner and Derrick Bolsover |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 112 |
REF8.0112 |
20/10/2026 |
Emma Davidson |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 113 |
REF8.0113 |
20/10/2026 |
Richard Holmes |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 114 |
REF8.0114 |
20/10/2026 |
Derrick Plant |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 115 |
REF8.0115 |
20/10/2026 |
Maciej Borzestowski |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 116 |
REF8.0116 |
20/10/2026 |
Sophie O’Nion |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 117 |
REF8.0117 |
20/10/2026 |
Daniel Stone |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 118 |
REF8.0118 |
20/10/2026 |
P Wood |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 119 |
REF8.0119 |
20/10/2026 |
G M Gilbert |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 120 |
REF8.0120 |
20/10/2026 |
Deborah Parker |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 121 |
REF8.0121 |
20/10/2026 |
Claire Pinder |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 122 |
REF8.0122 |
20/10/2026 |
Rebecca Doncaster |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM33 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 123 |
REF8.0123 |
20/10/2026 |
Jordan Rowland |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM33 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 124 |
REF8.0124 |
20/10/2026 |
Jason Pinder |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 125 |
REF8.0125 |
20/10/2026 |
Paul Ratcliffe |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM33 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 126 |
REF8.0126 |
20/10/2026 |
Louise Ratcliffe |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM33 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 127 |
REF8.0127 |
20/10/2026 |
Chelsea Herring |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 128 |
REF8.0128 |
20/10/2026 |
Tina Flanagan |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 129 |
REF8.0129 |
21/10/2026 |
Not specified |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 130 |
REF8.0130 |
21/10/2026 |
James Poore |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM33 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 131 |
REF8.0131 |
21/10/2026 |
Peter |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 132 |
REF8.0132 |
20/10/2026 |
Andrew Speight |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 133 |
REF8.0133 |
20/10/2026 |
Olivia Maltby |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 134 |
REF8.0134 |
21/10/2026 |
Carl Brocklehurst |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 135 |
REF8.0135 |
21/10/2026 |
Mark Walker |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 136 |
REF8.0136 |
21/10/2026 |
Rebecca White |
Email |
Individual |
|
EXAM 222 |
Not specified |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 137 |
REF8.0137 |
21/10/2026 |
John and Carol Bowler |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 138 |
REF8.0138 |
21/10/2026 |
Hazel Millington |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 139 |
REF8.0139 |
21/10/2026 |
Debbie Bellamy |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 140 |
REF8.0140 |
22/10/2026 |
Helen Rodgers |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 141 |
REF8.0141 |
22/10/2026 |
Mark Howard |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 142 |
REF8.0142 |
22/10/2026 |
Richard Rathbone |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 143 |
REF8.0143 |
22/10/2026 |
Steven Ross |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 144 |
REF8.0144 |
22/10/2026 |
Tobias Cooke |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 145 |
REF8.0145 |
22/10/2026 |
Sue Varley and Ian Varley |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM33 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 146 |
REF8.0146 |
22/10/2026 |
Peter Brady |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 147 |
REF8.0147 |
22/10/2026 |
Jackie Baldwin |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 148 |
REF8.0148 |
22/10/2026 |
Not specified |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 149 |
REF8.0149 |
22/10/2026 |
Rebecca Broxholme |
Email |
Individual |
|
EXAM 222, EXAM 217C |
Not specified |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 150 |
REF8.0150 |
22/10/2026 |
Rebecca Broxholme |
Email |
Individual |
|
EXAM 222, EXAM 217C |
Not specified |
Hyperlink to view coments REF8.0101 - REF8.0150 |
|
|
|
|
| 151 |
REF8.0151 |
23/10/2026 |
Tracey Stafford |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 152 |
REF8.0152 |
23/10/2026 |
Leanne Gilbank |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 153 |
REF8.0153 |
23/10/2026 |
Rosemary Wilkinson |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 154 |
REF8.0154 |
23/10/2026 |
Andrew Rose |
Email |
Spawforths |
Rula Developments |
Schedule of Proposed Further Main Modifications |
FMM1, FMM5, FMM31 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 155 |
REF8.0155 |
23/10/2026 |
Lorna Giblin |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 156 |
REF8.0156 |
23/10/2026 |
Claire Jarvis |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 157 |
REF8.0157 |
23/10/2026 |
Lynne Armstrong |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 158 |
REF8.0158 |
23/10/2026 |
Tina Marshall |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 159 |
REF8.0159 |
23/10/2026 |
Mandy Loach |
Email |
Trans Penine Trail and Walk Wheel Cycle Trust |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 160 |
REF8.0160 |
23/10/2026 |
Helen Crowell |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 161 |
REF8.0161 |
23/10/2026 |
Emma |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 162 |
REF8.0162 |
23/10/2026 |
Not specified |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 163 |
REF8.0163 |
23/10/2026 |
Andrew Hill |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 164 |
REF8.0165 |
23/10/2026 |
Lauren Osborne |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 165 |
REF8.0166 |
23/10/2026 |
Not specified |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 166 |
REF8.0167 |
23/10/2026 |
David Thornton |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 167 |
REF8.0168 |
23/10/2026 |
Julie Harris |
Email |
Wharncliffe Side Let's Breathe |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 168 |
REF8.0169 |
23/10/2026 |
Julie Harris |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 169 |
REF8.0170 |
23/10/2026 |
Elen Squires |
Email |
Natural England |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 170 |
REF8.0171 |
23/10/2026 |
Isabella Gillespie |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 171 |
REF8.0172 |
23/10/2026 |
Brendan Gillespie |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 172 |
REF8.0173 |
23/10/2026 |
Claire Kirby |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 173 |
REF8.0174 |
23/10/2026 |
John-Patrick Gillespie |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 174 |
REF8.0175 |
23/10/2026 |
Stuart Harris |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 175 |
REF8.0176 |
23/10/2026 |
Amanda Yellott-Bilby |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 176 |
REF8.0177 |
23/10/2026 |
Catherine Unwin |
Email |
Individual |
|
EXAM 219, EXAM 222 |
Not specified |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 177 |
REF8.0178 |
23/10/2026 |
Reg Parsisson |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 178 |
REF8.0179 |
23/10/2026 |
Margaret Lea |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 179 |
REF8.0180 |
23/10/2026 |
M Darwin |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 180 |
REF8.0181 |
23/10/2026 |
Susanne Carter |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 181 |
REF8.0182 |
23/10/2026 |
Jessica Ryder |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 182 |
REF8.0183 |
23/10/2026 |
Simon Harris |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 183 |
REF8.0184 |
23/10/2026 |
Jenny Freeman |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 184 |
REF8.0185 |
23/10/2026 |
Glenise Yellot |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 185 |
REF8.0186 |
24/10/2026 |
John Winfield |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 186 |
REF8.0187 |
24/10/2026 |
Susan Smelt |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM16 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 187 |
REF8.0188 |
24/10/2026 |
Teresa Loxley |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 188 |
REF8.0189 |
24/10/2026 |
Pamela Lawson |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 189 |
REF8.0190 |
24/10/2026 |
Mark Nuttall |
Email |
Individual |
|
EXAM 221 |
Not specified |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 190 |
REF8.0191 |
24/10/2026 |
Zoë Mason |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 191 |
REF8.0192 |
24/10/2026 |
Michelle Buckley |
Email |
Individual |
|
EXAM 221 |
Not specified |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 192 |
REF8.0193 |
24/10/2026 |
Kevin Briggs |
Email |
Individual |
|
EXAM 221 |
Not specified |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 193 |
REF8.0194 |
24/10/2026 |
Helen Meadows |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 194 |
REF8.0195 |
25/10/2026 |
Z Denham |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 195 |
REF8.0196 |
25/10/2026 |
Danielle Marsh |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 196 |
REF8.0197 |
25/10/2026 |
P Darwin |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 197 |
REF8.0198 |
25/10/2026 |
Andrea Platts and Paul Johnston |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 198 |
REF8.0199 |
25/10/2026 |
Nicola Bates |
Email |
Individual |
|
EXAM 222, EXAM 221, EXAM 219 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 199 |
REF8.0200 |
25/10/2026 |
Lauren Horwell |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0151 - REF8.0200 |
|
|
|
|
| 200 |
REF8.0201 |
25/10/2026 |
Michael and Paula Sampson |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 201 |
REF8.0202 |
25/10/2026 |
Samantha Cronshaw |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 202 |
REF8.0203 |
25/10/2026 |
Lauren Arnold |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 203 |
REF8.0204 |
25/10/2026 |
Nigel Kitson |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 204 |
REF8.0205 |
25/10/2026 |
Katie Jenkins |
Email |
Individual |
|
EXAM 219, EXAM 222 |
Not specified |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 205 |
REF8.0206 |
25/10/2026 |
Glenda Mitton |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 206 |
REF8.0207 |
25/10/2026 |
Michael Rowley |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 207 |
REF8.0208 |
25/10/2026 |
Matthew B Sieczkarek |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 208 |
REF8.0209 |
25/10/2026 |
Gareth Arnold |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 209 |
REF8.0210 |
25/10/2026 |
Joseph Dunn |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 210 |
REF8.0211 |
25/10/2026 |
Andrew Bates |
Email |
Individual |
|
EXAM 222, EXAM 221, EXAM 219 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 211 |
REF8.0212 |
25/10/2026 |
Oliver Bowler |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 212 |
REF8.0213 |
25/10/2026 |
Emily Bowler |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 213 |
REF8.0214 |
25/10/2026 |
Lindsey Hudson |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 214 |
REF8.0215 |
25/10/2026 |
John Marsh |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 215 |
REF8.0216 |
25/10/2026 |
Joseph Dunn |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 216 |
REF8.0217 |
25/10/2026 |
Elizabeth Sadiq |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5, FMM16, FMM28 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 217 |
REF8.0218 |
25/10/2026 |
Aftab Sadiq |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5, FMM16, FMM28 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 218 |
REF8.0219 |
25/10/2026 |
Rohan Sadiq |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5, FMM16, FMM28 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 219 |
REF8.0220 |
25/10/2026 |
Meesha Elliott |
Email |
Individual |
|
EXAM 221 |
Not specified |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 220 |
REF8.0221 |
25/10/2026 |
James Gordon |
Email |
Individual |
|
EXAM 221, EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 221 |
REF8.0222 |
26/10/2026 |
Caroline Walton |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 222 |
REF8.0223 |
26/10/2026 |
Lorraine Galligan |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 223 |
REF8.0224 |
26/10/2026 |
John Galligan |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 224 |
REF8.0225 |
26/10/2026 |
Adele Metcalfe |
Email |
Peak District National Park Authority |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 225 |
REF8.0226 |
26/10/2026 |
Rhea Ingham |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 226 |
REF8.0227 |
26/10/2026 |
Andrea Smith |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 227 |
REF8.0228 |
26/10/2026 |
Rebecca Nutton |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 228 |
REF8.0229 |
26/10/2026 |
Not specified |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 229 |
REF8.0230 |
26/10/2026 |
Ruth Hubbard |
Email |
Individual |
|
EXAM 130C |
Not specified |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 230 |
REF8.0231 |
26/10/2026 |
Christine Handley |
Email |
Individual |
|
EXAM 219, EXAM 221, EXAM 222 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 231 |
REF8.0232 |
26/10/2026 |
Caroline Dunn |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 232 |
REF8.0233 |
26/10/2026 |
Phil Moulding |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 233 |
REF8.0234 |
26/10/2026 |
Bev Moulding |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 234 |
REF8.0235 |
26/10/2026 |
G K Johns |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 235 |
REF8.0236 |
26/10/2026 |
Vicky K |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 236 |
REF8.0237 |
26/10/2026 |
Debra Coleman |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 237 |
REF8.0238 |
26/10/2026 |
Mandy Robertson |
Email |
Individual |
|
EXAM 221 |
Not specified |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 238 |
REF8.0239 |
26/10/2026 |
Kathryn Currey |
Email |
Individual |
|
EXAM 221, EXAM 222, EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 239 |
REF8.0240 |
26/10/2026 |
Mark Walton |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 240 |
REF8.0241 |
26/10/2026 |
Alice Marsden |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 241 |
REF8.0242 |
26/10/2026 |
Lynda Jackson |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM31 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 242 |
REF8.0243 |
26/10/2026 |
James Hobson |
Email |
JEH Planning |
Norfolk Estate |
Schedule of Proposed Further Main Modifications |
FMM7 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 243 |
REF8.0244 |
26/10/2026 |
Robert and Linda Armitage |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 244 |
REF8.0245 |
26/10/2026 |
Mary Bennett |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 221, EXAM 222, EXAM 219 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 245 |
REF8.0246 |
26/10/2026 |
Christine Starkey |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 246 |
REF8.0247 |
26/10/2026 |
Louise Marsden |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 247 |
REF8.0248 |
26/10/2026 |
Deborah Harris |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 248 |
REF8.0249 |
26/10/2026 |
Nicola Siddall |
Email |
Individual |
|
EXAM 219 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 249 |
REF8.0250 |
26/10/2026 |
Anja Charlesworth |
Email |
Individual |
|
EXAM 221 |
Not specified |
Hyperlink to view coments REF8.0201 - REF8.0250 |
|
|
|
|
| 250 |
REF8.0251 |
26/10/2026 |
Janet Dunn |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 251 |
REF8.0252 |
26/10/2026 |
Sharon Driver |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 252 |
REF8.0253 |
26/10/2026 |
John Marsden |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM33, FMM28 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 253 |
REF8.0254 |
26/10/2026 |
Phil Corker |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 254 |
REF8.0255 |
26/10/2026 |
Jim Hobson |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 255 |
REF8.0256 |
26/10/2026 |
Nicola Brady |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 256 |
REF8.0257 |
26/10/2026 |
Megan Coleman |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 257 |
REF8.0258 |
26/10/2026 |
Joan Smith |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 258 |
REF8.0259 |
26/10/2026 |
Michael Mason |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 259 |
REF8.0260 |
27/10/2026 |
Steven Cousin |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 260 |
REF8.0261 |
27/10/2026 |
Maddy Crook |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219, EXAM 221 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 261 |
REF8.0262 |
27/10/2026 |
Dominic Barnett |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219, EXAM 221 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 262 |
REF8.0263 |
27/10/2026 |
Thomas Beyer |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM1, FMM13 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 263 |
REF8.0264 |
27/10/2026 |
Paul |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 264 |
REF8.0265 |
27/10/2026 |
Matthew Burgin |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 265 |
REF8.0266 |
27/10/2026 |
Lucy Hurst |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 266 |
REF8.0267 |
27/10/2026 |
Samantha Massey |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 267 |
REF8.0268 |
27/10/2026 |
Sam Hurst |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 268 |
REF8.0269 |
27/10/2026 |
Chris Martin |
Email |
Home Builders Federation |
|
Schedule of Proposed Further Main Modifications |
FMM3, FMM4, FMM8, FMM9, FMM10, FMM14, FMM15, FMM17, FMM20, FMM21, FMM22, FMM23, FMM24, FMM25, FMM33 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 269 |
REF8.0270 |
27/10/2026 |
Heather Dewick |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 270 |
REF8.0271 |
27/10/2026 |
Mike Levery |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 130C, EXAM 187A, EXAM218, EXAM 219, |
Not specified |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 271 |
REF8.0272 |
27/10/2026 |
Carl Else |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 272 |
REF8.0273 |
27/10/2026 |
Martin Nattrass |
Email |
Individual |
|
EXAM 221 |
Not specified |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 273 |
REF8.0274 |
27/10/2026 |
Gill Travis |
Email |
Individual |
|
EXAM 219, EXAM187A |
FMM5 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 274 |
REF8.0275 |
27/10/2026 |
Simon Staniforth |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 275 |
REF8.0276 |
27/10/2026 |
Grace Coleman |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 276 |
REF8.0277 |
27/10/2026 |
Alan Barstow |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 277 |
REF8.0278 |
27/10/2026 |
Claire Pennington |
Email |
Individual |
|
EXAM 219, EXAM 222 |
Not specified |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 278 |
REF8.0279 |
27/10/2026 |
Stephen Roberts |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 279 |
REF8.0280 |
27/10/2026 |
Susan Roberts |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 280 |
REF8.0281 |
27/10/2026 |
Charlie Roberts |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 281 |
REF8.0282 |
27/10/2026 |
Simon Robinson |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 282 |
REF8.0283 |
27/10/2026 |
Matthew Pegler |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 283 |
REF8.0284 |
27/10/2026 |
Tariq Duggan |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 284 |
REF8.0285 |
27/10/2026 |
Not specified |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 285 |
REF8.0286 |
27/10/2026 |
Trevor Unwin |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 286 |
REF8.0287 |
27/10/2026 |
Nia Wyn Jones |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 287 |
REF8.0288 |
27/10/2026 |
Neve Cooper |
Email |
Environment Agency |
|
Schedule of Proposed Further Main Modifications |
FMM18, FMM19 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 288 |
REF8.0289 |
27/10/2026 |
Rachel Glover White |
Email |
NJL Consulting |
Great Places |
Not specified |
Not specified |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 289 |
REF8.0290 |
27/10/2026 |
Michael Naylor |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 290 |
REF8.0291 |
27/10/2026 |
Steven Dale |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219, EXAM 221 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 291 |
REF8.0292 |
27/10/2026 |
M Barraclough |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219, EXAM 221 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 292 |
REF8.0293 |
27/10/2026 |
Anthony Mills |
Email |
Individual |
|
EXAM 217, EXAM 217A, EXAM 217C, EXAM 130C, EXAM 219 |
FMM7, FMM28 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 293 |
REF8.0294 |
27/10/2026 |
Jenny Haigh |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 294 |
REF8.0295 |
27/10/2026 |
Godfrey Pell |
Email |
Individual |
|
EXAM 219 |
FMM31 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 295 |
REF8.0296 |
27/10/2026 |
Amber Ainsworth |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 296 |
REF8.0297 |
27/10/2026 |
S Wheeler |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 297 |
REF8.0298 |
27/10/2026 |
Ben Parkes |
Email |
Savills |
Handsworth Farm Partnership |
EXAM 221, EXAM 222, EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 298 |
REF8.0299 |
27/10/2026 |
David Lycett |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 299 |
REF8.0300 |
27/10/2026 |
Anne Lycett |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0251 - REF8.0300 |
|
|
|
|
| 300 |
REF8.0301 |
27/10/2026 |
Joanne Ward |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 301 |
REF8.0302 |
27/10/2026 |
Liz Grant |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 302 |
REF8.0303 |
27/10/2026 |
James Haigh |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 303 |
REF8.0304 |
27/10/2026 |
Nicola Ley |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 304 |
REF8.0305 |
27/10/2026 |
Kate Carey |
Email |
Shelter Sheffield |
|
EXAM 217C, EXAM 218 |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 305 |
REF8.0306 |
27/10/2026 |
Camille Chapman |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219, EXAM 222, EXAM 221 |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 306 |
REF8.0307 |
27/10/2026 |
Haley Spyve |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 307 |
REF8.0308 |
27/10/2026 |
Amanda Jackson |
Email |
Individual |
|
EXAM 221 |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 308 |
REF8.0309 |
27/10/2026 |
Lesley Barr |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 309 |
REF8.0310 |
27/10/2026 |
Diane McKinlay |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 310 |
REF8.0311 |
27/10/2026 |
Nigel Clark |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 311 |
REF8.0312 |
27/10/2026 |
Chris Jackson |
Email |
Individual |
|
EXAM 221 |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 312 |
REF8.0313 |
27/10/2026 |
Wendy Lane |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 187A, EXAM 219 |
FMM5, FMM28, FMM31 |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 313 |
REF8.0314 |
27/10/2026 |
Kevin Roden |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 314 |
REF8.0315 |
27/10/2026 |
Lynn Ogle |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 315 |
REF8.0316 |
27/10/2026 |
Cheryl Hague |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219, EXAM 222 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 316 |
REF8.0317 |
27/10/2026 |
Liam Cross |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 317 |
REF8.0318 |
27/10/2026 |
Stephen Hague |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219, EXAM 222 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 318 |
REF8.0320 |
27/10/2026 |
George Mason |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 319 |
REF8.0321 |
27/10/2026 |
Morgan Scott |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 320 |
REF8.0322 |
27/10/2026 |
Joy Pemberton |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 321 |
REF8.0323 |
27/10/2026 |
C Pemberton |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 322 |
REF8.0324 |
27/10/2026 |
C Burkinshaw |
Email |
Individual |
|
EXAM 222 |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 323 |
REF8.0325 |
27/10/2026 |
Tony Burkinshaw |
Email |
Individual |
|
EXAM 222 |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 324 |
REF8.0326 |
27/10/2026 |
Louise Burkinshaw |
Email |
Individual |
|
EXAM 222 |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 325 |
REF8.0327 |
27/10/2026 |
C Burkinshaw |
Email |
Individual |
|
EXAM 222 |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 326 |
REF8.0328 |
27/10/2026 |
D Mellor |
Email |
Individual |
|
EXAM 222 |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 327 |
REF8.0329 |
27/10/2026 |
M Mellor |
Email |
Individual |
|
EXAM 222 |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 328 |
REF8.0330 |
27/10/2026 |
C Mellor |
Email |
Individual |
|
EXAM 222 |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 329 |
REF8.0331 |
27/10/2026 |
A Mellor |
Email |
Individual |
|
EXAM 222 |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 330 |
REF8.0332 |
27/10/2026 |
L Mellor |
Email |
Individual |
|
EXAM 222 |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 331 |
REF8.0333 |
27/10/2026 |
J Mellor |
Email |
Individual |
|
EXAM 222 |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 332 |
REF8.0334 |
27/10/2026 |
Tina Marshall |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 333 |
REF8.0335 |
27/10/2026 |
M Firth |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 334 |
REF8.0336 |
27/10/2026 |
Harry Firth |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 335 |
REF8.0337 |
27/10/2026 |
Zoe Marshall |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 336 |
REF8.0338 |
27/10/2026 |
Shannon Martin |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 337 |
REF8.0339 |
27/10/2026 |
Ashley Martin |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 338 |
REF8.0340 |
27/10/2026 |
Tilly Martin |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 339 |
REF8.0341 |
27/10/2026 |
Heather Martin |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 340 |
REF8.0342 |
27/10/2026 |
Keith Martin |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 341 |
REF8.0343 |
27/10/2026 |
Sopheana Cartledge |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 342 |
REF8.0344 |
27/10/2026 |
C Cartledge |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 343 |
REF8.0345 |
27/10/2026 |
D Cartledge |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 344 |
REF8.0346 |
27/10/2026 |
Charlotte Pinder |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219, EXAM 222 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 345 |
REF8.0347 |
27/10/2026 |
Michael Hough |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 346 |
REF8.0348 |
27/10/2026 |
Helena Wall |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 347 |
REF8.0349 |
27/10/2026 |
Ryan Palmer |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 348 |
REF8.0350 |
27/10/2026 |
Calum Bond |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219, EXAM 222 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0301 - REF8.0350 |
|
|
|
|
| 349 |
REF8.0351 |
27/10/2026 |
Kerry Siddall |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219, EXAM 222 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 350 |
REF8.0352 |
27/10/2026 |
Kim Palmer |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 351 |
REF8.0353 |
27/10/2026 |
Alison Bloodworth |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 352 |
REF8.0354 |
27/10/2026 |
Andrew Walton-McBain |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219, EXAM 187A |
FMM33 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 353 |
REF8.0355 |
27/10/2026 |
Elizabeth Walton-McBain |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219, EXAM 187A |
FMM33 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 354 |
REF8.0356 |
27/10/2026 |
Emma Lines |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 355 |
REF8.0357 |
27/10/2026 |
Sophie Jones |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 356 |
REF8.0358 |
27/10/2026 |
Dawne Foy |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 357 |
REF8.0359 |
27/10/2026 |
Jean Needham |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 358 |
REF8.0360 |
27/10/2026 |
Luke Browse |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 359 |
REF8.0361 |
27/10/2026 |
Alice Ord |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 360 |
REF8.0362 |
27/10/2026 |
Elizabeth Costello |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 361 |
REF8.0363 |
27/10/2026 |
Ian Smith |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM28 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 362 |
REF8.0364 |
27/10/2026 |
Kerry Hicks |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 363 |
REF8.0365 |
27/10/2026 |
Faye Costello |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 364 |
REF8.0366 |
27/10/2026 |
Sally Levitt |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 365 |
REF8.0367 |
27/10/2026 |
Not specified |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 366 |
REF8.0368 |
27/10/2026 |
Julie Goude |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 367 |
REF8.0369 |
27/10/2026 |
Craig Burley |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 368 |
REF8.0370 |
27/10/2026 |
Rebecca Cockman |
Email |
Individual |
|
EXAM 222 |
Not specified |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 369 |
REF8.0371 |
27/10/2026 |
Sarah Hartwell |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 370 |
REF8.0372 |
27/10/2026 |
Joyce O’Neill |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 371 |
REF8.0373 |
27/10/2026 |
James Burley |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 372 |
REF8.0374 |
27/10/2026 |
Joanne Gosling |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 373 |
REF8.0375 |
27/10/2026 |
Cheryl Hall |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM33 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 374 |
REF8.0376 |
27/10/2026 |
Kate Harris |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 375 |
REF8.0377 |
27/10/2026 |
Angela Fields |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 376 |
REF8.0378 |
27/10/2026 |
Emma Dowd |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 377 |
REF8.0379 |
27/10/2026 |
Paul Foster and Annabel Marshall-Foster |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 378 |
REF8.0380 |
27/10/2026 |
Rob Hardcastle |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 379 |
REF8.0381 |
27/10/2026 |
Mark Ash |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 380 |
REF8.0382 |
27/10/2026 |
Lisa Ives |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 222 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 381 |
REF8.0383 |
27/10/2026 |
Emma Mott |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 382 |
REF8.0384 |
27/10/2026 |
Sarah Traveller-Watson |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 383 |
REF8.0385 |
27/10/2026 |
Sarah Ryall |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 384 |
REF8.0386 |
27/10/2026 |
Not specified |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 385 |
REF8.0387 |
27/10/2026 |
Diane Ramsden |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 221 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 386 |
REF8.0388 |
27/10/2026 |
Andy Patrick |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 387 |
REF8.0389 |
27/10/2026 |
Steven Ives |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 221 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 388 |
REF8.0390 |
27/10/2026 |
Richard Baines |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 389 |
REF8.0391 |
27/10/2026 |
Ian Hill |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 390 |
REF8.0392 |
27/10/2026 |
Pauline Bower |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 391 |
REF8.0393 |
27/10/2026 |
Tania Webster |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 392 |
REF8.0394 |
27/10/2026 |
Catherine Badger |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 221 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 393 |
REF8.0395 |
27/10/2026 |
Joss Englert |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 394 |
REF8.0396 |
27/10/2026 |
Andrew Webster |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 395 |
REF8.0397 |
27/10/2026 |
Josh Ludlam |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 396 |
REF8.0398 |
27/10/2026 |
Katie Birkwood |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 221, EXAM 219, EXAM 222 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 397 |
REF8.0399 |
27/10/2026 |
Kay Harris |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 398 |
REF8.0400 |
27/10/2026 |
Evangeline Walton-McBain |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219, EXAM 187A |
FMM33 |
Hyperlink to view coments REF8.0351 - REF8.0400 |
|
|
|
|
| 399 |
REF8.0401 |
27/10/2026 |
Peter Pearson |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 400 |
REF8.0402 |
27/10/2026 |
Richard Pearson |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 401 |
REF8.0403 |
27/10/2026 |
C Abbott |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 402 |
REF8.0404 |
28/10/2026 |
Kay Dyche |
Email |
Individual |
|
EXAM 221, EXAM 219, EXAM 222 |
Not specified |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 403 |
REF8.0405 |
28/10/2026 |
Jackie Deffley |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 404 |
REF8.0406 |
28/10/2026 |
Sandra Hezseltine |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 405 |
REF8.0407 |
28/10/2026 |
Linzi Drummond |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 406 |
REF8.0409 |
28/10/2026 |
Lydia Stables |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 407 |
REF8.0410 |
28/10/2026 |
Rachael Nixon |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 408 |
REF8.0411 |
28/10/2026 |
Rachel Develin |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 409 |
REF8.0412 |
28/10/2026 |
Carol Simcox |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM16 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 410 |
REF8.0413 |
28/10/2026 |
Chris Cooper |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219, EXAM 222 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 411 |
REF8.0414 |
28/10/2026 |
Laura Gratton |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 412 |
REF8.0415 |
28/10/2026 |
Jo Thornton |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 413 |
REF8.0416 |
28/10/2026 |
Not specified |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 414 |
REF8.0417 |
28/10/2026 |
Rebecca McQueen and Christopher Ridley |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 415 |
REF8.0418 |
28/10/2026 |
Kirsty Savage |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 416 |
REF8.0419 |
28/10/2026 |
Stephen Bates |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 417 |
REF8.0420 |
28/10/2026 |
Julie Gilbey |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 418 |
REF8.0421 |
28/10/2026 |
Michelle Rowett |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 419 |
REF8.0422 |
28/10/2026 |
Chris Ridley |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 420 |
REF8.0423 |
28/10/2026 |
Rachel Patrick |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 421 |
REF8.0424 |
28/10/2026 |
Louie Develin |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 422 |
REF8.0425 |
28/10/2026 |
Rob Drummond |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 423 |
REF8.0426 |
28/10/2026 |
Louise Tribe |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 424 |
REF8.0427 |
28/10/2026 |
Anthony Bailey |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 425 |
REF8.0428 |
28/10/2026 |
Mally Hague |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 426 |
REF8.0429 |
28/10/2026 |
L Mason |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 427 |
REF8.0430 |
28/10/2026 |
Gary Hall |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219, EXAM 187A |
FMM33 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 428 |
REF8.0431 |
28/10/2026 |
Charlotte Spencer |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 429 |
REF8.0432 |
28/10/2026 |
Kay Cawthron |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 430 |
REF8.0433 |
28/10/2026 |
Laura Stockley |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 431 |
REF8.0434 |
28/10/2026 |
Gill Travis |
Email |
Chapeltown, Ecclesfield & Grenoside Save Our Green Belt Action Group |
|
Schedule of Proposed Further Main Modifications, EXAM 219, EXAM 187A |
FMM33, FMM31, FMM28, FMM5, FMM7 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 432 |
REF8.0435 |
28/10/2026 |
Robert Neylan |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 433 |
REF8.0436 |
28/10/2026 |
Steve Froggatt |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219, EXAM 221 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 434 |
REF8.0437 |
28/10/2026 |
David Bly |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 435 |
REF8.0438 |
28/10/2026 |
Diane Cutts |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 436 |
REF8.0439 |
28/10/2026 |
David Kinsey |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 437 |
REF8.0440 |
28/10/2026 |
Michael Parkin |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM27, FMM30 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 438 |
REF8.0441 |
28/10/2026 |
Michael Parkin |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 187A |
FMM33 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 439 |
REF8.0442 |
28/10/2026 |
Michael Parkin |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, Integrated Impact Assessment Note |
FMM3, FMM33 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 440 |
REF8.0443 |
28/10/2026 |
Michael Parkin |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, Sustainability Appraisal Note |
FMM23 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 441 |
REF8.0444 |
28/10/2026 |
James Fieldsend |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 442 |
REF8.0445 |
28/10/2026 |
Shane Simpson |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 443 |
REF8.0446 |
28/10/2026 |
Not specified |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 444 |
REF8.0447 |
28/10/2026 |
Isobel Dent |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 445 |
REF8.0449 |
28/10/2026 |
Hannah Southam |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 446 |
REF8.0450 |
28/10/2026 |
Susan Atack |
Email |
Individual |
|
EXAM 221 |
Not specified |
Hyperlink to view coments REF8.0401 - REF8.0450 |
|
|
|
|
| 447 |
REF8.0451 |
28/10/2026 |
Donald and Jean Brocklehurst |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 448 |
REF8.0452 |
28/10/2026 |
Sarah Deighton |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5, FMM28, FMM33 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 449 |
REF8.0453 |
28/10/2026 |
Reuben |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 450 |
REF8.0454 |
28/10/2026 |
Andrew Robinson |
Email |
Individual |
|
EXAM 130C, EXAM 219, EXAM 187A |
FMM33, FMM28, FMM5 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 451 |
REF8.0455 |
28/10/2026 |
Esther Ellis |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 452 |
REF8.0456 |
28/10/2026 |
Laura Burns |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 453 |
REF8.0457 |
28/10/2026 |
Brian Peck |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 454 |
REF8.0458 |
28/10/2026 |
Not specified |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5, FMM28, FMM33 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 455 |
REF8.0459 |
28/10/2026 |
Roger Hardwick |
Email |
Individual |
|
EXAM 222, EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 456 |
REF8.0460 |
28/10/2026 |
Beryl Dyche |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219, EXAM 222 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 457 |
REF8.0461 |
28/10/2026 |
Not specified |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5, FMM28, FMM33 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 458 |
REF8.0462 |
28/10/2026 |
Stephanie Forster |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 459 |
REF8.0463 |
28/10/2026 |
Andre Bommele |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 460 |
REF8.0464 |
28/10/2026 |
Brian Connolly |
Email |
Chequered Flag Land Ltd |
|
Schedule of Proposed Further Main Modifications, EXAM 224 |
FMM1, FMM5, FMM32 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 461 |
REF8.0465 |
28/10/2026 |
Geoffrey Dyche |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219, EXAM 222 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 462 |
REF8.0466 |
28/10/2026 |
Jane Egan |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 221 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 463 |
REF8.0467 |
28/10/2026 |
Not specified |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219, EXAM 222 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 464 |
REF8.0468 |
28/10/2026 |
Chelsey Deighton |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5, FMM28, FMM33 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 465 |
REF8.0469 |
28/10/2026 |
Neil Deighton |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5, FMM28, FMM33 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 466 |
REF8.0470 |
28/10/2026 |
Andrew Traveller-Watson |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 467 |
REF8.0471 |
28/10/2026 |
Susan Smith |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5, FMM28, FMM33 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 468 |
REF8.0472 |
28/10/2026 |
Susan Davidson |
Email |
Sheffield and Rotherham Wildlife Trust |
|
Schedule of Proposed Further Main Modifications, IIA Sustainability Appraisal Note |
FMM5, FMM16, FMM29, FMM31 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 469 |
REF8.0473 |
28/10/2026 |
Lewis Green |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 470 |
REF8.0474 |
28/10/2026 |
Not specified |
Email |
Sheffield Green Belt Alliance |
|
Integrated Impact Assessment, EXAM 219, EXAM 130C, EXAM 217C |
FMM6, FMM7, FMM14, FMM18, FMM26, FMM27, FMM28, FMM29, FMM31 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 471 |
REF8.0475 |
28/10/2026 |
Tim Russell |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 472 |
REF8.0476 |
28/10/2026 |
Callum Mynett |
Email |
Individual |
|
Schedule of Proposed Further Modifications, EXAM 219 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 473 |
REF8.0477 |
28/10/2026 |
Stephen Wright |
Email |
Individual |
|
Schedule of Proposed Further Modifications, EXAM 219 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 474 |
REF8.0478 |
28/10/2026 |
Natalie Wright |
Email |
Individual |
|
Schedule of Proposed Further Modifications, EXAM 219 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 475 |
REF8.0479 |
28/10/2026 |
Nick Gascoyne |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 476 |
REF8.0480 |
28/10/2026 |
Paul Hicken |
Email |
Individual |
|
EXAM 221 |
Not specified |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 477 |
REF8.0481 |
28/10/2026 |
Claire Newman |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 478 |
REF8.0482 |
28/10/2026 |
Lauren Hague |
Email |
Individual |
|
Schedule of Proposed Further Modifications, EXAM 219, EXAM 222 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 479 |
REF8.0483 |
28/10/2026 |
Susan Davidson |
Email |
Parish Councillor |
|
EXAM 224, EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 480 |
REF8.0484 |
28/10/2026 |
Carl Cornthwaite |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 481 |
REF8.0485 |
28/10/2026 |
Robert Ritchie |
Email |
Individual |
|
EXAM 219 |
Not specified |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 482 |
REF8.0486 |
28/10/2026 |
Paul Allison |
Email |
Individual |
|
EXAM 219, EXAM 187A |
FMM33 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 483 |
REF8.0487 |
28/10/2026 |
Jack Young |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, IIA Sustainability Appraisal Note, EXAM 219 |
FMM27, FMM30, FMM33 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 484 |
REF8.0488 |
28/10/2026 |
Katy Jackson |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 485 |
REF8.0489 |
28/10/2026 |
Katy Orton |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 486 |
REF8.0490 |
28/10/2026 |
Aaron Coleman |
Email |
Individual |
|
EXAM 219 |
|
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 487 |
REF8.0491 |
28/10/2026 |
Wayne Austin |
Email |
Individual |
|
EXAM 219 |
|
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 488 |
REF8.0492 |
28/10/2026 |
Charlie Duggan |
Email |
Individual |
|
EXAM 219 |
|
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 489 |
REF8.0493 |
28/10/2026 |
Kerrie Henderson |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 490 |
REF8.0494 |
28/10/2026 |
Jacqui Bellamy |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 491 |
REF8.0495 |
28/10/2026 |
George Loxley |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 492 |
REF8.0496 |
28/10/2026 |
Marie Maher |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 493 |
REF8.0497 |
28/10/2026 |
Tracy Wilson |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 494 |
REF8.0498 |
28/10/2026 |
Kay Smith |
Email |
Individual |
|
EXAM 219 |
|
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 495 |
REF8.0499 |
28/10/2026 |
Karen Riley |
Email |
Individual |
|
Schedule of Proposed Further Modifications, EXAM 219 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 496 |
REF8.0500 |
28/10/2026 |
Rebecca Hawley |
Email |
Individual |
|
Schedule of Proposed Further Modifications, EXAM 219 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0451 - REF8.0500 |
|
|
|
|
| 497 |
REF8.0501 |
28/10/2026 |
Tracey Butler |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 498 |
REF8.0502 |
28/10/2026 |
Richard Staniforth |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 499 |
REF8.0503 |
28/10/2026 |
Stephanie Forster |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 500 |
REF8.0504 |
28/10/2026 |
Steven Stroud |
Email |
James Bailey Planning |
Sheffield Green Belt Alliance |
Integrated Impact Assessment, XAM 130C, EXAM 187A, EXAM 221, EXAM 222 |
FMM3, FMM5, FMM27, FMM30, FMM33 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 501 |
REF8.0505 |
28/10/2026 |
Stephen Smith |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 502 |
REF8.0506 |
28/10/2026 |
Benedict Walton-McBain |
Email |
Individual |
|
EXAM 219, EXAM 187A |
Not specified |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 503 |
REF8.0507 |
28/10/2026 |
Matt Weigold |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 504 |
REF8.0508 |
28/10/2026 |
Anne Hanson |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 505 |
REF8.0509 |
28/10/2026 |
Michael Forster |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 506 |
REF8.0510 |
28/10/2026 |
Joe and Kathryn Matthews |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 507 |
REF8.0511 |
28/10/2026 |
Not specified |
Email |
S12 Green Belt Action Group |
|
Schedule of Further Main Modifications, EXAM 219, EXAM 187A |
FMM5, FMM16, FMM29, FMM33 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 508 |
REF8.0512 |
28/10/2026 |
Jordan Beckingham |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 509 |
REF8.0513 |
28/10/2026 |
Andrew Towlerton |
Email |
Ecclesfield Parish Council |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5, FMM21, FMM224, FMM25, FMM31 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 510 |
REF8.0515 |
28/10/2026 |
Nick Armstrong |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 511 |
REF8.0516 |
28/10/2026 |
Luke Goddard |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 221, EXAM 219, EXAM 222 |
FMM5, FMM16, FMM29, FMM32 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 512 |
REF8.0517 |
28/10/2026 |
C Wager |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 513 |
REF8.0518 |
28/10/2026 |
Alistair Mullan |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 514 |
REF8.0519 |
28/10/2026 |
M Conrad and ER Conrad |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 515 |
REF8.0520 |
28/10/2026 |
Joanna Lomas |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 516 |
REF8.0521 |
28/10/2026 |
Derek Walton |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219, EXAM 187A |
FMM33 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 517 |
REF8.0522 |
28/10/2026 |
Gary Lines |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 518 |
REF8.0523 |
28/10/2026 |
Not specified |
Email |
Individual |
|
EXAM 221, EXAM 222 |
Not specified |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 519 |
REF8.0524 |
28/10/2026 |
Amanda Finbow-Froggatt |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 520 |
REF8.0525 |
28/10/2026 |
Diane Bailey |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 521 |
REF8.0526 |
28/10/2026 |
Kristy Robinson |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 522 |
REF8.0527 |
28/10/2026 |
Sarah Salmons |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 523 |
REF8.0528 |
28/10/2026 |
Timothy Goddard |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 221, EXAM 219, EXAM 222 |
FMM5, FMM16, FMM29, FMM32 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 524 |
REF8.0529 |
28/10/2026 |
Faith Saunches |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 525 |
REF8.0530 |
28/10/2026 |
Denise and Alan Casbolt |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 526 |
REF8.0531 |
28/10/2026 |
Not specified |
Email |
Save S13 Green Belt: The Sapphire McCarthy Campaign |
|
EXAM 219 |
FMM |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 527 |
REF8.0532 |
28/10/2026 |
David Badger |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 221, EXAM 219, EXAM 222 |
FMM5, FMM16 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 528 |
REF8.0533 |
28/10/2026 |
Oliver Blensdorf |
Email |
Moss Valley Wildlife Group |
|
Schedule of Further Main Modifications |
FMM29 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 529 |
REF8.0534 |
28/10/2026 |
Timothy Goddard |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 530 |
REF8.0535 |
28/10/2026 |
Tracey Evans |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 531 |
REF8.0536 |
28/10/2026 |
Carlton Saunches |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 221, EXAM 219, EXAM 222 |
FMM5, FMM16, FMM29, FMM32 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 532 |
REF8.0537 |
28/10/2026 |
Lynn Cocker |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219, EXAM 187A |
FMM28 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 533 |
REF8.0538 |
28/10/2026 |
V. Henot |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 534 |
REF8.0539 |
28/10/2026 |
Jennifer Poole |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 535 |
REF8.0540 |
28/10/2026 |
Richard Nutbrown |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 536 |
REF8.0541 |
28/10/2026 |
Victoria Palmer |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 537 |
REF8.0542 |
28/10/2026 |
April Gerrietty |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 538 |
REF8.0543 |
28/10/2026 |
Stephanie Oliver-Beech |
Email |
Individual |
|
EXAM 219 |
|
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 539 |
REF8.0544 |
28/10/2026 |
Deb Newton-Nutbrown |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 540 |
REF8.0545 |
28/10/2026 |
Not specified |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 541 |
REF8.0546 |
28/10/2026 |
Stephen Haylock |
Email |
Individual |
|
Schedule of Proposed Further Main Modification, EXAM 219 |
FMM5 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 542 |
REF8.0547 |
28/10/2026 |
Not specified |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 221, EXAM 219, EXAM 222 |
FMM5, FMM16, FMM29, FMM32 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 543 |
REF8.0548 |
28/10/2026 |
Dylan Arnold |
Email |
Individual |
|
EXAM 219 |
|
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 544 |
REF8.0549 |
28/10/2026 |
Kylian Lemarechal |
Email |
Quod |
British Land Company PLC |
EXAM 216 |
|
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 545 |
REF8.0550 |
28/10/2026 |
Nicole Booth |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0501 - REF8.0550 |
|
|
|
|
| 546 |
REF8.0551 |
28/10/2026 |
Peter Sorby |
Email |
Individual |
|
EXAM 219, EXAM 221, EXAM 222 |
FMM16, FMM5 |
Hyperlink to view coments REF8.0551 - REF8.0572 |
|
|
|
|
| 547 |
REF8.0552 |
28/10/2026 |
Jane Nattrass |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0551 - REF8.0572 |
|
|
|
|
| 548 |
REF8.0553 |
28/10/2026 |
Jandia Martinez Pastrana |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0551 - REF8.0572 |
|
|
|
|
| 549 |
REF8.0554 |
28/10/2026 |
Martin & Rachel Williams |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0551 - REF8.0572 |
|
|
|
|
| 550 |
REF8.0555 |
28/10/2026 |
Hayley Gray |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0551 - REF8.0572 |
|
|
|
|
| 551 |
REF8.0556 |
28/10/2026 |
Not specified |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0551 - REF8.0572 |
|
|
|
|
| 552 |
REF8.0557 |
28/10/2026 |
Callum Walker |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0551 - REF8.0572 |
|
|
|
|
| 553 |
REF8.0558 |
28/10/2026 |
Victoria Walsh |
Email |
Individual |
|
EXAM 221 |
|
Hyperlink to view coments REF8.0551 - REF8.0572 |
|
|
|
|
| 554 |
REF8.0559 |
28/10/2026 |
Peter Barlow |
Email |
Individual |
|
EXAM 219, EXAM 187A |
|
Hyperlink to view coments REF8.0551 - REF8.0572 |
|
|
|
|
| 555 |
REF8.0560 |
28/10/2026 |
Sophie Waller |
Email |
Individual |
|
EXAM 219, EXAM 187A |
|
Hyperlink to view coments REF8.0551 - REF8.0572 |
|
|
|
|
| 556 |
REF8.0561 |
28/10/2026 |
Kathryn Waller |
Email |
Individual |
|
EXAM 219, EXAM 187A |
|
Hyperlink to view coments REF8.0551 - REF8.0572 |
|
|
|
|
| 557 |
REF8.0562 |
28/10/2026 |
Liam Roe |
Email |
Individual |
|
EXAM 219, EXAM 187A |
|
Hyperlink to view coments REF8.0551 - REF8.0572 |
|
|
|
|
| 558 |
REF8.0563 |
28/10/2026 |
Kara-Jo Waller |
Email |
Individual |
|
EXAM 219, EXAM 187A |
|
Hyperlink to view coments REF8.0551 - REF8.0572 |
|
|
|
|
| 559 |
REF8.0564 |
28/10/2026 |
Clive Betts |
Email |
MP |
|
EXAM 222, EXAM 221, EXAM 216 |
Not specified |
Hyperlink to view coments REF8.0551 - REF8.0572 |
|
|
|
|
| 560 |
REF8.0565 |
28/10/2026 |
Marie Tidball |
Email |
MP |
|
Schedule of Further Main Modifications, EXAM 219, EXAM 130C |
FMM6, FMM7, FMM27,FMM28, FMM31, FMM33 |
Hyperlink to view coments REF8.0551 - REF8.0572 |
|
|
|
|
| 561 |
REF8.0566 |
28/10/2026 |
Pierre Laubscher |
Email |
Save Land at Lodge Moor and Redmires Conduit Action Group |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0551 - REF8.0572 |
|
|
|
|
| 562 |
REF8.0567 |
28/10/2026 |
Lauren Waller |
Email |
Individual |
|
EXAM 219, EXAM 187A |
|
Hyperlink to view coments REF8.0551 - REF8.0572 |
|
|
|
|
| 563 |
REF8.0568 |
28/10/2026 |
Jonathan Hobson |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0551 - REF8.0572 |
|
|
|
|
| 564 |
REF8.0569 |
28/10/2026 |
Charlotte Corker |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF8.0551 - REF8.0572 |
|
|
|
|
| 565 |
REF8.0570 |
28/10/2026 |
Stephanie Waller |
Email |
Individual |
|
EXAM 219, EXAM 187A |
|
Hyperlink to view coments REF8.0551 - REF8.0572 |
|
|
|
|
| 566 |
REF8.0571 |
28/10/2026 |
David Cocker |
Email |
Individual |
|
Schedule of Proposed Further Main Modifications, EXAM 219, EXAM 187A |
FMM28 |
Hyperlink to view coments REF8.0551 - REF8.0572 |
|
|
|
|
| 567 |
REF8.0572 |
30/10/2026 |
Not specified |
Email |
Individual |
|
Not specified |
Not specified |
Hyperlink to view coments REF8.0551 - REF8.0572 |
|
|
|
|
| 568 |
REF9.0001 |
28/09/2026 |
J Cooper |
Letter |
Individual |
|
Not Specified |
Not Specified |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 569 |
REF9.0002 |
01/10/2026 |
E Chambers |
Letter |
Individual |
|
Not Specified |
Not Specified |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 570 |
REF9.0003 |
12/10/2026 |
Mr & Mrs G Lax |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 571 |
REF9.0004 |
12/10/2026 |
Mr & Mrs Holmes |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 572 |
REF9.0005 |
13/10/2026 |
Leigh & David Robinson |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 573 |
REF9.0006 |
13/10/2026 |
Ian & Kevin Gibbard-Jackson |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 574 |
REF9.0007 |
14/10/2026 |
J Robinson |
Letter |
Individual |
|
Not Specified |
Not Specified |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 575 |
REF9.0008 |
15/10/2026 |
Susan Midgley |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 576 |
REF9.0009 |
15/10/2026 |
J Robinson |
Letter |
Individual |
|
Not Specified |
Not Specified |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 577 |
REF9.0010 |
16/10/2026 |
Mr & Mrs Walker |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 578 |
REF9.0011 |
16/10/2026 |
Danielle Revill-Crookes |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 579 |
REF9.0012 |
19/10/2026 |
A & J Gell |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 580 |
REF9.0013 |
19/10/2026 |
A & C Cronshaw |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 581 |
REF9.0014 |
19/10/2026 |
Michele Parkin |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 582 |
REF9.0015 |
19/10/2026 |
Mr & Mrs C Yates |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 583 |
REF9.0016 |
21/10/2026 |
Harry Gillott |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 584 |
REF9.0017 |
21/10/2026 |
Ruth Nicholson |
Letter |
Individual |
|
Not Specified |
Not Specified |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 585 |
REF9.0018 |
22/10/2026 |
Jeffrey Howell |
Letter |
Individual |
|
Not Specified |
Not Specified |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 586 |
REF9.0019 |
26/10/2026 |
P Humpary |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 587 |
REF9.0020 |
26/10/2026 |
B & J Read |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM32 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 588 |
REF9.0021 |
28/10/2026 |
Mr & Mrs T Marsden |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM33 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 589 |
REF9.0022 |
28/10/2026 |
Sheryl Thompson |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM34 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 590 |
REF9.0023 |
28/10/2026 |
Mr Jamie Titterton |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM35 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 591 |
REF9.0024 |
27/10/2026 |
Gillian Wilson |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM35 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 592 |
REF9.0025 |
29/10/2026 |
J Stevenson |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM35 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 593 |
REF9.0026 |
29/10/2026 |
S Stevenson |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM35 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 594 |
REF9.0027 |
29/10/2026 |
P Stevenson |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM35 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 595 |
REF9.0028 |
29/10/2026 |
K Stevenson |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM35 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 596 |
REF9.0029 |
30/10/2026 |
M Wilkinson |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM35 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 597 |
REF9.0030 |
30/10/2026 |
T Wilkinson |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM5, FMM29, FMM35 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 598 |
REF9.0031 |
02/11/2026 |
S Walker |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications; Integrated Impact Assessment |
FMM31 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 599 |
REF9.0032 |
02/11/2026 |
J Walker |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications |
FMM16, FMM33 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 600 |
REF9.0033 |
02/11/2026 |
R Gale |
Letter |
Individual |
|
Not Specified |
Not Specified |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 601 |
REF9.0034 |
02/11/2026 |
J Burkinshaw |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications; Integrated Impact Assessment |
FMM16 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 602 |
REF9.0035 |
02/11/2026 |
B Dalton |
Letter |
Individual |
|
EXAM219 |
|
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 603 |
REF9.0036 |
02/11/2026 |
K Thomas |
Letter |
Individual |
|
Integrated Impact Assessment |
|
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 604 |
REF9.0037 |
02/11/2026 |
D Thomas |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications; Integrated Impact Assessment |
FMM33 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 605 |
REF9.0038 |
02/11/2026 |
Michael Siddall |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications; Integrated Impact Assessment |
FMM16 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 606 |
REF9.0039 |
02/11/2026 |
Margaret Siddall |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications; Integrated Impact Assessment |
FMM5, FMM16, FMM31 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 607 |
REF9.0040 |
02/11/2026 |
L Fry |
Letter |
Individual |
|
Schedule of Proposed Further Main Modifications; Integrated Impact Assessment |
FMM16 |
Hyperlink to view coments REF9.0001 - REF9.0040 |
|
|
|
|
| 608 |
4963817 |
15/09/2026 |
John Ford |
Online |
|
|
Consequential Changes to the Policies Map as a result of Proposed Further Main Modifications |
|
|
Yes |
No |
you are not looking at the bigger picture of where the additional traffic will go ie the main arterial roads are already clogged up and every house built in these modern times has 2 cars per house. Public transport is currently not efficient to transfer all this traffic to transfer to it. So there may be minimal impact locally in the bigger picture you have not solved the arterial road issue |
Solve the main arterial Road issues (drive through Hillsborough as an example of traffic issues) and improve and increase public transport. |
| 609 |
4963869 |
15/09/2026 |
Peter Craven |
Online |
|
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
SES30 |
|
No |
No |
As I don't know legalities I am just putting what I see as a sensible compromise.
On the plan I see of proposed houses on SES30 I see some houses manage to have a green space left between them and the new development but others may have houses up to their fence!! Why is this? Can a green buffer not be left between all the new development and existing properties on Richworth road and Beaver drive.! Which is already affecting house prices! Causing sales to be cancelled or potential buyers put off! |
As i cannot upload what I need to show, I would leave a green area after all the original houses equivalent to what has been left behind most to lessen the impact on present home owners who are objecting. |
| 610 |
4966662 |
16/09/2026 |
Victoria Kidman-Steele |
Online |
|
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
|
|
No |
No |
I consider the Local Plan for building on Green Belt land in S35 to be Bradley throughout and researched. The fact that you want add a large housing estate to the Chapeltown area, which is already buckling under a large amount of traffic is ridiculous. Traffic is already at a standstill from 07:30-10:30 and 14:30 until 18:00 and you want to add more cars? All because we have a train station which only has two trains an hour to Sheffield which is ridiculous. Just look at the amount of derelict industrial land lying all over Sheffield surely these should be sorted out first rather than building on fields and tearing down trees. The fact that Sheffield CIty Council has a surplus in its budget is beyond me with the amount of things that are wrong with this CIty. We need the drains clearing, to combat flooding, trees planting to combat climate change rather than chopping them down because they cause bumps in the pavement. There are more empty offices in this City than are necessary, surely these could be changed into flats. Sheffield is the poor city because all companies go to Leeds and if the Universities went under it would be done. |
Consider building on the derelict brownfield sites dotted around the City from Wards End to Neeps End . What about building homes near Sheffield Airport and the industrial estates near there |
| 611 |
4970318 |
17/09/2026 |
John Booker |
Online |
Reform UK |
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
|
|
Yes |
Yes |
|
|
| 612 |
4970383 |
17/09/2026 |
John Booker |
Online |
Reform UK |
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
|
|
Yes |
No |
Sheffield's Local Plan is contrary to what Labour promised in its manifesto- "to restore and protect our natural world and unlock the building of homes without weakening environmental protections"
On 14 August, Prime Minister Andy Burnham said: "The ability to grow our own food is national security, and I will treat it that way." The Government's 2026 Land Use Framework takes the same direction: food security is national security, Best and Most Versatile (BMV) agricultural land should be safeguarded from permanent land-use change, and strategic development decisions should consider food-security implications. BMV land is scarce in Sheffield. Defra's Predictive Agricultural Land Classification Map indicates that just 7.53% of Sheffield's mapped agricultural land is predicted BMV. Yet representations to the Sheffield Local Plan examination indicate that over 120 hectares, more than half of the approximately 230 hectares proposed for Greenbelt release, is predicted BMV. This represents approximately 10% of Sheffield's entire predicted BMV farmland. At a time when national policy is placing increasing importance on food security, climate resilience and protecting productive land, the permanent loss of around one-tenth of Sheffield's best farmland is significant. We believe this council should recognise the scale of this loss and the importance of demonstrating that poorer-quality land and non-Greenbelt alternatives have been fully exhausted before productive farmland is permanently developed.
Development that infills every bit of greenery in a place significantly reduces the liveability of the place and diminishes health and wellbeing, not least because of the huge reduction in air quality. Current proposals would result in greater pressure on infrastructure and local services, schools, GPs, dentists, etc. Most of the infrastructure is overwhelmed and cannot cope, due to topographical limitations and inadequate forward planning by past and current SCC policies.
The Planning Inspectorate report "swept under the carpet" concerns around Sheffield's Greenbelt housing plan. The report ignores campaigners' concerns. Sheffield's Greenbelt Alliance has moved heaven and earth to present sensible and thoroughly researched arguments against removing the fourteen sites from Sheffield's Greenbelt. I would like to thank the Greenbelt Alliance for their input on this article.
The Planning Inspectorate's report is a slap in the face of all the hard work this alliance has undertaken. |
Total, permanent and unbreakable protection for Sheffield precious countryside
Not surrendering one inch of its Greenbelt
Creating a new Local Plan
Focusing on utilising brownfield sites
Listening to local residents, showing compassion to their concerns and following the National Planning Policy Framework (NPPF) |
| 613 |
4980071 |
21/09/2026 |
Philippa Atkin |
Online |
|
|
Integrated Impact Assessment: Sustainability Appraisal note to respond to Examination queries and Further Main Modifications |
|
|
Yes |
Yes |
Is all new devt fully solar not specified including industrial . Is it grey water run off and permeable paving ? Is the new housing 3/4 bed housing typical of housing devts locally or will there be 1/2 bedroom devts with outdoor space or balconies , suitable for high proportion of elderly local population to downsize to , so naturally freeing up existing larger housing stock. What planning gains will feed into this I e wildlife sites funded by estate service charges like local species tree planting or ponds or bat habitat etc and wildlife corridors |
|
| 614 |
4980787 |
21/09/2026 |
Ian Pearson |
Online |
|
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
FMM13 |
|
Yes |
No |
The GTAA) (2019) - in relation to the FFM - is not necessarily ‘not legally compliant’.
What the Plan has stated is that it will ‘revisit the evidence on need and produce a new GTAA for Sheffield within 12 months of adoption of the current plan and will assess whether there has been a significant change in local circumstances’.
It continues: ‘If so, the Council will commence work on a new local plan’.
The document earlier states that the 2019 plan ‘is likely to represent an underestimate of need’.
Questions arise at this point.
• Does the reference to ‘new plan’ relate to a GTAA document ?
• Will the Gateway 1 ‘self assessment of readiness’ (in accordance with Regulation 21 of the Town and Country Planning (Local Planning) (England) Regulations 2026 - leading to ‘local plan preparation’ be a prelude to further amendments which will lead to GTAA housing included within the Greenbelt plan framework ?
• Have previous provisions for GTAA requirements been committed to documentation ?
• Would such provision, and subsequent housing, be centred exclusively within one housing development site or, would provision be shared amongst the provided ‘sites’ ? |
Any changes will depend upon the outcome of the main plan. |
| 615 |
4980804 |
21/09/2026 |
David Barton |
Online |
N/A |
N/A |
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
Entirety |
|
Yes |
No |
Traditional Architecture Design Codes should be a central component across this entire consultation and its various chapters and sections especially concerning new construction. It performs strongly on economic, ecological and environmental grounds as can be attested to by leading figures and organisations with academic studies that corroborate this. Please see my PDF Umbrella Representation for the various merits outlined including Placemaking and Greenery Proposals. A ban on demolition of buildings constructed prior to 1950 should be enacted as soon as possible with reconstructions of previously demolished historic buildings listed or not given full support for restoration and reuse.
Non-Designated Heritage Assets and unclassified historic buildings should also be given full protection and support against their demolition, such as selling of publicly owned historic buildings that will be demolished otherwise.
Historic buildings should be duly reconstructed authentically as they were.
Whilst present points are mostly find the shift to utilising authentic Traditional Architecture based Design Codes will mitigate concerns facing all key stakeholders ranging from incumbent local residents to the Local Authority and House Builders and prospective new residents and businesses alike. It does this by directly addressing the need for housing, the otherwise avoidable strain on the environment and surrounding biodiversity whilst enabling the complete Sheffield Area to shine and stand out as a source of economic activity that can withstand local, regional, national and international pressures. |
Utilise Authentic Traditional Architecture (TA) for new construction as this will mitigate challenges encountered by the LA and all key stakeholders including applicants and old and new residents and businesses.
Utilise Authentic Traditional Vernacular Architecture Design Codes for new construction whilst simultaneously protecting the Built Historic Environment with a ban on demolition of Old Builds constructed prior to 1950.
[Improve Supply Chains of Raw Materials which will in turn provide improved Supply chains of Physical Skills through utilising specialist Traditional Architects that can manage correct quantities of raw materials where originals are required so that authentic replicas may also be permitted to ease accessibility concerns.] |
| 616 |
4990559 |
24/09/2026 |
Anthony Fletcher |
Online |
|
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
|
|
No |
No |
I have two main concerns. The first is that Brown sites and other potential sites are not being considered because they are either too expensive or may not be developed in the time frame. 'May' here is doing a lot of work. All brown sites should be developed before green sites are considered. Brown or other sites within the city are evident from driving through Sheffield. The fact that they are more difficult, time consuming or expensive should not be a factor. The current Labour Government made it very clear in its manifesto that all other sites would be developed before Green Belt. This does not seem to be the case in this plan. The new documents highlight this concern. All sites within the city need to be considered without the councils low benchmark to disqualify them. That the council has taken too much time as well as rushing this process should not disqualify a site that could be used. My impression from looking at all the documents is that the review of Brown and other sites within the city has not been done correctly and to the right standard. Sites have been disqualified too readily. I believe the assessment of potential sites around Sheffield needs to be done again with clear and transparent reasons given to the public of why they are not suitable. Them being more difficult to develop should not be a reason to disqualify them. My second concern is that the proposed sites are not earmarked for social housing but affordable housing. The areas the plan stipulates for building on already has plenty of affordable housing available to buy. It is in other areas of Sheffield that there is no affordable housing. |
As said above the Brown sites and other potential sites in Sheffield need to be considered with a lower threshold for disqualification. Green Belt, as set out by the Labour government, should not be used until other sites are used. Other areas of Sheffield need to be used in the plan, areas where there is no affordable housing instead of the areas in the North of Sheffield where affordable housing is abundant. |
| 617 |
5002362 |
28/09/2026 |
Sarah Hammond |
Online |
|
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
NES38 |
|
No |
No |
The road infrastructure around S35 particularly The Wheel can not support the additional housing and traffic. The road in places is narrow for only 1 vehicle with the rain water overflow from fields regularly damaging the road, pave over the fields and there is less placed for the water to go |
Reduce and reconsider the sheer volume of houses planned for a green belt site. |
| 618 |
5002977 |
28/09/2026 |
Salah Sherif |
Online |
S13 protect our Greenbuilt campaign |
members steering group |
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
|
|
No |
No |
did not pass consultation with residents |
to be cancelled |
| 619 |
5003242 |
28/09/2026 |
Jake Askew |
Online |
|
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
FMM3 (revises MM97) |
|
No |
No |
As noted in the North East Area Profile, transport links are identified as being "under pressure" from existing growth. Furthermore the I believe the CPTN to be inaccurately assessed, given that as being former resident in Grenoside and now Chapeltown a service of 6+ Bus an hour is not reality. Given the terrible service provided by the current Stagecoach and First operators planned time schedules do not become reality with multiple buses delayed or cancelled. Furthermore the assessments to the North West and East in particular make reference to Tram Train projects which are wholly unfunded. |
A statement in the Local Plan identifying that fully funded Transport upgrade schemes breaking ground in line with Local School upgrades should be included to prevent developers capitalising prior to supporting services are guaranteed. The use of the statement "may be required" is not onerous. It is in developers interests to ensure that Transport Links are being progressed given it directly relates to a developments commercial appeal. |
| 620 |
5006469 |
29/09/2026 |
Paul Sheldon |
Online |
Sheffield City Council |
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
|
|
Yes |
Yes |
|
|
| 621 |
5020846 |
04/10/2026 |
Richard Banyard |
Online |
|
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
Exam 219 |
|
Yes |
No |
Dear Sirs
Grazing Land Between Lodge Moor Road and Redmires Conduit
Now that further details are available regarding of planning for the loss of Green Belt land at Lodge Moor such as Exam 44B, please find our comments as near-neighbours by the deadline.
It is understood that Sheffield City Council is under substantial national pressure to increase housing supply locally. We have assessed in detail what is on the website about this scheme, It is however immediately apparent from this review that many crucial issues (such as access to the site, schools, healthcare, shortage of local amenities, impact on the local community, etc) have been delayed or overlooked in the headlong rush to meet central dictates. In addition, other issues have been simply ignored altogether -such as impact on current local residents and near-neighbours, as well as whether the site is appropriate for a high-density/high social mix form of housing.
Specific issues:
Access
Lodge Moor Road is stated to be the main access point to the sites. However this a quiet, essentially singe-lane country road. The scheme proposal down-plays the problem that will be caused if this is in fact to be the principal access route to the site.
In particular, the current access point to Blackbrook Road has effectively no visibility splay to the south, so it is inconceivable that the increase in traffic (both during construction and thereafter) can be accommodated without a major road scheme- and or many accidents and traffic disruption.
In addition, no thought seems to have been given to the impact of increased traffic travelling form the west of the site, where again the nature of the country roads would not be suitable for any large increase in traffic.
Lodge Moor Road itself also has no pedestrianisation for much of its length.
The pedestrian pathways on Blackbrook Road would also no doubt be considerably increased. At present the pathway leading to the south up the hill from the junction of Lodge Moor Road and Blackbrook Road is extremely narrow and dangerous for CURRENT road traffic volumes. The new development would exacerbate this problem.
As regards access to the local main highway (Redmires Road), there are regular serious accidents at the junction between Blackbrook Road and Redmires Road – and the substantial increase in traffic (including construction traffic) will exacerbate this existing problem.
So, why have alternative access points to this large development been considered – for example a road from the western end of the site direct to the main Redmires Road?
Impact On Local Residents
Most local residents are retired or hard-working people who have purchased properties (at a significant financial premium) in order to enjoy a quiet residential area. Absolutely no consideration has been given to this factor. This can just be disregarded as "nimbyism". However if this scheme is to be a success and community cohesion enhanced, this concern is a genuine and real issue that should factored into decision making – and not just disregarded altogether as seems at present to be the case.
Nor has sufficient notice been given about the timescale for introducing this scheme which will alter substantially the nature of this part of Sheffield.
Construction Period
In addition, no account has been taken of the substantial increase in construction vehicles and plan for the construction period. This will increase danger when crossing roads (such as Blackbrook Road) which is already difficult to cross for local - mainly elderly -residents. The addition of constant noise, smells, and other disruption will also be deleterious for local residents who purchased their properties in or der to enjoy a quiet residential area.
Unsuitability Of Site
The planning documents indicate that the social mix and nature of the housing tenure will be almost entirely screwed towards those in social need. Why is a more balanced form of development being considered that will facilitate integration with the local community, rather than (as is proposed) a scheme that is likely to antagonise and alienate most local residents? The scheme seems almost entirely driven by a numbers-game dictated by central government.
In particular, the number of housing units proposed for this scheme render it almost inevitable for some form of medium/high-rise building will take place. This would be totally inappropriate for the street-scape of this part of the city which is almost entirely low-rise private residential units.
Further, the extremities of this western part of Sheffield has historically been one of comparative isolation - as exemplified by City Council moves in former times to develop a large remote infectious disease hospital, plus use of the nearby site as the largest Prisoner Of War camp in the UK. Simply “dumping” many families into this part of Sheffield that is still relatively remote and quiet – and also lacking many amenities - would not be conducive to their needs. For example, access to employment, main shopping areas and other facilities needed would appear to have been totally overlooked.
Specifically,, both primary and secondary schools are a considerable distance away, and the numbers of new children expected for the proposed scheme (say 400-500) would not justify development of a new more local school.
However, having this number of new children in an area of Sheffield that historically has been mainly for adults and retired people is an obvious recipe for social disharmony without addition of new youth facilities etc– that have been totally disregarded in the scheme as it stands.
Further, access to the local GP surgery and other health facilities is already difficult and the sudden influx proposed will only make things more difficult.
Flooding
The site selected is a potential flood risk, as has been recognised in the planning documents. In addition, the local sewage facility on Rochester Road (which inevitably would serve this proposed site) is already at capacity and has overflowed and flooded at times of heavy rain.
Environmental Impact
The impact on local wild-life is given cursory reference in the planning documents, and any detailed assessment reviews seem to have been delayed until a later stage of the planning process – by when it will be too late to make changes.
Cost Factors
The cost to the City Council of this development appears to have been totally overlooked. Land costs in this rea are substantial. Plus there will be substantial initial capital infrastructure cost, as well as the ongoing increased costs for meeting social housing costs. There is no evidence of any costings, cost benefit or cost comparison cost analysis having been carried out. This is a glaring error.
Yours faithfully
Richard and Nicola Banyard
Near-Neighbours
**REDACTED** |
|
| 622 |
5024543 |
05/10/2026 |
Mark Asquith |
Online |
|
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
SES28, SES29, SES30, SES03, SES08, SES10 |
|
No |
No |
The Further Main Modifications affecting SES28, SES29, SES30, SES03, SES08 and SES10 are not legally compliant or sound because the updated DEFRA Agricultural Land Classification (ALC) data (2025) materially changes the evidence base used for site selection. The Council’s own Site Selection Addendum confirms that SES29 and SES30 have changed from “poorer quality (YY)” to “higher quality (N)” agricultural land, meaning they are now Best and Most Versatile (BMV) land. Under NPPF Footnote 58, poorer‑quality land must be preferred where significant development of agricultural land is necessary.
The Addendum also confirms that 28 alternative sites elsewhere in the city are now assessed as poorer‑quality agricultural land (YY), but these were not reconsidered. This is a failure to consider reasonable alternatives, contrary to SEA/SA legal requirements.
The Council acknowledges that the updated ALC data changes the Plan’s sustainability score for land and soil from neutral to “minor negative”. This means the Sustainability Appraisal is no longer accurate and has not been updated to reflect the new evidence.
Because the evidence base has materially changed, and the Council has not re‑run the site selection process or reconsider alternatives, the Further Main Modifications are not justified, not positively prepared, and not effective. They are therefore unsound and not legally compliant. |
To make the Further Main Modifications legally compliant and sound, the Council must:
Re‑run the site selection process using the updated DEFRA ALC data (2025), because SES29 and SES30 are now higher‑quality agricultural land (N) and no longer meet the justification used for their allocation.
Reassess all 28 poorer‑quality (YY) sites identified in the Site Selection Addendum as reasonable alternatives, in line with NPPF Footnote 58 and SEA/SA requirements.
Update the Sustainability Appraisal to reflect the new “minor negative” impact on land and soil, and reconsider whether the spatial strategy remains justified.
Reconsider whether SES28, SES29, SES30, SES03, SES08 and SES10 should remain allocated, given the new evidence and the availability of poorer‑quality land elsewhere.
These changes are necessary to ensure the Plan is based on up‑to‑date evidence, considers reasonable alternatives, complies with NPPF Footnote 58, and meets the soundness tests of being justified, positively prepared, and effective. |
| 623 |
5030362 |
07/10/2026 |
Richard Hull |
Online |
|
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
|
|
No |
No |
the area has been a wildlife haven for 35 plus years Having seen Tawny owls bats badgers foxes Deer field mice frogs toads numerous invertebrates including moths and butterflies to lose such a significant haven is obscene when so many other places are suitable . we have noted that the wildlife haven area known as Jaunty park has been changed to "formally school playing fields" which the area hasn't been for over 35 years and has developed into the haven it is now . It also was part of the green corridor which was never to be changed . |
there is not only the wildlife aspect but the strain on the amount of vehicles in an already congested area to factor in . not only this but no provision is made for the amount on Doctor spaces the dental spaces school spaces all of which are full the the brim already also adding the strain on gas electricity and water . |
| 624 |
5044161 |
12/10/2026 |
Martyn Gregory |
Online |
N/A |
N/A |
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
NES37 (IIA/SA) Appendix B and (IIA/SA0 section 5 |
|
No |
No |
IIA/SA Appendix B: The DEFRTA agricultural land data became available AFTER NES37 was selected. The land assessment has been changed from Neutral to Higher Quality agricultural land. This land is still actively farmed. Losing higher quality farm land loses Food Security and potentially push's up costs, especially difficult in when we clearly have a cost of living crisis.
Would NES37 still have been selected if is was originally classified as HIGHER QUALITY when the Green Belt Sites were chosen?
NES37 (IIA/SA) Section 5
The assessed impact on land and soils of the development has changed from Minor Negative-Moderate Negative, clearly worse then SCC had calculated. Indeed the whole Sheffield Plan is deemed to worsen Lands and Soil from Neutral to Minor Negative.
If the new evidence presented in this matter was present when the original green belt sites were identified would the Sheffield City Council reconsidered whether NES37 would still be allocated.
I do not think that Sheffield City Council has demonstrated that NES37 remains a justified and deliverable allocation when evidence (since the original plan has come to light) identifies higher quality agricultural land and greater Land and Soils harm. |
The whole Sheffield Plan needs to be re considered as it is clear there is more damage to agricultural land and Soils than SCC first identified when the plan was presented.
This is critical when the country faces a food security issue and rising food costs which will only increase if we continue to build on agricultural land. More time needs to be spent looking at alternatives and also a fairer distribution of sites in and around Sheffield. The residents of S35 and S36 are taking a disproportionate 'hit' on the allocation of housing on green belt. I was with Councillor Hunt at a meeting and he told me 'if we had more time the plan would look different'. Well you have now had more time and the plan does not look any different. |
| 625 |
5058244 |
15/10/2026 |
Charlotte Nwali |
Online |
Harron Homes |
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
FMM32 |
|
Yes |
No |
Harron Homes supports the principle of FMM32, which recognises the former playing-field use of allocation SES13 and requires equivalent or better replacement sports provision. However, we consider that further clarification is necessary to demonstrate that the modification is effective and justified.
FMM32 requires replacement provision in terms of quantity and quality, in a suitable location, taking account of the Playing Pitch Strategy and priority projects for sporting provision in Sheffield.
Whilst the requirement establishes an appropriate policy objective, the supporting evidence does not clearly establish how replacement provision will be delivered. EXAM 220 identifies the former sporting use of SES13 but does not identify a specific replacement site, funded scheme, delivery partner, programme or mechanism capable of securing the replacement provision.
The distinction between requiring replacement provision and demonstrating that it can realistically be secured is relevant to the effectiveness of the allocation.
The Sheffield Plan examination has previously considered former playing-field sites, including ES25 and SS01/SS04, where evidence concerning alternative sporting facilities and potential improvements was used to demonstrate that housing allocations could be capable of delivery. The approach taken to SES13 should be consistent with the underlying principle that former sporting provision can be replaced through appropriately identified and secured alternative provision.
The policy should also recognise that the sporting function, accessibility and actual community availability of former playing-field land are relevant to assessing replacement requirements, without removing the protection afforded to former playing fields.
As currently drafted, the modification leaves uncertainty about the identification and delivery of replacement provision, potentially affecting the allocation's effectiveness.
Harron Homes therefore considers that FMM32 requires clarification to ensure that the replacement provision requirement is justified, effective and capable of implementation. |
Harron Homes requests that FMM32 be amended to clarify how equivalent or better replacement sporting provision will be identified, delivered and secured.
The following replacement wording is proposed:
"The loss of sports pitch provision resulting from the proposed development should be replaced by equivalent or better provision in terms of quantity and quality, in a suitable location offering comparable or improved accessibility for the community served.
The form and location of replacement provision should be informed by an up-to-date assessment of sporting need, the nature and condition of the existing or former facilities, and the evidence set out in the Playing Pitch Strategy, including identified priority projects.
Replacement provision may be delivered through new facilities or an appropriate package of improvements to existing sporting facilities, where demonstrated to satisfy the applicable national policy requirements.
The replacement provision must be capable of delivery and appropriately secured through planning conditions, obligations or other suitable mechanisms, including provision for long-term management and maintenance."
This amendment would strengthen the effectiveness of the allocation by establishing a clearer framework for identifying and securing replacement sporting provision, while retaining the principle of equivalent or better provision required by national planning policy. |
| 626 |
5058304 |
15/10/2026 |
Charlotte Nwali |
Online |
Harron Homes |
|
Integrated Impact Assessment: Sustainability Appraisal note to respond to Examination queries and Further Main Modifications |
FMM32 and SES13 |
|
Yes |
No |
Concerns regarding whether the conclusions are sufficiently justified
Representation on the Integrated Impact Assessment – Reappraisal of Site SES13
Harron Homes wishes to comment on Section 4 of the September 2026 Integrated Impact Assessment (IA) / Sustainability Appraisal, which reappraises allocation SES13 following the identification of its former use as school playing fields.
The IA concludes that the additional evidence does not alter its overall findings. This conclusion is reached in the context of proposed modification FMM32, which introduces a requirement for equivalent or better replacement sports provision.
Harron Homes supports the principle that former playing-field land may be suitable for residential development where the loss of sporting provision can be appropriately addressed. However, it considers that the assessment does not sufficiently explain how the proposed replacement requirement has informed the conclusion that significant adverse effects are unlikely.
In particular, the existence of a policy requirement for replacement sports provision should be distinguished from evidence demonstrating that such provision is practically achievable.
EXAM 220 establishes the historical sporting use of SES13. However, the published material does not identify a specific replacement site, deliverable scheme, funding arrangement, delivery programme or mechanism for securing equivalent or better sporting provision.
Harron Homes considers that these matters are relevant to whether the proposed mitigation is sufficiently certain to support the IA's conclusions.
The assessment should also distinguish between the historic physical provision of sports pitches and the sporting opportunities currently available to the community. In considering replacement provision, the quantity and quality of the facilities, community accessibility and opportunities for addressing identified sporting needs are relevant considerations.
This issue is particularly important in Sheffield, where the Council's 2022 Open Space Assessment distinguishes between publicly accessible parks and recreation grounds and privately managed outdoor sporting facilities. The latter are classified separately and are not assigned quantitative or accessibility provision standards within that assessment.
The Playing Pitch Strategy provides a separate assessment of sporting capacity and demand. The relationship between these evidence bases should be transparent when determining whether the loss of former playing-field land has been appropriately addressed.
The IA should therefore explain how the replacement provision requirement introduced by FMM32 can be fulfilled and whether the opportunities for suitable and deliverable alternative provision have been assessed.
Without that explanation, there remains uncertainty about the evidential basis for concluding that the modification avoids significant adverse sustainability effects.
Harron Homes considers that further clarification is necessary to demonstrate that the IA provides a sufficiently robust and justified assessment of SES13 and the mitigation relied upon through FMM32. |
Harron Homes requests that Section 4 of the Integrated Impact Assessment / Sustainability Appraisal be supplemented to provide a clearer explanation of the assessment of sporting provision at SES13 and the mitigation relied upon through FMM32.
Specifically, the following changes are requested:
1. Clarification of the baseline assessment
The assessment should explain the basis upon which SES13 is classified as having a surplus of open space for its existing function, including how its former playing-field status, sporting capacity and current community accessibility have been considered.
2. Assessment of replacement provision
The assessment should explain how the requirement for equivalent or better replacement provision is expected to be satisfied, including consideration of identified opportunities within the Playing Pitch Strategy, the availability of suitable alternative locations and the mechanisms through which provision could be secured.
3. Evidence of deliverability
Where the conclusion that significant adverse effects are unlikely relies upon FMM32, the assessment should explain whether there is sufficient evidence to demonstrate that suitable replacement provision is realistically achievable.
4. Consistency of methodology
The assessment should clearly distinguish between the protection afforded to existing and former playing fields and the assessment of open-space supply, sporting capacity and community accessibility.
In particular, regard should be had to the Sheffield Open Space Assessment 2022, which distinguishes publicly accessible parks and recreation grounds from privately managed outdoor sporting facilities, and to the separate Playing Pitch Strategy evidence.
5. Clarification of the Sustainability Appraisal conclusion
Harron Homes requests that paragraphs 4.2–4.4 of the September 2026 assessment be supplemented to explain how the proposed mitigation has been taken into account and why the conclusion of no significant adverse effects remains justified.
These changes would provide greater transparency regarding the evidence and assumptions underpinning the assessment and help demonstrate that the proposed modification is justified, effective and consistent with national planning policy. |
| 627 |
5058351 |
15/10/2026 |
Charlotte Nwali |
Online |
Harron Homes |
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
FMM5 |
|
Yes |
No |
Effectiveness and Consistency with National Policy
Representation on FMM5 – Policy BG1: Sheffield's Green Network
Harron Homes supports the protection and enhancement of Sheffield's Green Network and recognises the importance of ecological connectivity, biodiversity recovery and the delivery of multifunctional green infrastructure.
However, Harron Homes objects to FMM5 as presently drafted on the grounds that the proposed changes require further clarification to ensure that Policy BG1 is effective, justified and consistent with national planning policy.
FMM5 introduces additional references to the South Yorkshire Local Nature Recovery Strategy (LNRS), including green spaces that have the potential to form wildlife corridors or stepping stones and mapped Measures and Areas that Could Become of Particular Importance for Biodiversity.
The modification also retains the requirement to give very significant weight to the protection and enhancement of Sheffield's Green Network.
The concern relates to how this weighting will be applied to land identified as having the potential to contribute towards future ecological connectivity, as distinct from land already subject to statutory or non-statutory ecological designation.
Areas identified within the LNRS as potential opportunities for biodiversity improvement are not necessarily equivalent in ecological value, condition or sensitivity to existing designated wildlife sites. Their identification may reflect opportunities for future habitat creation or enhancement rather than the presence of existing ecological assets requiring protection.
The modified policy does not sufficiently explain how decision-makers should distinguish between these different circumstances when determining the weight to be afforded to development proposals.
There is consequently a risk that the identification of land as a potential nature recovery opportunity could be interpreted as attracting a level of protection disproportionate to its established ecological value.
Harron Homes considers that the weight attached to such land should be informed by site-specific ecological evidence, including the nature and condition of existing habitats, their connectivity, strategic importance and realistic potential for enhancement.
The policy should also recognise that sustainable residential development can positively contribute towards the objectives of the LNRS through biodiversity net gain, habitat creation, green infrastructure, ecological corridors and secured long-term management.
The additional wording should therefore provide sufficient flexibility to allow development proposals to demonstrate how identified ecological objectives can be achieved or enhanced through appropriate design and mitigation.
Without further clarification, the modified policy risks uncertainty and inconsistent interpretation, particularly where proposed development affects land mapped as a future ecological opportunity rather than an existing designated ecological asset.
Harron Homes considers that FMM5 should be amended to ensure a proportionate and evidence-led approach which maintains appropriate ecological protection while supporting sustainable development. |
Harron Homes requests that FMM5 be amended to clarify the relationship between the protection of existing ecological assets and areas identified as potential opportunities for future nature recovery.
Proposed additional wording to Policy BG1:
"In applying this policy, the weight afforded to land identified within the Local Nature Recovery Strategy shall be proportionate to its established ecological value, condition, strategic importance and evidenced contribution to habitat connectivity.
The identification of land as an Area that Could Become of Particular Importance for Biodiversity shall not, in itself, be treated as equivalent to a statutory or non-statutory ecological designation.
Development proposals affecting such areas will be assessed having regard to site-specific ecological evidence and the extent to which identified nature recovery objectives can be maintained or delivered through appropriate design, mitigation, habitat enhancement, biodiversity net gain and long-term management.
Where appropriate, development that demonstrably contributes towards the objectives of the Local Nature Recovery Strategy may be supported, subject to compliance with other relevant development plan policies."
Further clarification requested
Harron Homes also requests that Policy BG1 confirms that:
Existing designated ecological assets and areas identified for potential future habitat enhancement will be assessed according to their respective ecological importance and applicable policy protections.
The presence of land within a mapped nature recovery opportunity area does not automatically preclude otherwise acceptable sustainable development.
Opportunities to secure ecological connectivity through development proposals should be considered positively, including through on-site green infrastructure and habitat creation.
The policy will be applied consistently with the statutory biodiversity net gain framework and the mitigation hierarchy.
These amendments would improve certainty and consistency in decision-making whilst retaining the policy's objectives of protecting and enhancing Sheffield's Green Network. |
| 628 |
5058438 |
15/10/2026 |
Charlotte Nwali |
Online |
Harron Homes |
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
FMM5 |
|
Yes |
No |
Effectiveness and clarity of policy application
Representation on FMM5 – Policy BG1: Application to Urban Green Space Zones and Former Sporting Land
Harron Homes wishes to make an additional representation concerning the effectiveness of proposed modification FMM5, specifically the relationship between Policy BG1, Urban Green Space Zones and former sporting land.
Harron Homes has a direct interest in this matter through its land at the former Handsworth WMC Sports Ground, Medlock Close, Sheffield, which is subject to residential planning application 26/01232/FUL.
The emerging Sheffield Plan proposes removing the land from the Green Belt and designating it as Urban Green Space.
FMM5 amends Policy BG1 by clarifying the relationship between Sheffield's Green Network and other development management policies, expressly including Policies GS1, GS1A and GS2, which address green-space and Green Belt matters.
Harron Homes considers that the proposed cross-references require further clarification to ensure that the modified policy can be applied effectively and consistently to land transitioning from Green Belt to Urban Green Space.
The Medlock Close site illustrates the importance of distinguishing between the historical designation of land for recreational purposes and its current functional contribution to accessible open-space provision.
The application site is privately owned and has not been accessible for public sporting use since 2015. Although the site retains its status as a former playing field, that protection should not be conflated with a presumption that the land currently provides publicly accessible sporting facilities.
The Sheffield Open Space Assessment 2022 recognises this distinction. It records privately managed outdoor sporting facilities separately from publicly accessible parks and recreation grounds and does not apply quantitative or accessibility provision standards to the former category.
FMM5 should therefore clarify how Policy BG1 is to be applied where land within an Urban Green Space Zone does not currently contribute to publicly accessible recreational provision.
It should also distinguish the protection of ecological connectivity and green infrastructure from the separate assessment of former playing-field land under relevant national and local sporting policies.
The modification should not be interpreted as automatically precluding development where a proposal can demonstrate appropriate treatment of ecological and recreational impacts, including equivalent or better replacement sporting provision in accordance with national policy.
Without clarification, there is potential for uncertainty and duplication in the application of Policies BG1, GS1 and GS1A, particularly where privately controlled former sporting land is involved.
Harron Homes therefore considers that further clarification is necessary to ensure that the modified policy is effective, appropriately justified and consistent with national planning policy. |
Harron Homes requests that FMM5 be amended to provide greater clarity concerning the application of Policy BG1 to land designated as Urban Green Space, particularly where it comprises privately controlled or disused former sporting facilities.
The following additional wording is proposed:
"Where land is designated as Urban Green Space, the application of Policy BG1 shall have regard to the actual ecological, recreational and green infrastructure functions of the site, informed by relevant site-specific evidence.
The designation of land as Urban Green Space shall not, in itself, be regarded as evidence that the land is currently publicly accessible or available for sporting or recreational purposes.
Where development proposals affect former sporting land, consideration shall be given to the relevant national and local policies concerning open-space protection and replacement provision, including the potential for equivalent or better alternative provision in an appropriate location.
The requirements of Policy BG1 shall be applied proportionately, having regard to the particular characteristics of the site and its contribution to the Green Network, and in a manner consistent with Policies GS1 and GS1A."
These changes would improve the effectiveness of the cross-policy references introduced by FMM5 and provide greater certainty in determining development proposals affecting former sporting land within Urban Green Space Zones.
The proposed clarification would retain appropriate protection for green infrastructure and sporting land whilst ensuring that decisions are informed by the actual functions, accessibility and characteristics of individual sites. |
| 629 |
5058478 |
15/10/2026 |
Charlotte Nwali |
Online |
Harron Homes |
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
FMM16 |
|
Yes |
No |
Concerns regarding effectiveness and clarity
Representation on FMM16 – Policy GS5: Priority Habitats and Species
Harron Homes supports the protection and enhancement of biodiversity, including priority habitats and species, and recognises the importance of applying the mitigation hierarchy and delivering measurable biodiversity improvements through development.
However, Harron Homes considers that FMM16 requires further clarification to ensure that Policy GS5 is effective and consistent with national planning policy.
FMM16 introduces wording which provides for significant or very significant weight to be afforded to priority habitats and species outside internationally and nationally designated sites, proportionate to their ecological value and informed by site-specific evidence.
Whilst the reference to ecological value and site-specific evidence is welcomed, the distinction between significant and very significant weight is not sufficiently defined.
Priority habitats and species vary considerably in their ecological importance, conservation status, condition, extent and sensitivity to development. Their presence should therefore be assessed in the context of the particular site and the likely effects of the development proposal.
The modified policy does not explain the circumstances in which significant weight, as opposed to very significant weight, should apply, potentially leading to inconsistent interpretation by decision-makers.
Furthermore, the policy should clearly distinguish the protection afforded to irreplaceable habitats, statutory designated sites and other habitats or species of conservation importance.
The presence of a priority habitat or species should not automatically result in a presumption against otherwise acceptable development where impacts can be avoided, mitigated or, where appropriate under national policy, compensated for.
Residential development can contribute positively to biodiversity objectives through the retention and enhancement of existing habitats, creation of new habitats, biodiversity net gain and secured long-term ecological management.
The policy should therefore recognise the potential for appropriately designed development to deliver positive ecological outcomes, whilst maintaining the protection necessary for habitats and species of particular conservation importance.
Without further clarification, FMM16 risks introducing uncertainty concerning the level of weight to be afforded to ecological considerations and the circumstances in which development proposals may demonstrate compliance.
Harron Homes considers that additional guidance within the policy wording is necessary to ensure a proportionate, evidence-led and consistent approach to decision-making. |
Harron Homes requests that FMM16 be amended to clarify how the weight afforded to priority habitats and species will be determined and applied in the assessment of development proposals.
Proposed replacement wording:
"Outside internationally and nationally designated sites, priority habitats and species will be afforded weight proportionate to their ecological significance, conservation status, condition, sensitivity and the likely effects of the proposed development, as demonstrated through appropriate site-specific ecological evidence.
In determining the weight to be afforded, regard will be had to the extent to which impacts can be avoided, mitigated or, where permissible under national planning policy, compensated for through appropriate measures.
Development proposals that retain, enhance or create habitats, strengthen ecological connectivity and deliver biodiversity net gain will be assessed having regard to their contribution towards the objectives of this policy.
The level of protection afforded to irreplaceable habitats and statutory designated sites will remain subject to the relevant national policy and statutory requirements."
Further clarification requested
Harron Homes requests that the modified policy clearly establishes:
The circumstances in which significant or very significant weight will apply, having regard to demonstrated ecological value rather than the presence of a priority habitat or species alone.
The distinction between statutory designated sites, irreplaceable habitats and other priority habitats and species.
The role of the mitigation hierarchy, appropriate compensation and statutory biodiversity net gain requirements in determining the acceptability of development proposals.
The potential for development to deliver positive ecological outcomes through habitat retention, enhancement, creation and secured long-term management.
These amendments would improve the effectiveness and clarity of Policy GS5, whilst ensuring that ecological considerations are afforded appropriate weight and that development proposals are assessed consistently with national planning policy. |
| 630 |
5058510 |
15/10/2026 |
Charlotte Nwali |
Online |
Harron Homes |
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
FMM33 |
|
Yes |
No |
Concerns regarding effectiveness and consistency of monitoring assumptions
Representation on FMM33 – Affordable Housing Monitoring Framework
Harron Homes wishes to comment on FMM33, which amends the Sheffield Plan's affordable housing monitoring target following the updated affordable housing supply calculations set out in Examination Document EXAM 187A.
FMM33 proposes to reduce the total number of affordable homes anticipated over the Plan period from 5,531 to 5,479 dwellings, reflecting revised assumptions for allocations SES30, NES37, NES39 and SWS19.
Harron Homes acknowledges the importance of ensuring that the Plan's monitoring framework reflects the most up-to-date evidence and realistic assumptions regarding housing delivery.
However, the proposed modification contains an apparent inconsistency between the annualised affordable housing delivery target and the supporting examination evidence.
EXAM 187A identifies an updated affordable housing supply of 5,254 dwellings without the additional policy uplift, equivalent to 309 dwellings per annum, and 5,479 dwellings including the uplift, equivalent to 322 dwellings per annum.
In contrast, FMM33 specifies a revised monitoring target of 5,479 affordable dwellings, equivalent to 320 dwellings per annum.
The difference may reflect rounding or an alternative annualisation methodology; however, the basis for the calculation should be clearly explained to ensure consistency between the monitoring framework and the examination evidence.
The updated evidence also reduces the total affordable housing projection by 52 dwellings. Whilst this represents a relatively modest change to overall supply, it demonstrates the sensitivity of housing delivery forecasts to assumptions regarding site capacity and affordable housing percentages.
This is particularly relevant where the forecasts include additional affordable housing provision arising from policy uplift on strategic allocations, which may be affected by development viability, infrastructure requirements, site-specific constraints and delivery programmes.
Harron Homes considers that the monitoring framework should clearly distinguish between baseline affordable housing provision and additional provision dependent upon policy uplift, enabling the Council to identify whether delivery is proceeding in accordance with the assumptions underpinning the Plan.
Without further clarification, there is a risk that the monitoring framework will lack sufficient transparency and precision to measure affordable housing delivery effectively.
Harron Homes therefore considers that FMM33 requires clarification to ensure that the monitoring arrangements are justified and effective. |
Harron Homes requests that FMM33 be amended to reconcile the affordable housing delivery monitoring target with the updated supporting evidence in EXAM 187A.
Proposed revised wording:
"Deliver 5,479 additional affordable homes across the Plan period (equivalent to approximately 322 affordable homes per annum), subject to the monitoring of actual delivery against the assumptions set out in the Affordable Housing Supply Update (EXAM 187A)."
Alternatively, should the Council consider 320 affordable homes per annum to be the appropriate monitoring target, the basis for this figure should be clearly explained within the monitoring framework.
Harron Homes further requests that the monitoring framework:
Clearly distinguishes between baseline affordable housing supply and additional affordable housing provision assumed through policy uplift.
Monitors actual affordable housing delivery against site-specific assumptions, particularly on strategic allocations where additional affordable housing contributions are anticipated.
Identifies material deviations from the delivery assumptions underpinning the Plan, including where site viability, infrastructure requirements or development constraints affect anticipated affordable housing provision.
Provides a transparent basis for considering whether any subsequent review of delivery assumptions or policy implementation is necessary.
These amendments would ensure that the monitoring framework accurately reflects the supporting examination evidence and provides an effective basis for assessing affordable housing delivery throughout the Plan period. |
| 631 |
5058542 |
15/10/2026 |
Charlotte Nwali |
Online |
Harron Homes |
|
Integrated Impact Assessment: Sustainability Appraisal note to respond to Examination queries and Further Main Modifications |
|
|
Yes |
No |
Concerns regarding whether the updated assessment sufficiently justifies its conclusions
Representation on the Integrated Impact Assessment – Updated Agricultural Land Classification Evidence
Harron Homes wishes to comment on Section 5 of the September 2026 Integrated Impact Assessment (IA) / Sustainability Appraisal, concerning updated agricultural land classification evidence and its implications for the Sheffield Plan.
Harron Homes acknowledges the importance of assessing the potential loss of Best and Most Versatile (BMV) agricultural land as part of the development of a justified and sustainable spatial strategy.
The updated Defra Predictive Agricultural Land Classification evidence, considered through EXAM 219 and the September 2026 IA, indicates that a greater proportion of the land proposed for allocation may comprise BMV agricultural land than previously understood.
The IA consequently revises the overall assessment of the Plan's effects on land and soils from neutral to minor negative.
However, despite identifying a potentially greater impact on higher-quality agricultural land, the assessment concludes that the additional evidence does not materially alter the relative performance of reasonable alternatives or the justification for the preferred spatial strategy and proposed allocations.
Harron Homes considers that the relationship between the revised evidence and these conclusions requires further explanation to demonstrate that the assessment is sufficiently robust and justified.
In particular, the updated evidence is relevant to the comparative merits of alternative development locations, including urban sites, previously developed land and proposed Green Belt releases.
Where the updated classification evidence identifies a greater potential loss of BMV agricultural land, the assessment should clearly demonstrate how this has influenced the comparison between the preferred allocations and reasonable alternatives.
The Council's conclusion that other planning considerations outweigh the additional agricultural land impacts may be justified. However, the appraisal should provide a sufficiently transparent explanation of the factors informing that conclusion, including accessibility, infrastructure requirements, deliverability, environmental constraints, housing delivery and the availability of alternative sites.
The assessment should also explain how the updated evidence affects the cumulative loss of agricultural land associated with the modified development strategy.
This is particularly relevant where the Council relies upon strategic Green Belt allocations to deliver substantial quantities of housing and affordable housing during the Plan period.
Harron Homes does not suggest that all development affecting BMV agricultural land should be prevented. Agricultural land quality is one of several considerations in determining sustainable development locations, and an appropriate balance must be struck between environmental protection, housing delivery and other planning objectives.
However, changes to the underlying evidence should be accompanied by a transparent explanation of how they have been incorporated into the Sustainability Appraisal and site-selection process.
Without further clarification, Harron Homes considers that the IA does not sufficiently demonstrate why the revised agricultural land evidence leaves the preferred spatial strategy and selection of reasonable alternatives unchanged.
Further explanation is therefore necessary to demonstrate that the assessment provides an adequately justified basis for the modified Plan. |
Harron Homes requests that Section 5 of the September 2026 Integrated Impact Assessment / Sustainability Appraisal be supplemented to provide greater clarity concerning the treatment of updated agricultural land classification evidence and its implications for the preferred spatial strategy.
The following changes are requested:
1. Updated assessment of reasonable alternatives
The Council should provide a clear explanation of how the revised agricultural land classification evidence has informed the comparative assessment of reasonable development alternatives, particularly where proposed Green Belt allocations contain land now predicted to be Grade 2 or Grade 3a.
2. Transparency of site-selection conclusions
Where alternative locations would result in a lower predicted loss of Best and Most Versatile agricultural land, the assessment should explain why the preferred allocations remain justified, having regard to other relevant sustainability considerations.
3. Cumulative agricultural land impacts
The assessment should more clearly distinguish the cumulative effects arising specifically from the loss of agricultural land from the wider positive effects associated with urban regeneration, efficient land use and material efficiency.
This would improve transparency concerning the extent to which potentially significant agricultural land impacts are moderated by other sustainability objectives within the overall appraisal.
4. Clarification of the implications for strategic growth locations
The assessment should explain how changes to the significance of effects at individual strategic locations have been considered when determining whether the preferred spatial strategy remains the most appropriate approach.
5. Clear explanation of remaining uncertainty
As the updated evidence is predictive, the assessment should identify any material limitations in the available agricultural land data and explain how those uncertainties have been reflected in the assessment conclusions.
Harron Homes requests that the Council publish a short supplementary explanation or revised assessment schedule addressing these matters, sufficient to demonstrate that the updated evidence has been appropriately considered and that the preferred strategy remains justified.
These changes would improve the transparency, justification and effectiveness of the Sustainability Appraisal without requiring the automatic exclusion of otherwise sustainable development sites containing higher-quality agricultural land. |
| 632 |
5058567 |
15/10/2026 |
Charlotte Nwali |
Online |
Harron Homes |
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
FMM2 |
|
Yes |
Yes |
Support subject to clarification
Representation on FMM2 – Policy SA4: Sheffield Innovation Corridor Road
Harron Homes supports the principle of FMM2, which proposes deleting Policy SA4(j) and removing safeguarding for the potential Sheffield Innovation Corridor Road linking Meadowhall Road and Europa Link.
The proposed modification responds to changed circumstances concerning the delivery and funding of the road scheme.
Examination Document EXAM 216 confirms that the Sheffield Innovation Corridor Road has been withdrawn from the Government's Major Road Network / Large Local Majors programme because the local funding contribution and potential future cost increases could no longer be afforded.
Harron Homes considers it appropriate that the development plan does not continue to safeguard land indefinitely for a strategic infrastructure scheme which is no longer funded or committed.
Removing the safeguarding requirement provides greater certainty concerning the future use of affected land and avoids unnecessarily constraining potential development opportunities.
However, Harron Homes considers it important that the removal of this proposed strategic highway scheme is fully reflected in the infrastructure and transport assumptions underpinning the Sheffield Plan.
Where the Council's previous assessment of development capacity, accessibility, highway impacts or infrastructure delivery relied upon the Sheffield Innovation Corridor Road, the relevant evidence should be reviewed to establish whether alternative mitigation or infrastructure arrangements are required.
In particular, it should be clear that proposed housing and employment allocations remain deliverable without reliance upon the withdrawn scheme.
Any alternative transport mitigation requirements should be identified transparently and supported by appropriate evidence concerning their necessity, proportionality, deliverability and funding.
Harron Homes therefore supports FMM2, subject to clarification that the removal of the safeguarding requirement has been appropriately reflected in the Plan's associated infrastructure and transport delivery assumptions. |
Harron Homes supports the proposed deletion of Policy SA4(j) and does not seek reinstatement of safeguarding for the Sheffield Innovation Corridor Road.
However, to ensure the continued effectiveness of the modified Plan, Harron Homes requests that the Council confirms:
Whether any proposed housing or employment allocations relied upon delivery of the Sheffield Innovation Corridor Road in the transport evidence, infrastructure planning or assumptions supporting the spatial strategy.
Whether removal of the road scheme has any consequential implications for the Infrastructure Delivery Plan, transport mitigation requirements or the timing and delivery of proposed allocations.
Whether alternative highway or sustainable transport measures are required to address any impacts previously expected to be mitigated by the withdrawn scheme.
That any alternative infrastructure requirements arising from the modification will be appropriately evidenced and will not impose disproportionate or unjustified obligations upon individual developments.
Where consequential changes are required, Harron Homes requests that the relevant infrastructure and delivery evidence be updated or supplemented to ensure consistency with FMM2.
These clarifications would improve the transparency and effectiveness of the modified Plan while retaining the appropriate removal of safeguarding for an unfunded infrastructure scheme. |
| 633 |
5058630 |
15/10/2026 |
Charlotte Nwali |
Online |
Harron Homes |
|
Integrated Impact Assessment: Sustainability Appraisal note to respond to Examination queries and Further Main Modifications |
|
|
Yes |
No |
concerns regarding justification and effectiveness
Representation on the Integrated Impact Assessment – Additional Urban Housing Sites and Reasonable Alternatives
Harron Homes wishes to comment on Section 3 of the September 2026 Integrated Impact Assessment (IA) / Sustainability Appraisal, which considers six additional urban housing sites promoted during the Sheffield Plan examination.
Harron Homes acknowledges the Council's decision to undertake further Sustainability Appraisal and site assessment work following the Inspectors' request. This additional assessment is welcomed as an important component of a transparent and robust evidence base.
However, Harron Homes considers that the conclusions arising from this assessment require further explanation to demonstrate that the treatment of additional urban housing opportunities is justified and effective.
Examination Document EXAM 130C identifies six urban sites promoted for residential development during the May 2025 consultation. The Council has undertaken site appraisals using its established assessment methodology, incorporating updated information concerning public transport accessibility, agricultural land classification, flood risk and ecological considerations.
Notwithstanding these assessments, the Council confirms that none of the six sites is recommended for allocation and that any residential development coming forward would instead contribute towards the windfall housing supply assumed within the Plan.
Harron Homes recognises that not every potentially suitable site requires a formal allocation. It also acknowledges that certain sites may be subject to constraints which reasonably prevent their allocation.
However, the distinction between a site being potentially suitable for housing and a site being included within the Plan's housing supply assumptions requires careful consideration.
The Council should explain how the additional appraisals have informed its conclusions regarding the availability, suitability and deliverability of urban housing opportunities, particularly where sites may be capable of contributing towards identified housing needs during the Plan period.
The assessment should also clarify the relationship between these identified opportunities and the windfall allowance, including the extent to which the assumed windfall delivery is supported by evidence.
This is relevant to the Plan's overall housing delivery strategy, which includes reliance upon strategic Green Belt allocations that may be subject to infrastructure requirements, environmental constraints and longer development lead-in periods.
The September 2026 IA also identifies potentially greater impacts upon Best and Most Versatile agricultural land arising from certain proposed Green Belt allocations.
Against that background, it is important that the Council demonstrates how opportunities for additional urban housing delivery have been appropriately considered alongside the preferred spatial strategy.
Harron Homes does not suggest that all six promoted urban sites should automatically be allocated. Rather, the assessment should provide a transparent explanation of why the sites are appropriately treated as potential windfall opportunities rather than identified allocations, having regard to their individual constraints and the wider housing delivery strategy.
Without further clarification, Harron Homes considers that the assessment does not sufficiently demonstrate how the additional urban site appraisals have informed the justification of the preferred strategy and its reasonable alternatives.
Further explanation would improve the transparency and robustness of the Sustainability Appraisal and assist in demonstrating that the modified Plan is justified and effective. |
Harron Homes requests that Section 3 of the September 2026 Integrated Impact Assessment / Sustainability Appraisal be supplemented to explain more clearly how the assessment of the six additional urban housing sites has informed the conclusions regarding reasonable alternatives and the preferred spatial strategy.
The following changes are requested:
1. Clear explanation of site-selection conclusions
The assessment should provide a concise site-by-site explanation of why each additional urban housing site has not been recommended for allocation, distinguishing between planning constraints, deliverability considerations, site availability and the Council's approach to the timing of site promotion.
2. Relationship with windfall supply
The Council should clarify how the potential residential delivery associated with the additional urban sites relates to the windfall allowance assumed within the Plan's housing supply.
In particular, the evidence should demonstrate that the assumed windfall contribution is supported by appropriate delivery evidence and does not depend upon an unjustified assumption that all potentially suitable sites will necessarily come forward.
3. Comparative assessment of reasonable alternatives
The assessment should explain whether the additional urban sites could materially influence the comparative sustainability performance of the preferred development strategy, particularly in relation to previously developed land, accessibility, housing delivery and agricultural land impacts.
4. Housing delivery and developability
Where additional urban sites are considered potentially suitable for housing, the Council should explain how opportunities for their delivery have been reflected in the wider assessment of housing supply and the effectiveness of the Plan.
5. Transparency of conclusions
The Sustainability Appraisal should clearly explain why the additional site assessments do not alter the overall conclusions concerning the preferred spatial strategy, having regard to the individual merits and constraints of the sites and the cumulative effects of proposed development.
These clarifications would improve the justification and transparency of the Sustainability Appraisal without requiring the automatic allocation of all additional urban sites. |
| 634 |
5058657 |
15/10/2026 |
Charlotte Nwali |
Online |
Harron Homes |
|
Consequential Changes to the Policies Map as a result of Proposed Further Main Modifications |
MM410 – Map Change 4 (SES29) |
|
Yes |
No |
subject to confirmation of the corrected boundary's implications
Representation on Map Change 4 – Allocation SES29, Orgreave Lane (MM410)
Harron Homes wishes to comment on Map Change 4 within the Consequential Changes to the Policies Map document, which corrects the boundary of proposed allocation SES29 following MM410.
Harron Homes acknowledges the need to ensure that the Policies Map accurately reflects the relevant site allocation and its associated policy requirements.
The corrected mapping is welcomed in principle, provided that the revised boundary is consistent with the land area, development assumptions and site-specific requirements underpinning allocation SES29.
Harron Homes considers that the implications of the boundary correction should be clearly explained to ensure that the allocation can be implemented effectively.
In particular, the Council should confirm whether the corrected boundary affects the gross or net developable area, the anticipated development capacity, the location of potential highway access arrangements or the provision of green infrastructure and other supporting infrastructure.
Examination Document EXAM 221 identifies proposed access arrangements from Orgreave Lane and confirms that these have been considered acceptable in principle by Sheffield City Council Highways, subject to further detailed design, modelling and road safety auditing.
It is therefore important that the corrected allocation boundary remains consistent with the proposed access arrangements and does not introduce any previously unassessed land requirements or constraints.
Harron Homes also notes the importance of identifying the infrastructure required to support major residential allocations, including provision for open space, recreation and sporting facilities, where justified by the development proposals and relevant evidence.
However, Harron Homes recognises that Map Change 4 concerns a specific boundary correction rather than a wider reconsideration of allocation SES29.
Accordingly, the representation seeks clarification of the spatial implications of the corrected boundary and confirmation that it remains consistent with the evidence supporting the allocation.
This would provide certainty for landowners, developers and decision-makers and assist in ensuring that the Policies Map is effective. |
Harron Homes requests that the Council confirm that Map Change 4 accurately reflects the boundary intended by MM410 and provide a concise explanation of its implications for allocation SES29.
In particular, the Council is requested to clarify:
Whether the corrected boundary alters the gross or net developable site area.
Whether the correction has any implications for the anticipated housing and employment capacity of the allocation.
Whether the corrected boundary is consistent with the indicative access arrangements presented in EXAM 221.
Whether any consequential amendments to the relevant site allocation schedule, infrastructure assumptions or supporting evidence are required.
Whether the correction affects any land identified for green infrastructure, public open space or other supporting facilities within the allocation.
Where the correction has no implications for development capacity, access or infrastructure provision, Harron Homes requests that this be expressly confirmed in the accompanying explanatory material.
Where consequential changes are necessary, the relevant Policies Map and supporting allocation information should be updated to ensure consistency and effective implementation. |
| 635 |
5058671 |
15/10/2026 |
Charlotte Nwali |
Online |
Harron Homes |
|
Integrated Impact Assessment: Sustainability Appraisal note to respond to Examination queries and Further Main Modifications |
|
|
Yes |
No |
concerns regarding effectiveness and the assessment of cumulative impacts
Representation on the Integrated Impact Assessment – Cumulative Sporting Demand and Deliverability of Mitigation
Harron Homes wishes to comment on the September 2026 Integrated Impact Assessment (IA) / Sustainability Appraisal, particularly the assessment of recreational and sporting provision in connection with proposed housing growth and the additional mitigation introduced through FMM32.
Harron Homes supports the delivery of sustainable housing growth in Sheffield, accompanied by appropriate investment in open space, sporting infrastructure and recreational facilities.
However, it considers that further clarification is necessary concerning the cumulative assessment of sporting demand and the assumptions underpinning the availability and deliverability of mitigation.
Section 4 of the September 2026 IA considers allocation SES13, following new evidence confirming its former playing-field use.
The assessment concludes that the allocation is unlikely to result in significant adverse effects, relying partly upon the requirement introduced through FMM32 for equivalent or better replacement sporting provision.
Whilst Harron Homes supports the principle of appropriately secured replacement provision, the assessment does not clearly explain whether the mitigation assumed for SES13 has been considered alongside the wider demand for sporting facilities arising from proposed residential development.
Of particular relevance are strategic allocations SES29 and SES30, which together are expected to accommodate approximately 1,700 dwellings.
These allocations will generate additional demand for recreational and sporting facilities. The Council's assessment should therefore provide clarity regarding how that demand will be accommodated and whether the proposed infrastructure arrangements are supported by deliverable mechanisms.
Harron Homes has a specific interest in this matter through its land at the former Handsworth WMC Sports Ground, Medlock Close, which is subject to planning application 26/01232/FUL.
The site is privately owned and has reportedly been unavailable for public sporting use since 2015.
The Sheffield Playing Pitch Strategy 2022 identifies the site as a potential opportunity to bring former football pitches back into use. However, a recommendation to engage with a private landowner is not, in itself, evidence that sporting provision is available or capable of delivery.
Harron Homes is unaware of any secured agreement, funded project, acquisition proposal, community use arrangement or delivery mechanism capable of returning the Medlock Close land to sporting use.
It is therefore important that the Council's assessment of existing and future sporting provision does not rely upon the availability of privately controlled land without evidence that its sporting use can realistically be secured.
Harron Homes acknowledges that the protection of existing and former playing fields is a separate consideration from the calculation of existing accessible sporting provision.
Nevertheless, where development proposals or strategic allocations rely upon the continued availability, reinstatement or improvement of sporting facilities, those assumptions must be supported by appropriate evidence.
The Council's 2022 Open Space Assessment distinguishes between publicly accessible recreation grounds and privately managed outdoor sporting facilities, which are assessed separately and are not subject to the same quantitative provision standards.
This distinction reinforces the importance of establishing whether sporting provision relied upon within the assessment is actually available, accessible and deliverable.
The September 2026 IA should therefore explain how the mitigation assumed through FMM32 relates to the wider sporting infrastructure requirements arising from residential growth and whether any existing or former sporting sites have been assumed to provide capacity without an identified delivery mechanism.
Without further clarification, Harron Homes considers that there remains uncertainty regarding the justification and effectiveness of the assessment's conclusions concerning sporting provision and cumulative recreational demand. |
Harron Homes requests that the September 2026 Integrated Impact Assessment / Sustainability Appraisal be supplemented to clarify the relationship between the replacement sporting provision introduced by FMM32 and the wider sporting demand arising from proposed residential development.
The following clarification is requested:
1. Cumulative sporting demand
Confirm how the sporting and recreational requirements generated by strategic allocations SES29 and SES30 have been assessed, including whether any additional demands materially affect the assumptions underpinning the reappraisal of SES13.
2. Availability of existing sporting provision
Identify whether any assessment of sporting capacity or mitigation associated with these allocations assumes that privately controlled, unused or former sporting land will remain available or return to sporting use.
3. Medlock Close, Handsworth
Confirm whether the former Handsworth WMC Sports Ground has been included within any assumptions concerning the accommodation of future sporting demand arising from SES29 or SES30.
If such reliance exists, identify the evidence demonstrating that the land can be made available, restored and maintained for sporting use, together with the proposed delivery mechanism.
4. Deliverability of mitigation
Explain how any replacement or additional sporting provision relied upon in the assessment will be secured, including consideration of land availability, funding, implementation, community accessibility and long-term management.
5. Consistency of assessment methodology
Clarify how the assessment distinguishes between the policy protection afforded to former playing fields and their actual contribution to existing publicly accessible sporting provision.
6. Sustainability Appraisal conclusions
Where the assessment relies upon replacement sporting provision to conclude that significant adverse effects are unlikely, provide a clear explanation of the evidence supporting the deliverability of that mitigation.
These clarifications would strengthen the transparency and robustness of the Sustainability Appraisal and help demonstrate that the modified Plan's approach to sporting provision is justified and effective. |
| 636 |
5059918 |
16/10/2026 |
Charlotte Nwali |
Online |
Harron Homes |
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
FMM5 – Policy BG1; site S02426 (Medlock Close); relationship with GS1/GS1A |
|
Yes |
No |
Concerns regarding justification and effectiveness
Harron Homes – Supplementary Representation on FMM5 (Policy BG1): Site S02426, Former Handsworth WMC Sports Ground, Medlock Close, Sheffield
Harron Homes objects to FMM5 insofar as it amends Policy BG1's relationship with Urban Green Space Zones and other policies relating to the protection of outdoor recreational facilities, without sufficient clarity regarding the evidence and methodology underpinning their application to existing and former sporting land.
Harron Homes has a direct interest in the former Handsworth WMC Sports Ground, Medlock Close, Sheffield S13 9BA (site reference S02426), which is subject to residential planning application 26/01232/FUL for 56 dwellings.
The emerging Sheffield Plan proposes removing the site from the Green Belt whilst designating it as an Urban Green Space Zone. FMM5 introduces amended cross-references to Policies GS1 and GS1A, making the evidential basis and interpretation of these designations particularly relevant to the modified policy's justification and effectiveness.
This representation concerns the application and effectiveness of FMM5. It does not seek to reopen the Green Belt boundary review generally.
1. Green Belt Review and site-specific evidence
The Sheffield Green Belt Review Addendum (December 2022), Appendix 2, page 28, identifies S02426 as an individually assessed parcel with the following scores:
• Purpose 1, checking unrestricted urban sprawl: 2/5.
• Purpose 2, preventing neighbouring towns merging: 1/5.
• Purpose 3, safeguarding countryside from encroachment: 5/5.
• Purpose 5, assisting urban regeneration: 5/5.
• Overall score: 13/20.
• Potential replacement Green Belt boundary score: 2/3.
The assessment identifies a relatively limited contribution to the two Green Belt purposes principally concerned with urban sprawl and settlement separation, although the site scores strongly against the other assessed purposes.
The proposed removal of the land from the Green Belt is therefore distinguishable from the separate decision to designate it as Urban Green Space.
Harron Homes has reviewed the Green Belt Review, its Addendum and the published Policies Map but has not identified a site-specific explanation establishing the particular criteria and evidence underpinning the Urban Green Space designation at Medlock Close.
The Council should explain whether the designation reflects historical sporting use, current recreational provision, anticipated future sporting needs, ecological value, landscape character, green infrastructure connectivity or a combination of these considerations.
Each represents a different planning function, and an effective application of Policy BG1 requires clarity regarding the specific qualities and functions being protected.
2. May 2025 site-selection methodology: S02426
The Council's Selection of Sites for Green Belt Release Topic Paper (May 2025) provides further evidence concerning its treatment of Medlock Close.
Paragraph 3.10(c) establishes that sites were rejected at initial screening where the entire site was identified as open space or outdoor sports use. Footnote 5 identifies the Sheffield Open Space Assessment 2022 as the source of the relevant audit.
Appendix 1 identifies S02426 as unsuitable for housing allocation because of a fundamental constraint.
Appendix 3, page 29 of the Topic Paper's internal pagination, expressly describes the constraint as:
"Currently unused outdoor sports ground (Handsworth Working Men's Club)."
The Council therefore acknowledged that the land was not operational but excluded it from further consideration for residential allocation because of its recorded sporting use.
As a result, S02426 did not progress to the more detailed comparative suitability and planning appraisal stages, which consider sustainability, development potential, Green Belt performance, infrastructure and the feasibility of addressing constraints.
Harron Homes recognises that existing and former playing fields benefit from national planning policy protection and that non-use does not automatically remove those protections.
However, national policy expressly provides circumstances in which development involving the loss of such land may be acceptable, including the provision of equivalent or better replacement sporting facilities.
The published site-selection evidence does not demonstrate whether that potential mitigation route was considered before S02426 was excluded at the initial screening stage.
This raises a legitimate question concerning the proportionality and consistency of the evidence informing the application of the proposed Urban Green Space designation and the amended Policy BG1.
3. Quantitative open-space assessment
The Council's Sport and Leisure consultation response relating to planning application 26/01232/FUL identifies a potential quantitative shortage of approximately 0.1 hectares of formal open space per 1,000 population following the loss of the application site.
However, the underlying calculation and the basis upon which the site has been included in existing formal open-space supply require clarification.
The land has been privately controlled and unavailable for public sporting use since 2015.
The Sheffield Open Space Assessment 2022 distinguishes publicly accessible parks and recreation grounds from privately managed outdoor sporting facilities.
Private outdoor sport is identified as a separate typology, to which the assessment does not apply quantitative or accessibility provision standards.
The East Area Profile identifies 24.15 hectares of private outdoor sporting provision separately from publicly accessible recreation grounds.
The Council should therefore explain whether S02426 has been included as existing formal sporting provision in its quantitative calculation and, if so, how that approach has been reconciled with its published Open Space Assessment.
Harron Homes acknowledges that adopted Core Strategy Policy CS47 includes privately owned sporting land within its definition of formal open space and that the methodology under CS47 differs from that of the 2022 assessment.
Accordingly, private ownership and non-use do not automatically invalidate the Council's calculation or remove the site's policy protection.
Nevertheless, the distinction between the physical existence of former sporting land and its actual availability for community sporting use is material when considering the effectiveness of open-space protection and future provision.
The Council should identify the assessment catchment, population denominator, individual facilities and land areas relied upon in calculating the reported quantitative deficiency.
4. Future sporting requirements arising from SES29 and SES30
A further concern arises from the Council's treatment of future sporting and recreational requirements associated with strategic housing allocations SES29 and SES30.
These allocations are expected to deliver approximately 1,700 dwellings combined and will generate additional demand for sporting and recreational facilities.
The Council's Sport and Leisure consultation comments concerning planning application 26/01232/FUL have expressly referred to this future demand when assessing the continued need for Medlock Close.
However, the site is privately owned and is not controlled by the Council or the promoters of the strategic allocations.
The Sheffield Playing Pitch Strategy 2022 identifies Handsworth WMC Sports Ground as a high-demand site and recommends engagement with the landowner to bring it back into sporting use.
Harron Homes is unaware of any secured landowner agreement, acquisition proposal, funded reinstatement programme, delivery partner or mechanism guaranteeing future public sporting access.
A Playing Pitch Strategy recommendation to engage with a landowner does not, in itself, secure sporting provision.
Accordingly, if the Council's infrastructure assessment assumes that Medlock Close will remain available or be reinstated to accommodate future demand arising from SES29 and SES30, that assumption must be supported by evidence demonstrating how the necessary capacity could realistically be delivered.
Harron Homes does not assert that the Local Plan's infrastructure calculations definitively rely upon the site for mitigation. Rather, the Council's application-specific comments raise sufficient concern to require clarification of whether such reliance exists.
Any sporting infrastructure necessary to support the strategic allocations should be appropriately identified and secured through deliverable allocation requirements, planning obligations or other suitable mechanisms, rather than assumed to arise from privately controlled former sporting land.
5. Consistency with FMM32 and allocation SES13
FMM32 introduces a requirement for equivalent or better replacement sporting provision at allocation SES13, reflecting the site's historical use as school playing fields.
The accompanying September 2026 Sustainability Appraisal concludes that significant adverse effects arising from the loss of former sporting provision are unlikely, partly in reliance upon the replacement provision requirement.
Whilst SES13 and Medlock Close have different planning circumstances, the Council's approach demonstrates that residential development involving former playing-field land may be contemplated where appropriate replacement provision is secured.
Harron Homes therefore questions why the potential for equivalent or better replacement provision was not considered through the detailed housing site-selection process for S02426, or at least explained as part of the justification for its resulting protective designation.
The Council should demonstrate consistency in its treatment of former sporting land and explain the different planning judgements reached, taking account of each site's circumstances and the availability and deliverability of mitigation.
6. Implications for FMM5 and soundness
FMM5 modifies Policy BG1's relationship with Urban Green Space Zones and other policies governing recreational and green infrastructure assets.
In applying that relationship, the Council should distinguish between:
• The policy protection afforded to existing and former playing fields.
• The actual availability and accessibility of sporting facilities.
• The ecological, landscape and green infrastructure functions performed by designated land.
• The potential to secure equivalent or better replacement sporting provision.
• The deliverability of any future recreational capacity relied upon to accommodate strategic housing growth.
An Urban Green Space designation should not, without supporting evidence, be treated as demonstrating that land currently provides accessible sporting capacity or can be relied upon to accommodate future strategic development requirements.
Similarly, the designation of former Green Belt land as Urban Green Space should be supported by a clear explanation of the planning purposes served and the evidence underpinning those functions.
Harron Homes considers that clarification is required to ensure that the amended relationship between Policy BG1 and Policies GS1 and GS1A is justified, effective and capable of consistent application.
Without that clarification, there is a risk that FMM5 will reinforce the protection of land through policy relationships informed by assumptions concerning recreational function, accessibility and future provision which have not been adequately demonstrated or explained.
The representation is therefore made on grounds of justification and effectiveness, having regard to the proposed modifications and their implications for the application of the emerging development plan. |
Harron Homes requests that FMM5 be supplemented to clarify how Policy BG1 should be applied to Urban Green Space Zones, particularly where land is privately controlled, comprises former sporting facilities or has been removed from the Green Belt.
Proposed additional wording to Policy BG1:
"Where development affects land within an Urban Green Space Zone, the application of this policy shall have regard to the specific ecological, recreational, landscape and green infrastructure functions of that land, supported by appropriate site-specific evidence.
Where land comprises existing or former outdoor sporting facilities, the assessment shall distinguish between the protection afforded to those facilities under national and local planning policy and their demonstrated contribution to currently available community sporting provision.
The designation of land as Urban Green Space shall not, in itself, establish that land is publicly accessible or available to accommodate existing or future sporting and recreational demand.
Where equivalent or better replacement sporting provision is proposed, such proposals shall be assessed in accordance with the relevant national planning policy requirements.
Where future sporting or recreational provision is relied upon to accommodate strategic development requirements, the relevant evidence should demonstrate a realistic and deliverable mechanism for securing that provision."
Further clarification and supporting evidence requested
Harron Homes requests that Sheffield City Council:
Identifies the site-specific evidence and assessment methodology used to justify the proposed Urban Green Space designation of S02426 following its removal from the Green Belt.
Explains the principal function and planning purpose of the designation, including whether it reflects historical sporting use, existing or future recreational need, ecological value, landscape character or green infrastructure connectivity.
Explains whether alternative policy designations or residential development accompanied by equivalent or better replacement sporting provision were considered.
Clarifies why the May 2025 Green Belt release site-selection exercise excluded S02426 at Stage 2 on the basis of its currently unused sporting function, without progressing to an appraisal of whether the identified constraint could be addressed through suitable replacement provision.
Provides the underlying quantitative open-space calculation associated with planning application 26/01232/FUL, including the assessment catchment, population denominator, relevant facilities and land areas included.
Clarifies how any inclusion of privately controlled and inaccessible sporting land within formal open-space supply has been reconciled with the Sheffield Open Space Assessment 2022 and adopted Policy CS47.
Confirms whether the infrastructure or sporting mitigation assumptions associated with allocations SES29 and SES30 rely upon the retention or reinstatement of Medlock Close for sporting use.
Where such reliance exists, identifies the arrangements through which land availability, funding, public access, delivery and long-term management would be secured.
Explains how the proposed designation and assessment of S02426 have been reconciled with the Council's treatment of former playing-field land at SES13 through FMM32.
Confirms that the amended relationship between Policy BG1 and Policies GS1 and GS1A will be applied proportionately, having regard to the actual functions and characteristics of designated land and the relevant national planning policy requirements.
These amendments and clarifications would improve the justification, transparency and effectiveness of FMM5 whilst maintaining appropriate protection for genuinely valued sporting facilities, recreational land and green infrastructure. |
| 637 |
5065151 |
18/10/2026 |
Chris Bell |
Online |
Don Valley Railway |
no |
Consequential Changes to the Policies Map as a result of Proposed Further Main Modifications |
no |
|
Yes |
Yes |
I do not wish to question legality of the plan. I wish to suggest a change. |
My name is Chris Bell. I was the former head Campaigner of Don Valley Railway which campaigned to re-open the (now currently unused) freight railway line between Sheffield and Stocksbridge for passenger services.
The local plan has sought reconsultation mainly for the purpose of considering sites on the proposed Green Belt land to be reallocated to housing. However in the extended period for consultation another matter has come to my attention: Namely Site No CW09 North of Derek Dooley Way, S3 8EN.
Don Valley Railway would wish to seek that the above site for housing takes into consideration the rail transport requirements of a potential rail/tram re-opening scheme on the railway line to Stocksbridge which forms the northern boundary to the site.
The most recent publicised proposal for the re-opening of this line is for a tram service to serve a tram stop referred to as Rock Street. It is our understanding that this would be typical of a tram stop similar to ones on the existing Supertram network.
Don Valley Railway is not convinced the current Tram-based proposal represents the best way forward. We believe a train rather than a tram is likely to give greater overall benefits to the Sheffield City Region. We have forwarded a letter to SYMCA and SCC some time ago but have not had a response on this. Our proposal includes a Kelham Island Station adjacent to Site No CW09 on a larger footprint.
Indeed in recent meetings and presentations attended, SYMCA officers are concerned about how increased rail demand in central Sheffield will be met by the currently sub-standard Midland Station and are considering the solution of creating a second city centre rail hub by re-opening Victoria Station.
We believe that a further station serving Kelham and the north end of Sheffield City Centre adjacent to Site No CW09 (close to the proposed Rock Street tramstop) in such plan should be considered.
On the current consultation draft of the Local Plan Site No CW09 is allocated as Housing. Whatever scale of transport development takes place at this site needs to adequately interact with nearby development. Therefore I ask that Site No CW09 is considered as mixed use (Transport Hub requirements) in addition to Housing allocation.
In line with the Government’s aspirations to deliver housing near rail stations we have no problem with the scale of housing development and indeed more people living in close proximity. However we do not want such a development to prevent this location from being adequately served by such a potential rail link.
The following issues should be considered:
• Access for bus/cycle/walking/taxi/cars as necessary for onward journeys of passengers.
• Adequate provision of shops and services commensurate with the level of usage to serve above travellers
• Rail station access for rail service providers as required.
• Any Potential additional development (perhaps office development attracted by the rail hub
Development of the Don Valley Line including aspirational services and services diverted from Midland could free up capacity into Midland Station and would contribute to the delivery of SYMCA’s aspiration for 4 fast electrified trains per hour to Leeds and others.
Our proposal would probably require a 4 station platform at this location. Which ever proposal is considered, be it tram or train, should ensure sufficient land is available to meet appropriate transport requirements.
Regards
Chris Bell |
| 638 |
5065692 |
19/10/2026 |
Rachel Beighton |
Online |
N/A |
N/A |
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
FMM31 - CH04 Hesley Wood |
|
No |
No |
I am submitting this representation as a local resident. FMM31 introduces substantive new information about how CH04 would actually be delivered, and I do not consider the modification is sound as currently drafted.
FMM31 confirms for the first time that highway access from Cowley Hill will be required through the Hesley Wood Local Wildlife Site and Urban Green Space, and that ground remediation and remodelling will extend beyond the Industrial Zone into the Local Wildlife Site, Urban Green Space and Green Belt. Hesley Wood is a heavily wooded former colliery site, and I do not consider the scale of ground disturbance this implies has been properly assessed or explained. Have alternative access routes avoiding the Local Wildlife Site were considered and discounted on a reasoned, evidenced basis before this route was settled on? If so, I request that this assessment be published.
The revised wording itself now refers to keeping "unavoidable harm" to the Local Wildlife Site to a minimum, is an acknowledgement that harm to this designated site is expected. National planning policy gives particular protection to Local Wildlife Sites, ancient woodland and veteran trees, and I do not consider the Council has shown that the relevant policy test for accepting this harm has been satisfied, nor specified what harm is expected, where it will occur, or why the allocation remains appropriate despite it.
I am also concerned that the revised wording requires any unavoidable harm to be "fully compensated for through the provision and safeguarding of replacement habitats of a similar character and quality and be of an equivalent size," but sets out no mechanism for how this will be secured, monitored or enforced, nor who is responsible for confirming compliance before harm occurs. As drafted, I do not consider this an effective policy requirement capable of being relied upon, and I ask the Council to confirm what delivery and monitoring mechanism will ensure this compensation is actually provided, and what would happen if equivalent replacement habitat cannot realistically be found nearby.
Hesley Wood is within a mapped ancient woodland restoration priority area identified in the South Yorkshire Local Habitat Map, prepared by the South Yorkshire Mayoral Combined Authority and its partners. I do not consider this allocation has been reconciled with that separate official designation, and I ask the Council to explain how allocating this land for industrial access and development is consistent with its identification elsewhere as a priority area for ecological restoration.
The accompanying Sustainability Appraisal concludes that this additional detail "does not change the overall characteristics or significance of effects." I do not find this credible given that FMM31 confirms, for the first time, access through a Local Wildlife Site, works outside the designated Industrial Zone, impacts on Green Belt and Urban Green Space, and potentially unavoidable harm to a protected site. I ask the Council to explain, with evidence, how this conclusion was reached.
I also have significant and serious concerns that remain unaddressed by FMM31:
Former mining and land stability: Hesley Wood has a recorded history of coal and ironstone extraction, with documented mine shafts and other former industrial features. I do not consider sufficient site-specific evidence has been provided to show that ground stability and mine-entry risks can be safely managed, particularly given the extensive remodelling now expressly contemplated.
Contamination: Hesley Wood has previously been identified as containing heavy metals and other hazardous substances. I ask what contamination is known to be present, its extent, what remediation would be required, and whether adequate site investigation by a competent person has informed this.
Environmental impact of remediation itself: remediation is not an environmentally neutral process — excavation, vegetation removal and drainage changes all carry their own impacts. I do not consider these have been assessed separately from the condition of the land after remediation, as required by the NPPF.
Human health: I ask whether the potential impact on the health of existing residents, construction workers and future site users — including risks from dust, asbestos, soil, and groundwater/surface water contamination — has been properly assessed using current evidence. If so, I request that this is published
Finally, I am concerned that CH04 is not the only allocation in this consultation where site boundaries or capacities have changed (for example NWS30 and NES38). I do not consider the cumulative effect of these changes on local wildlife corridors, the Local Nature Recovery Network and Green Belt purposes in this part of the city has been assessed together, rather than site by site in isolation. I ask the Council to confirm whether a cumulative assessment has been carried out, and if not, why not.
I therefore ask: has the Council adequately demonstrated that CH04 remains a suitable and justified employment allocation, when FMM31 confirms the need for access through a Local Wildlife Site, works outside the Industrial Zone, unresolved habitat compensation arrangements, an unreconciled conflict with the South Yorkshire Local Habitat Map, known contamination and public health risk, former mining activity, land-stability risk, and the cumulative effect of changes across multiple nearby sites?
I do not consider the Further Main Modification to CH04 to be legally compliant.
The Strategic Environmental Assessment (SEA) Regulations and the Habitats Regulations require that the environmental implications of a plan modification be properly and adequately assessed before that modification is adopted. FMM31 discloses, for the first time, that delivering CH04 will require highway access through the Hesley Wood Local Wildlife Site, ground remediation and remodelling extending into the Local Wildlife Site, Urban Green Space and Green Belt, and that some harm to the Local Wildlife Site may be unavoidable.
Despite this materially new information, the accompanying Sustainability Appraisal concludes that it "does not change the overall characteristics or significance of effects." I do not consider this conclusion has been adequately evidenced, and on that basis I do not consider the assessment underpinning FMM31 meets the standard required by the SEA Regulations to properly assess the environmental effects of the modification before it is relied upon. In particular, the assessment does not appear to have addressed:
the environmental consequences of routing access through a designated Local Wildlife Site, including whether alternative routes were assessed;
the nature, extent and deliverability of the habitat compensation required for any unavoidable harm, including who is responsible for securing and monitoring it;
the site's location within a mapped ancient woodland restoration priority area identified in the South Yorkshire Local Habitat Map, and whether this has been reconciled with the proposed allocation; and
the cumulative environmental effect of CH04 alongside other site allocations in this consultation with changed boundaries or capacities.
Until these matters have been properly assessed and evidenced, I do not consider the Further Main Modification to CH04 can be treated as legally compliant. |
Sheffield residents have already committed significant time and resources to engaging with the Sheffield Plan process, advocating for outcomes that best serve the people, wildlife and environment of this city. I do not consider it fair or reasonable to ask residents to identify remedies for evidential gaps that are the Council's own responsibility to resolve — particularly in relation to a plan that has attracted overwhelming objection from local people.
1. FMM31 should not be finalised until the Council has published evidence showing that access routes to CH04 avoiding the Hesley Wood Local Wildlife Site were properly considered and reasonably discounted.
2. Amend FMM31 (or the supporting policy text) to specify: who is responsible for securing replacement habitat; the timing requirement (eg. compensation habitat must be established before or alongside development, not afterwards) and the monitoring and enforcement mechanism, with a named body responsible for compliance checks.
3. The Council should publish an explanation of how allocating CH04 for industrial access and development is consistent with Hesley Wood's identification as an ancient woodland restoration priority area in the South Yorkshire Local Habitat Map, or amend the allocation/modification to resolve the conflict.
4. To comply with SEA regulations, the Council should commission and publish a supplementary environmental assessment specifically addressing: access through the Local Wildlife Site; the extent of remediation and remodelling outside the Industrial Zone; and the nature of the "unavoidable harm" now acknowledged — rather than relying on the existing Sustainability Appraisal's conclusion that these details "do not change the overall characteristics or significance of effects."
5. The Council should publish a cumulative assessment of the combined effect on local wildlife corridors, the Local Nature Recovery Network and Green Belt purposes of all site allocations in this consultation with amended boundaries or capacities (including CH04, NWS30, NES38), rather than assessing each in isolation.
6. The Council should require and publish site-specific ground investigation evidence (by a competent person) addressing former mining features, land stability, and contamination at Hesley Wood, before FMM31 is finalised.
7. The environmental assessment should be extended to cover the impacts of carrying out remediation (excavation, spoil movement, vegetation loss, drainage changes), not only the condition of the land once remediation is complete.
8. Human health impact assessment - The Council should publish an assessment of potential health impacts on existing residents, construction workers and future site users from disturbance of historically contaminated ground, covering dust, asbestos, soil and water pathways. |
| 639 |
5066310 |
19/10/2026 |
Rachel Beighton |
Online |
N/A |
N/A |
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
FMM31 - CH03 Warren Lane |
|
Yes |
No |
I am submitting this representation as a local resident. Although no Further Main Modification directly amends the CH03 allocation, the updated agricultural land evidence published as part of this consultation is directly relevant to its continued soundness, and I do not consider the Council has adequately addressed the implications of that evidence.
The new DEFRA Predictive Agricultural Land Classification shows CH03 moving from a neutral rating to a predicted higher-quality classification, potentially including Best and Most Versatile land. The Council's own evidence acknowledges this updated mapping is more detailed than what was available when the site was originally selected, yet its conclusion on CH03's suitability has not changed. I do not consider this has been adequately justified. The NPPF is clear that where development of agricultural land is necessary, poorer-quality land should be preferred over higher-quality land, and I do not believe the Council has demonstrated that CH03 would still have been selected for release from the Green Belt had this evidence been available during the original comparative site-selection process.
CH03 is currently active, working farmland. The updated evidence does not appear to have properly assessed the consequence of permanently removing this land from agricultural use, nor has it addressed how this new agricultural harm sits alongside the site's other known constraints — including the Tankersley Railway Tunnel, overhead electricity infrastructure, and proximity to residential properties, all of which reduce the amount of land actually available for development once appropriate buffers and mitigation are applied.
I would also highlight that this allocation should be considered against the wider national context of food security. Government and independent assessments have identified increasing pressure on UK food supply and affordability, driven by climate change, reduced domestic self-sufficiency, and global supply disruption, with some analysis warning of a significant risk to the resilience of the food system in the coming years. Against this backdrop, I consider the permanent loss of newly identified higher-grade agricultural land sits uneasily with the direction of national thinking on food security, and I do not believe the Council's evidence base has considered this allocation in that wider context.
I do not consider the Council has demonstrated how much genuinely usable employment land CH03 could realistically deliver once its physical constraints are accounted for, nor has it shown that the loss of this higher-grade working farmland is justified when the deliverable employment yield may be significantly reduced, food security considerations are increasingly material, and alternative sites may exist.
I therefore ask: has the Council adequately demonstrated that CH03 remains a suitable, justified and deliverable employment allocation, in light of the updated agricultural land evidence, its continued agricultural use, the site's existing physical constraints, and the wider national context of food security? |
Sheffield residents have already committed significant time and resources to engaging with the Sheffield Plan process, advocating for outcomes that best serve the people, wildlife and environment of this city. I do not consider it fair or reasonable to ask residents to identify remedies for evidential gaps that are the Council's own responsibility to resolve — particularly in relation to a plan that has attracted overwhelming objection from local people.
1. The Council should reassess CH03 against the other sites considered in its original comparative site-selection exercise, using the updated DEFRA agricultural land classification, and publish the outcome.
2. The Council should publish an assessment of the consequences of permanently removing CH03 from agricultural use, including the impact on the farming business currently operating the land.
3. Publish a combined assessment of agricultural harm alongside the site's existing constraints.
4. The Council should publish a clear figure for how much usable employment land CH03 can realistically deliver after all known constraints, buffers and mitigation are applied.
5. The Council should explicitly consider the loss of newly identified higher-grade agricultural land at CH03 against current national guidance and evidence on food security and land use, and publish this assessment as part of the evidence base for the allocation. |
| 640 |
5066399 |
19/10/2026 |
Rachel Beighton |
Online |
N/A |
N/A |
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
FMM31 - CH03 Warren Lane |
|
No |
No |
I do not consider the evidence underpinning the continued allocation of CH03 to be legally compliant, specifically in relation to the assessment of reasonable alternatives.
The updated DEFRA Predictive Agricultural Land Classification shows CH03 moving from a neutral agricultural rating to a predicted higher-quality classification, potentially including Best and Most Versatile land. This is a materially different starting point from the evidence available when CH03 was originally selected through the Council's comparative site-selection exercise.
The SEA Regulations require that reasonable alternatives be identified and assessed as part of the environmental assessment supporting a plan or modification. Where the underlying agricultural evidence for a site changes materially, as it has here, I do not consider it legally sufficient for the Council to rely on a comparative assessment carried out using the previous, lower-quality classification. The comparative picture between CH03 and other candidate or lower-grade sites may now be different, and this has not been revisited.
I am not aware of any published evidence confirming whether alternative, lower-grade agricultural sites were available and assessed using the updated classification, or why such sites were not considered as reasonable alternatives to CH03 in light of this new information.
I therefore ask: has the Council complied with its obligation under the SEA Regulations to assess reasonable alternatives to CH03, given that the agricultural land evidence underpinning the original comparative site-selection exercise has materially changed? |
To comply with SEA regulations, the Council should confirm whether alternative, lower-grade agricultural sites were available and assessed as part of the original exercise, and if not, whether any should now be considered in light of the updated evidence. |
| 641 |
5066648 |
19/10/2026 |
Rachel Beighton |
Online |
N/A |
N/A |
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
FMM31 - CH05 Strawberry Fields |
|
No |
No |
I am submitting this representation as a local resident. New evidence published as part of this consultation raises questions about the continued justification for CH05 which I do not believe have been adequately resolved.
The updated DEFRA predictive agricultural assessment reclassifies CH05 from neutral to poorer-quality land. However, the Council's own evidence states this predictive mapping is a strategic planning tool and is not necessarily reliable for assessing an individual parcel of land. This matters significantly as the farmer who actively works this land describes the soil as excellent, and this plot as among the best he farms. Given this direct conflict between a desktop predictive tool and the lived, working experience of the land, I ask whether the Council should commission a site-specific Agricultural Land Classification survey before relying on the predictive classification to support this allocation.
I would also note that, while the site-level assessment for CH05 has become more favourable to development, the Council's own updated evidence shows the Plan's overall Land and Soils assessment worsening from Neutral to Minor Negative. Despite this, the Council's conclusion that its allocations remain appropriate is unchanged. I ask whether this increased understanding of harm across the Plan should prompt greater caution before permanently removing productive farmland such as Strawberry Fields from agricultural use, rather than being treated as a reason to proceed unaltered.
I would also highlight that this allocation should be considered against the wider national context of food security. Government and independent assessments have identified increasing pressure on UK food supply and affordability, driven by climate change, reduced domestic self-sufficiency, and global supply disruption, with some analysis warning of a significant risk to the resilience of the food system in the coming years. Against this backdrop, I consider it important that any reclassification of productive farmland as "poorer quality," on the basis of a tool the Council itself describes as potentially unreliable at the individual site level, is tested rather than simply accepted, particularly where it contradicts the direct, working knowledge of the farmer who manages the land.
CH05 is currently active, productive farmland, and I do not consider the predictive classification says anything about its actual productivity or the impact its loss would have on the farming businesses that depend on it. I ask whether the Council has given proper consideration to this real-world impact, rather than relying on a desktop classification alone.
Finally, I remain concerned that the housing capacity assumed for CH05 (549 homes) has not been adequately tested. The Sheffield Green Belt Alliance's Site Capacities Investigation, considering constraints including drainage, internal roads, landscape and ecological mitigation, estimated a substantially lower realistic capacity. Although this is not new evidence, the Council has now published an updated Integrated Impact Assessment/Sustainability Appraisal as part of this consultation, and I ask whether that update adequately engages with the previously submitted capacity concerns.
I do not consider the evidence underpinning the continued allocation of CH05 to be legally compliant. The SEA Regulations require the environmental assessment supporting a plan to be adequate and sufficiently robust for the decision it is being used to justify. Here, the Council's updated evidence reclassifies CH05 using a predictive tool that the Council's own documentation describes as a strategic planning instrument, not necessarily suitable for determining the agricultural quality of an individual parcel — and this reclassification directly conflicts with first-hand evidence from the farmer who works the land. I do not consider an assessment that relies on a self-acknowledged limitation of this kind, without resolving the direct conflict with contrary first-hand evidence, meets the standard of adequacy the SEA Regulations require, particularly for a decision resulting in the permanent loss of productive farmland. This is even more concerning at a time of increasing issues with national food security.
I therefore ask: has the Council adequately demonstrated that CH05 remains a justified and deliverable allocation, given the unresolved uncertainty over the land's true agricultural quality, the wider national context of food security, the previously raised questions about its realistic housing capacity, and whether the evidence underpinning the reclassification meets the legal standard required? |
1. The Council should commission a site-specific Agricultural Land Classification survey of CH05 before relying on the predictive reclassification to support the allocation.
2. The Council should explain, with evidence, why the Plan-wide downgrading of the Land and Soils assessment (Neutral to Minor Negative) does not change its conclusion on CH05 specifically.
3. The Council should explicitly consider the loss of Strawberry Fields against current national guidance and evidence on food security and land use, including the uncertainty over its true agricultural grade, and publish this assessment as part of the evidence base for the allocation.
4. The Council should publish an assessment of the effect of permanently losing CH05 from agricultural use on the farming business that currently operates it.
5. The Council should respond directly to the Sheffield Green Belt Alliance's Site Capacities Investigation and publish a revised capacity figure for CH05 that properly accounts for drainage, internal roads, landscape and ecological mitigation constraints.
6. The Council should confirm whether relying on a predictive agricultural tool it has itself described as unsuitable for individual-parcel decisions, where that evidence directly conflicts with first-hand evidence from the land's farmer, meets the evidential standard required to support a significant allocation decision, or whether a more robust assessment is required before CH05 can lawfully be relied upon in its current form. |
| 642 |
5068564 |
19/10/2026 |
John Herbert |
Online |
|
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
Agricultural land classification - site S01179. Ref NWS13 |
|
No |
No |
The Wigan Farm site is allocated 3b, 4, 5 classification. This is incorrect . We live adjacent and it has been used for grazing cattle and sheep It is currently being harvested tor animal feed. |
The ALC indicator should be changed to reflect its current use as agricultural land. |
| 643 |
5068777 |
19/10/2026 |
Anita Gregory |
Online |
|
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
NES37 |
|
No |
No |
Overall using farming land for building should be the absolute last resort at a time where food security is key it seems absolute madness to develop land that has an agricultural purpose
Tom Hunt said to us at a meeting that the Sheffield plan would have looked very different if they had more time. SCC has had more time but seems he’ll bent on pressing a head with this regardless of the real evidence
It feels like a done deal where the evidence is being made to fit and this is all just window dressing
1. NEW AGRICULTURAL LAND EVIDENCE
REFERENCE: Updated Integrated Impact Assessment (IIA/SA), Appendix B – Site Selection Addendum: Agricultural Land Updates
New DEFRA agricultural-land data became available after NES37 was selected. SCC confirms that this information was unavailable when the additional Green Belt sites were chosen in early 2025. The new data can distinguish Grade 3a from Grade 3b; Grades 1, 2 and 3a are Best and Most Versatile (BMV) agricultural land.
For NES37, SCC's assessment has changed from: Neutral (-) → Higher-quality agricultural land (N).
- Would NES37 still have been selected if this better agricultural-land information had been available when the Green Belt sites were chosen?
2. NEW EVIDENCE SHOWS GREATER HARM TO LAND AND SOILS
REFERENCE: Updated Integrated Impact Assessment (IIA/SA), Section 5 – Implications of Agricultural Land Data Set Updates
The Council's new evidence makes the assessment less favourable to development in the wider Grenoside/Ecclesfield area, which includes NES37.
The assessed impact on Land and Soils has changed from: Minor Negative → Moderate Negative. This is because the new evidence identifies substantial areas of Grade 2 and Grade 3a agricultural land, both of which are classed as Best and Most Versatile agricultural land.
The new evidence has also caused the assessment for the Sheffield Plan as a whole on Land and Soils to worsen from Neutral to Minor Negative.
- Now that SCC's own new evidence identifies greater harm than was known when NES37 was selected, has the Council properly reconsidered whether NES37 should still be allocated?
3. WHY NES37 RATHER THAN POORER-QUALITY LAND?
REFERENCE: Updated Integrated Impact Assessment (IIA/SA), Appendix B – Site Selection Addendum: Agricultural Land Updates
The Council's new assessment considers whether sites now identified as higher-quality agricultural land remain appropriate when poorer-quality alternatives are available.
SCC itself cites the relevant national planning policy: where significant development of agricultural land is necessary, poorer-quality land should be preferred to higher-quality land. SCC nevertheless concludes that its proposed allocations should remain.
- Has SCC adequately demonstrated why higher-quality agricultural land at NES37 should still be developed rather than reasonable alternatives on poorer-quality land?
4. CAN NES37 REALLY DELIVER 592 HOMES?
REFERENCE: MM351 – NES37; NES37 ecological/BNG evidence; Updated IIA/SA
SCC's allocation assumes 592 homes on NES37. However, the site must also accommodate education and burial provision, alongside ecological buffers, retained habitats and landscape features, open space, drainage and other infrastructure requirements.
Ecological and Biodiversity Net Gain assessments have been undertaken for NES37 and identify habitat and ecological constraints that need to be accommodated within the development.
Taking account of the known constraints affecting the developable area, including the watercourse, ecological requirements, public footpaths and access, the estimated capacity is substantially lower than SCC's figure:
SCC capacity: 592 homes
Constraint-based capacity: 354–413 homes
Potential reduction: 179–238 homes
This estimate already takes account of known constraints including the watercourse, ecology, public footpaths and access.
- If NES37 can realistically deliver substantially fewer than 592 homes once its ecological an d other constraints are applied, has SCC reconsidered whether the reduced housing benefit justifies the loss of land now identified as higher-quality agricultural land |
Overall using farming land for building should be the absolute last resort at a time where food security is key it seems absolute madness to develop land that has an agricultural purpose
Tom Hunt said to us at a meeting that the Sheffield plan would have looked very different if they had more time. SCC has had more time but seems he’ll bent on pressing a head with this regardless of the real evidence
It feels like a done deal where the evidence is being made to fit and this is all just window dressing
1. NEW AGRICULTURAL LAND EVIDENCE
REFERENCE: Updated Integrated Impact Assessment (IIA/SA), Appendix B – Site Selection Addendum: Agricultural Land Updates
New DEFRA agricultural-land data became available after NES37 was selected. SCC confirms that this information was unavailable when the additional Green Belt sites were chosen in early 2025. The new data can distinguish Grade 3a from Grade 3b; Grades 1, 2 and 3a are Best and Most Versatile (BMV) agricultural land.
For NES37, SCC's assessment has changed from: Neutral (-) → Higher-quality agricultural land (N).
- Would NES37 still have been selected if this better agricultural-land information had been available when the Green Belt sites were chosen?
2. NEW EVIDENCE SHOWS GREATER HARM TO LAND AND SOILS
REFERENCE: Updated Integrated Impact Assessment (IIA/SA), Section 5 – Implications of Agricultural Land Data Set Updates
The Council's new evidence makes the assessment less favourable to development in the wider Grenoside/Ecclesfield area, which includes NES37.
The assessed impact on Land and Soils has changed from: Minor Negative → Moderate Negative. This is because the new evidence identifies substantial areas of Grade 2 and Grade 3a agricultural land, both of which are classed as Best and Most Versatile agricultural land.
The new evidence has also caused the assessment for the Sheffield Plan as a whole on Land and Soils to worsen from Neutral to Minor Negative.
- Now that SCC's own new evidence identifies greater harm than was known when NES37 was selected, has the Council properly reconsidered whether NES37 should still be allocated?
3. WHY NES37 RATHER THAN POORER-QUALITY LAND?
REFERENCE: Updated Integrated Impact Assessment (IIA/SA), Appendix B – Site Selection Addendum: Agricultural Land Updates
The Council's new assessment considers whether sites now identified as higher-quality agricultural land remain appropriate when poorer-quality alternatives are available.
SCC itself cites the relevant national planning policy: where significant development of agricultural land is necessary, poorer-quality land should be preferred to higher-quality land. SCC nevertheless concludes that its proposed allocations should remain.
- Has SCC adequately demonstrated why higher-quality agricultural land at NES37 should still be developed rather than reasonable alternatives on poorer-quality land?
4. CAN NES37 REALLY DELIVER 592 HOMES?
REFERENCE: MM351 – NES37; NES37 ecological/BNG evidence; Updated IIA/SA
SCC's allocation assumes 592 homes on NES37. However, the site must also accommodate education and burial provision, alongside ecological buffers, retained habitats and landscape features, open space, drainage and other infrastructure requirements.
Ecological and Biodiversity Net Gain assessments have been undertaken for NES37 and identify habitat and ecological constraints that need to be accommodated within the development.
Taking account of the known constraints affecting the developable area, including the watercourse, ecological requirements, public footpaths and access, the estimated capacity is substantially lower than SCC's figure:
SCC capacity: 592 homes
Constraint-based capacity: 354–413 homes
Potential reduction: 179–238 homes
This estimate already takes account of known constraints including the watercourse, ecology, public footpaths and access.
- If NES37 can realistically deliver substantially fewer than 592 homes once its ecological an d other constraints are applied, has SCC reconsidered whether the reduced housing benefit justifies the loss of land now identified as higher-quality agricultural land |
| 644 |
5069389 |
19/10/2026 |
Janet Harris |
Online |
|
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
EXAM 130C |
|
Yes |
No |
A nod is given to green space in the city centre (which is virtually nonexistent), while most of the changes are about protecting green space. |
Developers in the city centre and surrounding area, such as Kelham Island, need to add futher plans to expand green space to their proposed developments. Becuase there is no green space to be rotected, and they need to contribute to creating green space. This could include building further away from curbs, thereby allowing grey to green plantings to be added. If developments have already been approved Iwhcih they have) then future applications need to contain this requirement. Where developments without additional green space have already been approved, the City Council needs to review the remaining land in the area and protect some of it for poacket parks. Further, the proposed ski development needs to have restrictions imposed before planning approval which protect the green sopace and wildlife in the area as a condition of approving the development. Part of this process neeeds to be active iand equal nvolvement of citizens in co-creating requrements for the planning approval. This is the only green space that people in Pitsmoor, Kelham, Neepsend, and Birngreave can access and an amendment needs to be added to the plan saying that it will be protected. |
| 645 |
5074202 |
21/10/2026 |
Ben Graney |
Online |
|
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
|
|
No |
No |
Representation on the further proposed Main Modifications and the Habitats Regulations Assessment, in relation to site SWS18
To the Planning Inspectors,
I live on **REDACTED**, directly opposite proposed allocation SWS18 (Land between Lodge Moor Road and Redmires Conduit, around 258 homes).
1. Habitats and wildlife (Habitats Regulations Assessment and Integrated Impact Assessment)
We have seen hares, owls and badgers on these fields. Badgers and nesting birds are legally protected, and hares are a priority species for conservation. The site also borders a Local Wildlife Site and a watercourse, and I understand the site policy requires a 10m buffer. I ask the Inspectors to consider whether the assessments properly address:
- loss of foraging and nesting habitat, and whether adequate seasonal surveys have been carried out
- construction, noise and lighting disturbance next to the Local Wildlife Site
- surface water run-off into the watercourse
- the cumulative recreational pressure on nearby protected habitats from around 258 new homes
Modification sought: that any allocation of SWS18 is made conditional on full seasonal ecological surveys, an enforceable buffer that is wider than 10m where the evidence supports it, and measurable biodiversity net gain delivered on or close to the site.
2. Deliverability and effectiveness (soundness)
I am concerned that SWS18 may not be effective or deliverable as allocated. Lodge Moor Road is not wide enough for the traffic that this number of homes would generate, or for construction traffic. There is barely space for 2 normal cars, and no pavement after house no32. Kids and pedestrians use this road to walk to the park and conduit and kids are regularly on bikes. Weather conditions can be very foggy making this extremely dangerous.
The site is also crossed by a watercourse, and the Plan itself says flood risk must be carefully considered. The gardens backing onto the fields already flood.
Modification sought: that the Inspectors satisfy themselves that safe access and flood risk can be dealt with before confirming the allocation, and that the site policy requires highway safety, flood risk and ecology assessments to be completed and acted on before any planning permission is granted.
3. Scope
I recognise that some of these points concern a part of the Plan that is not being modified in this round. If the Inspectors consider them to be outside the scope of this consultation, I ask that they are recorded and passed to the Council so they can be considered at the planning application stage.
Thank you for considering this representation.
Ben |
|
| 646 |
5051736 |
21/10/2026 |
Chris Blackmore |
Online |
|
|
Integrated Impact Assessment: Sustainability Appraisal note to respond to Examination queries and Further Main Modifications |
|
|
Yes |
No |
I consider the proposed modification to be unsound due to inadequate consideration of the environmental impact of building on Green Belt land. Notwithstanding the understandable pressure to provide adequate housing and other amenities within the city, I strongly object to use of Green Belt land which - despite assurances to the contrary - I believe results in lasting damage to the local environment, at a time when the evidence of the climate emergency is growing more and more clear. Green Belt land is becoming more important as a buffer to ameliorate the effects of extremes - both of heat and of flooding. I have a role in Sustainability at the University of Sheffield and take an evidence-based approach to environmental sustainability. This requires us all to take a long-term view of the situation - beyond even the length of the local action plan. Whilst there is not yet a legal framework I can call upon to raise objections to the plans being proposed, as the consultation process appears to have been followed correctly, it is my view that the Sustainability Appraisal has not adequately factored in environmental sustainability to its evalation. In light of the changing circumstances that the city will face, Green Belt land has an increasingly vital role in our community and civic life, and if anything, we should be looking to increase and restore the green belt rather than allowing its use. Brownfield and other sites should be prioritised, even where this incurs additional cost, because the longer term cost to us all of losing Green Belt land - even if it is a relatively small amount at 4% - and degrading the natual environment will be immeasurable.
My objections fall under the following headings:
1. Loss of Environmental & Biodiversity Protections:
It is undeniable that developing Green Belt parcels permanently destroys existing habitats, ecological corridors, and carbon-absorbing green spaces. Even with proposed Biodiversity Net Gain (BNG) requirements, mature ecosystems cannot be easily recreated on replaced land.
2. Urban Sprawl & Loss of Identity:
A primary purpose of the Green Belt is to prevent urban coalescence—the merging of distinct towns and villages. Allocating green belt sites risks eroding the unique local character and identity of individual communities.
3. Inadequate Infrastructure Provision:
Outer-area green belt developments put severe pressure on existing local infrastructure—including road networks, public transport links, GP surgeries, and primary schools—which are already operating near or at capacity. A pressing example is that of proposed new burial sites on Green Belt land in already busy traffic areas.
4. Impact on Agricultural Land:
Releasing certain green belt sites converts valuable agricultural soils (often previously classified or assessed as higher quality) into urban land, impacting local food production capabilities and soil health.
5. Prioritisation of Brownfield First:
The council should exhaust all potential brownfield, windfall, and high-density urban site options before reallocating any green belt land, as urban site capacity and windfall calculations are frequently underestimated. |
I believe the Sustainability Appraisal is unsound as it does not adequately consider the range and duration of environmental impacts arising from use of Green Belt land. In the Sheffield Local Plan: Sustainability Appraisal, the Green Belt release is classed as 'Mixed / Adverse' but the local action plan suggest the acknowledged environmental damage and harms are mitigated by other societal benefits. In my view, this belies a fundamental underappreciation of the seriousness of the environmental situation facing us collectively. The SA should be reconsidered, to take this into account, with formal input from local organisations such as Sheffield & Rotherham Wildlife Trust, The Woodland Trust and Forestry Commission, Don Cathcment Rivers Trust, South Yorkshire Climate Alliance or Clean Air Sheffield. |
| 647 |
5077602 |
22/10/2026 |
William Ward |
Online |
The Woodland Trust |
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
EXAM 130C |
|
Yes |
No |
The Proposed Additional Site Allocations: Promoted Urban Sites document identifies the Sheffield Hallam University Collegiate Campus on Collegiate Crescent as a potential allocation. However, the supporting assessment acknowledges that the site is currently in active use and may not be available or deliverable within the plan period.
The Woodland Trust wishes to highlight the presence of ancient woodland at Lynwood Gardens (Grid Reference: SK 33927 86719), located in close proximity to the proposed allocation. Ancient woodland is an irreplaceable habitat and receives strong protection under national planning policy.
Any redevelopment or intensification of development at the Collegiate Campus must fully consider the potential direct and indirect impacts on this ancient woodland, including effects arising from habitat loss, root damage, changes in hydrology, increased recreational pressure, lighting, noise, air pollution, and other edge effects. Appropriate avoidance and mitigation measures should be incorporated at the earliest stage of site design to ensure that the ancient woodland and its ecological integrity are protected, including an appropriate amount of buffer between the development and Lynwood Gardens.
Given the irreplaceable nature of ancient woodland, the site should only be allocated where it can be clearly demonstrated that development can avoid unacceptable adverse impacts. If adequate avoidance and mitigation measures cannot be secured, the site should not be allocated for development. |
To make the policy sound, the allocation should be amended to explicitly recognise the presence of nearby ancient woodland at Lynwood Gardens and require any development proposals to demonstrate that adverse impacts on this irreplaceable habitat can be avoided.
The policy should require development proposals to undertake appropriate ecological assessment at the earliest stage of the planning process; avoid direct and indirect impacts on the adjacent ancient woodland, including impacts arising from construction, changes in hydrology, lighting, air pollution, noise, and increased recreational pressure; incorporate suitable buffers and other avoidance and mitigation measures in line with national policy and standing advice; deliver measurable biodiversity enhancements that contribute to the long-term protection and management of the woodland.
In addition, the supporting text should make clear that, given the irreplaceable nature of ancient woodland, development resulting in the loss or deterioration of this habitat will not be supported. Without these safeguards, the policy is not sufficiently robust to ensure that the site's development would accord with national planning policy relating to the protection of ancient woodland. |
| 648 |
5077308 |
22/10/2026 |
Frances Barber |
Online |
|
I am commenting on FMM5 (Policy BG1) and FMM16 (Policy GS5) as they would apply to [SES29, SES30 or both]. I do not think they are sound as drafted, for the reasons below.
I have known these fields all my 73 years living in Handsworth. I grew up play and walking through them and have seen them through all seasons, walked and run through them bathed in sunshine, showered with rain, whirled in winds and covered in snow. I have watch the sky change from blue to grey and I have watched seasons come and go. I have walked through fields of corn, picked the poppies that grew at my feet. Watched the farmers tending the land and harvesting their crops. In autumn the hedge rows and trees are shades of gold, red and brown and the harvest begins. There are red berries and fruit on the trees, sycamore keys, acorns and sweet chestnut falling to the ground to be gathered by children. For wild life to forage. In winter, when the wild life hibernate, there is the beauty of snow covered field and trees glistening in the winter sun and birds take refuge from the harsh weather. In Spring there is new growth the trees and the hedgerow burst into life and saplings spring up to grow into strong trees. The hedge rows provide shelter for the wild live living within the fields. In summer they are lush and green with good pickings of blackberries. There are crops swaying in the warmth of the sun, wind and rain. I remember the working farm before the farm house and outbuildings were demolished, the activity of the farmers in the fields and the gates stopping access to their private land and home. After the demise of the farm the field remained constant and continued to be worked, ploughed, and harvested producing crops to sustain our lives and we were aloud to walk along the farm track and find new routes to take. I have seen foxes running through these fields in the early morning mist and dew. They come into my garden at night looking for food and I have laid in bed listening to them barking on the streets late at night. I have seen bats flying over my garden. I have seen buzzard hovering and I have watched small animals scurry across the lanes and disappear into the fields. I have watched and listened to birds flying overhead and birds of prey hovering in the sky searching for prey. I have seen photos of wood peckers in the woods beyond the fields. I have been told of badger setts along the lane. Much of the wild life remains hidden but we know it’s there and FMM16 makes the protection of the habitats that these species depend on, site-specific evidence. For SES30, the Council's ecology report (EXAM153) records one walkover survey and recommends further surveys. FMM5 also changes "comply with" to "be assessed against", which could weaken protection. The wild life are at the mercy of these reports which need specific wording to ensure their protection. They are defenceless against bull dozers, construction sites and men with clip boards determining whether they live or die. It’s imperative that surveys (FMM5) are carried out in the right seasons before condemning us and our wild live to the proposed plans for SES30 and SES29.
I have always thought of Sheffield as a green city and wherever you go there are green spaces and door step walk, Even the built areas have an open space to go on a door step walk, Wincobank Hill, Firth Park, Roe Woods, Cemetery Park Endcliffe Park Whitley Woods, Forge Dam Meersbrook Park, Hillsborough Park, Rivelin Valley, Ridgeway to Ford Bottom. Norfolk Park. 5 weirs walk, Sheffield and Tinsley Canal. Graves Park. Not to forget the open moors to the west and South, the more affluent area of the city. I could go on…
We, in the south east, are already described as a deprived area, What’s your plan? To cause more deprivation by depriving us of our open spaces?
You would be taking away most of our open spaces in one fell swoop, the stroke of a pen, a thoughtless vote. They are just a a group of letters and numbers to you, SES30 and SES29, but the impact to the area will be catastrophic creating more pollution, increased population, increased deprivation, increased traffic, congestion on already busy roads, increased risk of traffic accidents as the 30 mph speed limit is not observed. The entrance to Handsworth Grange Road is already a bottle neck as the doctors on the corner of Handsworth Road and Handsworth Grange do not have any parking for the surgery and there are 2 schools on the road making congestion worse at the start and finish of the school day. If the fields were to be built on, God forbid, there is an Increased risk of flooding on Beaverhill Road where the road already floods in the valley by Shuburt Bridge. Potential increased in waiting time at GP Surgeries, where exactly are you going to recruit more doctors to tend the increased population? Surgery’s are already stretched to their limits. Doctors are in short supply.
I have brought my children up in Handsworth and they have grown up with the beauty of these fields. For many years there was a horse stabled in a nearby allotment, his paddock was the field, that used to be on private land along the lane that lead up to the farm house. His name was Jake. The lane was opened up to the public when the farm house was demolished, here we used to bring Jake carrots and stroke him over the fence. We have walked the lanes. It is a place of tranquility where we can get away from the pressures of daily life it’s good for mental health to be able to walk and restore our well being, to be amongst nature. We have precious little open spaces in Handsworth they are our legacy and our children’s legacy. We will be trapped in the midst of bricks and mortar. Fences cannot replace hedge rows. Houses will just increase the stress of the locals. Fencing us in, restricting our movements adding to the frustration of being confined. Not everyone had the means to travel to find open spaces we need them close by within walking distance. We need to protest for our wild life, our flora and fauna, for our children for our elderly for all who live here for the oxygen it provides, for the food it gives us. For our rights to walk freely amongst the fields and trees, for the tranquility of being in nature. For our well being. Just being able to walk or sit and breathe in the surroundings is healing for the soul.
The area SES30, has a long history and is an important site of social history that needs careful consideration before it is destroyed under bricks and mortar and perhaps made a heritage site or left alone for it to be continually loved by the resident of Handsworth and continue it’s quiet existence in accordance with the Quaker ideology, and the Stacye family are left in peace amongst the tranquil setting of the farm land and woodland. Let me explain:
The first Quaker preacher and founder of the Quaker religion, George Fox, came here in the 17 century to preached his new religion and converted people to a new way of worship and a new way of life in the fields of SES30, then known as Cinder Hill. His religion was controversial and he was persecuted for his interpretation of Christianity and his teachings and for converting people to his new religion. Thousands came to listen to him but he was thought an extremist by the authorities especially during the Parliamentary rule of Oliver Cromwell. He was persecuted and, whilst in Handsworth, he took refuge with the Quaker family of Ballifield Hall. Their name was Stacye. From George Fox’s influence and to avoid persecution, in 1678, Mahlon Stacye, the son of the family, emigrated, with his wife Rebecca, to America where he began his ministry to teach his religion and the Quaker way of life to the people who lived there.
He settled near the Deltaware River where he bought land and built his home which he named Ballifield. The area became known as Trenton New Jersey he was the founder of the first church in Trenton. He also, according to ‘findagrave.com’ “was a member of the Council of Proprietors of West Jersey, a Commissioner for West Jersey, a member of the Royal Governor's Council, a member of the Provincial Assembly, and a Justice of the Peace for Burlington Co.”
He was baptised on 1 July 1638 in St Mary's Church, the 12 century Church, overlooking the proposed site SES30, and had been born in nearby Dore House, now the site of the Dore House industrial estate. Ballifield Hall was an ancient ancestral home of the Stacye family.
The Ballifield estate was built on their land the early 50s and I was born here in 1952.
When I was a child Ballifield Hall was an old man’s home and, when I attended Handsworth Infants,mI remember being taken there, along with my class mates, to sing Christmas Carols to the residents.
The hall has now been demolished and a purpose built Children’s home stands in its grounds named Malon Way. I also remember a derelict building which was possibly Dore House.
The Stacye family are buried in their own private, Quaker graveyard at the bottom of, Cinder Lane, now Grange Lane, (at the junction of Grange Lane and the Beaver Hill estate.) According to the cemetery records there are 8 or 9 simple Quaker graves each with a simple head stone stating their name.
I don’t know if two area names of Sheffield were influenced by the surnames of the Stacye family’s ancestors via Mahlon’s mother. The surnames Fulwood and Beighton are directly linked to her ancestry i.e:
Maria Garland, daughter of Thomas Garland (c 1536 - 1609) and Maria Beighton (d 1614), married John Fulwood of Eastwood, Nottinghamshire. Their daughter Mary Fulwood (d 1683 in Handsworth) married John Stacye (1598 - 1658) at Handsworth in 1618.
John and Mary were the parents of Mahlon Stacye.
According to ‘findagrave.com’
Mahlon died in 1704 and his gravestone was erected by a descendent in 1929. he’s hailed on his grave stone as Pioneer.
SES30 and SES29 has not only a Quaker history it has also has a long history of coal mining on both sites but that’s another story.
So I implore you to comply with FMM5 guidelines to carry out surveys in the right seasons, months for a whole year rounded assessment of our Green Belt before FMM16 is applied, it is vital we need to protect our wild life and our small bit of ‘country side’, our ancient history, it’s contribution to providing, water, oxygen and sustenance to both humans and wild life. It’s gives us quiet moments of contemplation, it gives us space to be in nature. It is a place of healing, good for body, mind and sole. It is small in comparison to the wide open spaces found to the North, West and South of our city.
South East matters as well.
Please inform me when the Inspectors' report is published.
Regards
Frances Barber |
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
|
|
No |
No |
SES30 is of significant importance not only to Handsworth and Woodhouse but to the whole of Sheffield. It is the site where Quakerism was introduced to Sheffield in the 17th century. The founder, George Fox, preached to thousand of people on the site then known as Cinder Hill. It is well documented that his interpretation of Christianity was thought to be extreme and he faced persecution. His influence on th Stacye family of Ballifield Hall, where he took refuge, led to the son, Mahlon Stacye, moving to America, to avoid persecution. He bought land and set up home with his wife. He naming it Ballifield after his ancestral home.There he started his mission and founded the first church. The area became known as Trenton New Jersey. He is buried in a Quaker grave yard. His head stone erected by a relative in 1929 hails him has a Pioneer. He was also many other influential thing including a judge.
His family are buried in their own Quaker grave yard (Exam 222) at the bottom of Grange Lane, then Cinder Lane. This is documented in grave yard records. They all have simple head stones with only their name. In conclusion the site should be preserve as an histrionical site of significant interest, as are battle fields.
In defence of the diverse wild life and flora and fauna it would be a loss to the area. There’s more negativity than positivity about building on the land. (SES 30 and SES29) Not only will you stripping away and destroying our and Sheffield’s vital history you will be creating increased risk factors to an area that is already stretched to it limits in respect of population, traffic pollution, stretched resources. Health and well being.. the site give us oxygen to breath food to eat and a safe place for our wild life to live. In an area already recorded as a deprived area you will create more deprivation. |
Remove Handsworth and Woodhouse from the proposed plan. |
| 649 |
5079956 |
23/10/2026 |
Pancho Combley Lopez |
Online |
|
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
|
|
Yes |
Yes |
I don’t think it is. I strongly approve of it. Now get it going stop letting the nimbys waste everyone’s time and money. |
|
| 650 |
5083320 |
24/10/2026 |
Lindsey Gleeson |
Online |
|
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
NES37 |
|
No |
No |
Under new DEFFRA agricultural-land data it is now confirmed this land on NES37 is upgraded to best and most versatile agricultural land. From neutral to high quality agricultural land. Using this land shows greater new evidence to the land and soils.This evidence now makes the land unavailable for development of housing/schools and cemetery. Now that SCC’s own new evidence identifies greater harm than was previously known when NES37 was selected has the council properly considered this site should be allocated? Has SSC adequately demonstrated alternatives on poorer quality land? |
The only reasonable change would be to remove NES37 from the plan due to new evidence. This land is too valuable to loose for construction purposes. Even reducing the amount of houses still poses a significant loss of high quality agricultural land. |
| 651 |
5083712 |
24/10/2026 |
Cristina Olariu |
Online |
|
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
FMM (Sites NES37, NES38, NES39) |
|
No |
No |
Sheffield Plan Further Main Modifications – Formal Objection (Representation)
To the Independent Planning Inspector
I am writing as a local resident to submit a formal objection regarding the soundness of the Sheffield Plan Further Main Modifications and associated Policies Map changes (Map Ref NES37, NES38, and NES39).
I request that the Planning Inspector find the proposed housing allocations across North East Sheffield to be UNSOUND, and instruct the Council to completely remove these sites from the plan.
According to the National Planning Policy Framework (NPPF), a Local Plan must be Positively Prepared, Justified, Effective, and Consistent with National Policy. The proposal to allocate these contiguous Green Belt sites (and the associated modifications to their site boundaries and developable areas) fails all these tests on the following specific grounds:
1. Unjustified destruction of Green Belt while urban options remain (Fails the "Justified" Test)
National policy requires exceptional circumstances to alter protected Green Belt boundaries. High housing targets alone do not legally meet that bar, especially when brownfield land, underused urban property, and empty sites across Sheffield remain unexhausted. I disagree with the Council's reliance on the city-wide supply metrics in the Affordable Housing Supply Update (EXAM 187A) to justify releasing Green Belt land. Meeting numerical targets alone does not establish legal 'exceptional circumstances' under national policy, and overall housing needs should be addressed by maximizing urban brownfield density rather than sacrificing protected countryside. Housing can be built on previously developed land across the city; green space, once built on, is lost forever. Taking countryside out of the Green Belt across these modified site boundaries before exhausting urban alternatives makes this plan unsound and fundamentally unjustified.
2. Absence of a mandatory "Brownfield-First" policy (Fails "Consistency with National Policy")
I believe that the plan fails to demonstrate that all available brownfield and urban sites across Sheffield are fully developed before any protected Green Belt land is released. While the Council evaluated alternative urban sites in the Promoted Urban Sites Topic Paper Addendum (EXAM 130C), it dismissed many viable urban opportunities while omitting a binding "brownfield-first" policy or sequencing rule. The Council publicly claims to prioritize brownfield regeneration, yet the FMM still omits a strict "brownfield-first" policy or sequencing rule. It is hypocritical to promote urban renewal while leaving developers free to target countryside first. While urban brownfield land is neglected, our green belt space is permanently destroyed.
3. Cumulative destruction of village identity and active farmland (Fails the "Justified" Test)
The proposed development will erase the essential green buffer surrounding Grenoside, merging our historic village identity into continuous urban sprawl towards Ecclesfield and Chapeltown. I disagree with the Council's attempt in EXAM 219 to downplay the value of active farmland at Townend Farm (NES37), as sacrificing productive, working farms inflicts permanent damage on local food security, environmental heritage, and quality of life. Allowing this development creates a slippery slope where our remaining green spaces are chipped away piece by piece over time. Protecting this countryside is fundamental to community wellbeing, giving local residents accessible green space for mental health, exercise, and a sense of local identity.
4. Unfair discrimination against vulnerable residents lacking healthcare (Fails "Positively Prepared")
I assessed the updated Site Development Requirements and Integrated Impact Assessment (IIA) accompanying these modifications regarding infrastructure provision. They still fail to make binding provision for primary healthcare infrastructure. It explicitly sets aside land for schools and cemetery, yet completely ignores primary healthcare infrastructure. Grenoside and the surrounding area have an aging demographic with many vulnerable residents who rely heavily on local medical care. Our local practice, Grenoside Surgery, is already under severe strain with long wait times. Adding hundreds of households without providing extra medical facilities unfairly crowds out vulnerable residents from basic care. It is deeply flawed planning to set aside land for burial grounds while ignoring the healthcare required to support living residents.
5. Ineffectiveness and deep unfairness surrounding agricultural tenancies (Fails the "Effective" Test)
To allocate a site, the Council must prove it is realistically deliverable within the plan period. To my understanding, Townend Farm (NES37) is protected under an active agricultural tenancy, as examined in Council document EXAM 215 (SCC Legal Note re NES37 Tenancy) and alongside the agricultural land assessments in EXAM 219. I remain unconvinced by the Council’s legal note EXAM 215, which assumes that terminating an Agricultural Holdings Act tenancy is a simple administrative matter. I believe forcing long-standing tenant farming families off their livelihoods is deeply unfair. Moreover, the tenants intend to resist eviction, and local residents are committed to supporting them with legal and financial resources to defend their tenancy in court. Because the Council faces prolonged, contested legal opposition, it cannot guarantee vacant possession during the plan period. This makes the delivery of NES37 speculative and unsound.
I strongly believe once a green space is developed, it is gone forever. If we continue giving away protected land, we are on a dangerous trajectory to lose what little surrounding countryside we have left. Rather than treating our remaining green spaces as disposable targets for development, we must protect them so that everyone in our community, now and for generations to come, can continue to access this irreplaceable green belt landscape. I hope these considerations will be taken into account.
Yours sincerely,
Dr Cristina Olariu
**REDACTED**, Grenoside |
To address the soundness concerns identified, the following modifications must be considered:
Completely remove site NES37 (Townend Farm / Creswick Lane) from the Local Plan allocations and reinstate its full Green Belt protection status.
Completely remove site allocations NES38 (Holme Lane Farm) and NES39 (Wheel / Middleton Lane) to ensure a consistent, sound planning approach that protects the Green Belt buffer surrounding Grenoside.
Revert all associated Policies Map changes for sites NES37, NES38, and NES39 back to protected Green Belt. |
| 652 |
5084617 |
25/10/2026 |
James Conibear |
Online |
|
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
|
|
Yes |
No |
The whole process is complicated The proposals don't seem to match the council's proposed objective. Transport routes and local support services to new housing areas and likely commutes to where the jobs are planned seem inadequate |
|
| 653 |
5084827 |
25/10/2026 |
Christine Wall |
Online |
|
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
MM353 FMM33 EXAM187a Integrated Impact Assessment / Sustainability Appraisal |
|
Yes |
Yes |
|
SHEFFIELD PLAN – CONSULTATION – OCTOBER 2026
Further Main Modifications Plus New or Updated Evidence
Site Ref. NES39 – Wheel Lane / Middleton Lane
(A) New Agricultural Land Evidence
REFERENCE: Updated Integrated Impact Assessment (IIA/Sustainability Appraisal), Appendix B – Site Selection Addendum: Agricultural Land Updates
The new DEFRA agricultural land information hadn’t been available to the SCC when the Green Belt site (including NES39) was chosen.
Sheffield Council’s own updated assessment of site NES39, has reclassified the agricultural land quality score from Neutral (-) to Higher quality agricultural land (n).
National planning guidelines and local inspectors mandate that lower-grade agricultural land must be prioritised for development over land of national significance / Best and Most Versatile agricultural land.
In light of the above - I would ask if the Council would have chosen to develop site NES39, if this elevated assessment score had been available when they made their original selection?
(B) New Evidence shows Greater Harm to Land and Soils
REFERENCE: Updated Integrated Impact Assessment (II/SA), Section 5 – Implications of Agricultural Land Data Set Updates
The assessed impact on Land and Soils has now reduced from “Minor Negative” to “Moderate Negative”.
This updated assessment means that the development would cause noticeable, long term or irreversible harm and the allocation warrants closer scrutiny requiring proof that lower-quality sites are unavailable.
- In light of the above - I would like to ask - if the Council would have chosen site NES39 if this amended score had been available to them - when they made their original selection?
(C) Why Use Higher Quality Land when Poorer Quality Alternatives Exist?
REFERENCE: Updated Integrated Impact Assessment (IIA/SA), Appendix B - Site Selection Addendum: Agricultural Land Updates
Sheffield Council’s updated work identifies that there are other available sites which are assessed as poorer quality agricultural land than NES39.
As the National Planning Policy states that “where significant development of agricultural land is necessary, - poorer quality land should be preferred to higher quality land”.
- In view of the above, please could I ask whether site NES39 should remain as part of the SCC Local Plan – and if so, please could the Council explain why?
(D) Can site NES39 actually deliver 66 homes?
REFERENCE: MM353 – NES39, Inspectors’ Post Hearings Letter (Jan 2026); Updated IIA/SA; FMM33 and Exam 187a
Site NES39 was split into parcels A, B and C.
Planning Inspector, Katie Childs felt that she couldn’t justify development on Parcels B and C as “they made a strong contribution to the character and setting of the local area” - and she issued a Main Modification, removing them from the Plan.
Parcel A currently remains in the Local Plan, with Sheffield Council assessing a capacity of 66 homes.
Sheffield and Rotherham Wildlife Trust has visited the site.
The Trust state that neither the Preliminary Ecological Appraisal or the Biodiversity Net Gain assessment had been made available to the public. This is despite the council making references to ecological mapping and BNG calculations - and confirmation (at the hearings) that Ancient Woodland is present on or adjacent to the site. Without these baseline assessments, it is difficult to make a full and transparent evaluation of the true environmental impact.
During their visit, The Wildlife Trust identified ecological features on site - which had not been reflected in the documentation that had been available to the public (PEA or BNG were not available) -
eg. (1) The hedgerow along the eastern boundary which supports an abundance of ancient indicator species. This would indicate that it is ancient and therefore an irreplaceable habitat.
eg. (2) Parts of the site exhibit characteristics consistent with lowland acid grassland which is a priority habitat.
The Wildlife Trust did not consider that the planning protections were sufficient and that broader ecological/heritage constraints had not been fully evaluated.
The Trust found inconsistencies regarding the gross site area and capacity assumptions of Parcel A. The SCC Local Plan assumes a net developable area of 1.89 hectares and a capacity of 66 dwellings.
However, after policy compliant buffers and retained features are applied, they say that realistically, the developable area is significantly reduced.
They also stated that due to the fragmentation of the site and the need to retain continuous boundary features – it may further reduce the effective capacity or render parts of the site undevelopable.
They consider that - the Main Modifications do not demonstrate that these constraints have been taken into account in deriving the site capacity.
Independent reviews and environmental assessments submitted during consultations indicate that when generic planning assumptions are tested against known site constraints eg. Mandatory buffers, hedgerow retention etc – the realistic capacity drops from 66 to between 38 and 41 homes.
- I would like to ask if it would be commercially viable for site NES39 to deliver only 38 - 41 homes, (once applicable constraints are applied)?
- Also, as neither the PEA or BNG assessment have been made available to the public, as yet – it is possible that further restrictions could still be found, - so has SCC shown that the loss of this higher quality agricultural land remains justified?
(E) Affordable Housing has also Reduced Significantly
REFERENCE: FMM33 – Affordable Housing Monitoring Target and EXAM187A – Affordable Housing Supply Update
Document EXAM187A (Affordable Housing Supply Update) corrects the affordable housing calculation for NES39 – and the expected baseline contribution has reduced by over 50% from 44 to 20 affordable homes.
- As the expected housing and affordable housing benefits of NES39 have substantially reduced, - and the new evidence shows greater agricultural harm, - has Sheffield City Council adequately demonstrated that this Green Belt allocation remains justified?
In conclusion, I would ask - has Sheffield City Council adequately demonstrated that NES39 remains justified and deliverable, when new evidence identifies both higher quality agricultural land - and greater Land and Soils harm – while at the same time, its capacity could fall from 66 to 38-41 homes – (or potentially lower if further ecological constraints are identified)?
C Wall |
| 654 |
5086114 |
26/10/2026 |
Trevor Pilling |
Online |
None- local resident |
None |
Integrated Impact Assessment: Sustainability Appraisal note to respond to Examination queries and Further Main Modifications |
Further Main Modificationns Consultation and Impact Assessment 11A/5A |
|
No |
No |
As a resident of Wheel Lane **REDACTED** I wish to add my concerns about a number of issues still in place regarding the proposed building on NE39 Wheel Lane/Middleton Lane Greenbelt agricultural land via the SCC Further Main Modifications Consultation.
1 - Ref Updated Integrated Impact Assessment 11A/5A Sppendix B Site Selection Addendum - Agricultural Land Updates
SCC have confirmed that new DEFRA Agricultural Land information was not available or used by SSC when the NES39 Wheel Lane area of Grernbelt was selected.
SCC assessment for NES39 has now changed from the previously used neutral to now Higher Quality Agricultural Land N rating.
Would SCC still have included the NES39 site if it had had the higher rating at the time as they appear to have discounted other areas of similar high rating.
The NES39 land is important Best and Most Versatile farm land having been used for horses , cattle , hay production ,and growing of crops eg Winter Barley
The permanant loss of this valuable farm land seems to be in opposition to Government proposed future changes to protect the loss high quality agricultural land and the need for food production security.
2 - Ref - Updated Integrated Impact Assessment 11A/5A Section 5 Implications of Agricultural Land Data Set Updates
Proposed S35 Grenoside and Ecclesfield Greenbelt land contains Grade 2 and Grade 3a Agricultural land classed as mentioned above as Best and Most Versatile Agricultural Land and SCC should now identify that greater harm to the local environment would result if the land was built on rather than what was previously noted.
3- Ref - Updated Integrated Impact Assessment 11A /5A Appendix B Site Selection Adfendum Agricultural land update
I wish to question why SCC has planned to use the high quality NES39 agricultural land rather than some other land of poorer quality.
I do not feel thst SCC has adequately provided evidence that it had when NES was chosen considering that the list of alternative brownfield options was out of date when the plan was drawn up with the public identifying a considerable number of alternative options since then and that SCC did not include any smaller areas that could have provided a smaller number of houses on site but spread more equally accrosd the city rather than such a large number in S35
Planning inspector Katie Childs stated that parcel B of NES39 had "attractive riverside and meadow settings with quite considerable character and charm "
Parcel A is connected and an integral part of this and if built on the long view over the fields that Ms Child recognises would be blocked for all local residents unless directly opposite parcels B and C.
Parcel A is available for food production as previously used in the past although the current horses are a integral part of the lical community with children watching them on the way to anf from school.
The stone wall along Wheel Lane is of historical interest and made from local stone and Parcel A also connects to mature hedges and local Wild Life Buffer areas.
I believe that Sheffield and Rotherham Wildlife Trust has raised the concern that SCC has not provided any evidence that a Preliminary Ecological Appraisal PEA or Biodiversity Net Gain Assessment BNG have been carried out for NES39 or the findings made public.
This land is an agricultural , community , and wildlife asset that would be gone for ever for house building that SCC have not demonstrated could only be located there.
4 - Ref MM353 NES Inspectors Post Hearing Letter Jan 2026. Updated 11A / 5A FMM and exam 186a
Since parcel A is an integrated and connected part of NES39 it shares the same valued long views over the landscape and is also of high and versatile agricultural status.
Since parcels B and C have have are suggested to be withdrawn from NES39 building the originally planned number of 148 homes is not sustainable and has been reduced to possibly 66 .
Since SCC had not fully scoped out other available brownbelt or greenfield sites rather than use the NES39 Higher Quality Agricultural land I do not agree that this number of houses could not have been allocated elsewhere more suitably especially as I believe smaller developments suitable for 10 houses or less were not considered by SCC at the time of the Sheffield plan.
5 - Ref FMM Affordable Housing Monitoring Target on EXAM 187 A Affordable Housing Supply Update
Due to the unsuitability for development of parcels B and C on NES39 the number of possible affordable homes is likely to be reduced from 44 to 20 and possibly less if developers come back stating they need further reduction as has been the case in other areas.
Again I question if SCC has fully and openly demonstrated without doubt that this number of houses could not possibly be built on other brownbelt, greenland , or less valuable status land , somewhere within the Sheffield district especially if sites of less than 10 houses were to be included as available which they were not when the plan was drawn up or if some of the more recently identified brownfield sites were developed.
I continue to disagree with the continued inclusion of parcel A NES39 Wheel Lane Greenbelt land in the Sheffield plan for the reasons above as well as other S35 Greenbelt developments although I have kept my comments to my local land site.
I would also like to note the unsuitability of Wheel Lane and The Wheel for any increase in traffic volume due to increased housing Grenoside especially with a number of narrow bottlenecks on the way down to Ecclesfield.
When a local group of residents recently wanted to walk down from Grenoside to Ecclesfield Church on the pavement it was not allowed as the risk assessment ( possibly by the local police although I an not certain of this as I was not involved in any organisation or know if any police permission is legally required ) showed it was too dangerous due to sections of narrow pavement and road , combined with the usual current level of car traffic.
The route had to be changed from Wheel Lane and The Wheel to Yew Lane for safety reasons
Trevor Pilling |
Removal of Parcel A along with parcels B and C NES39 Wheel Lane / Middleton Lane from the Sheffield Plan |
| 655 |
5088304 |
27/10/2026 |
Shaun Wall |
Online |
|
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
MM353 - NES39 Inspector’s Post Hearing Letter FMM33 - EXAM187a - Updated Integrated Impact Assessment |
|
Yes |
Yes |
|
SHEFFIELD PLAN – CONSULTATION – OCTOBER 2026
Further Main Modifications Plus New or Updated Evidence
Site Ref. NES39 – Wheel Lane / Middleton Lane
(A) New Agricultural Land Evidence
REFERENCE: Updated Integrated Impact Assessment (IIA/Sustainability Appraisal), Appendix B – Site Selection Addendum: Agricultural Land Updates
The new DEFRA agricultural land information hadn’t been available to the SCC when the Green Belt site (including NES39) was chosen.
Sheffield Council’s own updated assessment of site NES39, has reclassified the agricultural land quality score from Neutral (-) to Higher quality agricultural land (n).
National planning guidelines and local inspectors mandate that lower-grade agricultural land must be prioritised for development over land of national significance / Best and Most Versatile agricultural land.
In light of the above - I would ask the Council to review the development of site NES39.
(B) New Evidence shows Greater Harm to Land and Soils
REFERENCE: Updated Integrated Impact Assessment (II/SA), Section 5 – Implications of Agricultural Land Data Set Updates
The assessed impact on Land and Soils has now reduced from “Minor Negative” to “Moderate Negative”.
This updated assessment means that the development would cause noticeable, long term or irreversible harm and the allocation warrants closer scrutiny requiring proof that lower-quality sites are unavailable.
- In light of the above - I would ask the Council to review the development of site NES39.
(C) Why Use Higher Quality Land when Poorer Quality Alternatives Exist?
REFERENCE: Updated Integrated Impact Assessment (IIA/SA), Appendix B - Site Selection Addendum: Agricultural Land Updates
Sheffield Council’s updated work identifies that there are other available sites which are assessed as poorer quality agricultural land than NES39.
As the National Planning Policy states that “where significant development of agricultural land is necessary, - poorer quality land should be preferred to higher quality land”.
- In view of the above, please could I ask whether site NES39 should remain as part of the SCC Local Plan – and if so, please could the Council explain why?
(D) Can site NES39 actually deliver 66 homes?
REFERENCE: MM353 – NES39, Inspectors’ Post Hearings Letter (Jan 2026); Updated IIA/SA; FMM33 and Exam 187a
Site NES39 was split into parcels A, B and C.
Planning Inspector, Katie Childs felt that she couldn’t justify development on Parcels B and C as “they made a strong contribution to the character and setting of the local area” - and she issued a Main Modification, removing them from the Plan.
Parcel A currently remains in the Local Plan, with Sheffield Council assessing a capacity of 66 homes.
Sheffield and Rotherham Wildlife Trust has visited the site.
The Trust state that neither the Preliminary Ecological Appraisal or the Biodiversity Net Gain assessment had been made available to the public. This is despite the council making references to ecological mapping and BNG calculations - and confirmation (at the hearings) that Ancient Woodland is present on or adjacent to the site. Without these baseline assessments, it is difficult to make a full and transparent evaluation of the true environmental impact.
During their visit, The Wildlife Trust identified ecological features on site - which had not been reflected in the documentation that had been available to the public (PEA or BNG were not available) -
eg. (1) The hedgerow along the eastern boundary which supports an abundance of ancient indicator species. This would indicate that it is ancient and therefore an irreplaceable habitat.
eg. (2) Parts of the site exhibit characteristics consistent with lowland acid grassland which is a priority habitat.
The Wildlife Trust did not consider that the planning protections were sufficient and that broader ecological/heritage constraints had not been fully evaluated.
The Trust found inconsistencies regarding the gross site area and capacity assumptions of Parcel A. The SCC Local Plan assumes a net developable area of 1.89 hectares and a capacity of 66 dwellings.
However, after policy compliant buffers and retained features are applied, they say that realistically, the developable area is significantly reduced.
They also stated that due to the fragmentation of the site and the need to retain continuous boundary features – it may further reduce the effective capacity or render parts of the site undevelopable.
They consider that - the Main Modifications do not demonstrate that these constraints have been taken into account in deriving the site capacity.
Independent reviews and environmental assessments submitted during consultations indicate that when generic planning assumptions are tested against known site constraints eg. Mandatory buffers, hedgerow retention etc – the realistic capacity drops from 66 to between 38 and 41 homes.
- I would like to ask if it would be commercially viable for site NES39 to deliver only 38 - 41 homes, (once applicable constraints are applied)?
- Also, as neither the PEA or BNG assessment have been made available to the public, as yet – it is possible that further restrictions could still be found, - so has SCC shown that the loss of this higher quality agricultural land remains justified?
(E) Affordable Housing has also Reduced Significantly
REFERENCE: FMM33 – Affordable Housing Monitoring Target and EXAM187A – Affordable Housing Supply Update
Document EXAM187A (Affordable Housing Supply Update) corrects the affordable housing calculation for NES39 – and the expected baseline contribution has reduced by over 50% from 44 to 20 affordable homes.
- As the expected housing and affordable housing benefits of NES39 have substantially reduced, - and the new evidence shows greater agricultural harm, - has Sheffield City Council adequately demonstrated that this Green Belt allocation remains justified?
In summary, I would ask - has Sheffield City Council adequately demonstrated that site NES39 remains justified and deliverable, when new evidence identifies both higher quality agricultural land - and greater Land and Soils harm – while at the same time, its capacity could fall from 66 to 38-41 homes – (and potentially even lower if further ecological constraints are identified)?
S Wall |
| 656 |
5088113 |
27/10/2026 |
Andrew Riddle |
Online |
|
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
exam219 |
|
Yes |
No |
personal representation NES37 townend farm
relevant evidence Exam219.updated agricultural landclassification2026
we are farmers of townend farm whish forms part or NES37 Housing allocation.We stongly oppose the proposed development of this land particularly in the light of the updated evidence identitying higher quality agricultural land.WE have farmed Townend farm for 45 years,and in that time we have improved the land from poor to high yielding land be it grassland or arable.we have transformed it into productive farmit is today.we are 1st generation tenants of a 3 generational tenancy.
Townend farm comprises29.8 ha of land ,predominantlygrazing of our70 strong suckler herd, als0 producing hay and fodder and arable crops for feeding to the herd.Townend farm provides secure grazing water supply,housing of cattle,and handling facilities.Being onsite is particularly iimportant for calving ,animal welfare,routine handling&TBTesting.Without Townend farm,we would not be able to farm,it would leave us with a small area of arable land,which would not be sustainsble.
we have always taken pride in looking after the land ,hedgerows and boundaries.The hedgerows and numerous mature trees,are important to the livestock and the wider countryside.We ask the inspectors to consider whether the councils udated agriculural assessment reflects the permanent loss of agricultural land identified as higher quality in EXAM219.The potential loss of a working farm we have spent decades developing with the intention of passing it on to our children.
WE strongly oppose to allocation of NES37 for housing.WE ask that the updated agriculural evidence together with the practical realities of farming this land and th consequences of our families livelihood be properly considered before the inspectors reach their conclusion.
ANDREW and ADELE RIDDLE
TOWNEND FARM |
|
| 657 |
5089897 |
27/10/2026 |
Seth Beighton |
Online |
|
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
FMM31 - CH04 Hesley Wood |
|
No |
No |
I am writing as a local resident to object to Further Main Modification FMM31. This modification reveals, for the first time, how CH04 would actually be delivered on the ground, and in my view it is not currently sound.
FMM31 makes clear that a highway access road from Cowley Hill will have to pass through the Hesley Wood Local Wildlife Site and Urban Green Space, and that remediation and ground remodelling work will extend into the Local Wildlife Site, Urban Green Space and Green Belt — well beyond the Industrial Zone itself. Hesley Wood is a densely wooded former colliery site, and I do not believe the degree of disturbance this would cause has been properly explained or assessed. Were alternative access options that avoid the Local Wildlife Site ever examined and ruled out on a reasoned, evidenced basis? If so, this assessment should be made public.
The new wording's reference to keeping "unavoidable harm" to the Local Wildlife Site "to a minimum" is itself an admission that harm to this protected site is anticipated. Local Wildlife Sites, ancient woodland and veteran trees carry specific protection under national planning policy, and the Council has not demonstrated that the relevant test for permitting this harm has been met — nor has it set out what the harm will actually involve, where it will occur, or why the site should still be allocated despite it.
I am equally concerned that the compensation wording — requiring unavoidable harm to be "fully compensated for through the provision and safeguarding of replacement habitats of a similar character and quality and be of an equivalent size" — comes with no detail on how this would be delivered, monitored or enforced, or who would be accountable for checking it happens. As it stands, I do not regard this as a credible or effective policy commitment, and I would ask the Council to set out the delivery and monitoring arrangements that would guarantee this compensation materialises, and what the fallback would be if suitable replacement habitat cannot be found nearby.
I would also highlight that Hesley Wood falls within a mapped ancient woodland restoration priority area under the South Yorkshire Local Habitat Map, produced by the South Yorkshire Mayoral Combined Authority and its partners. This allocation does not appear to have been reconciled with that designation, and I would like the Council to explain how earmarking this land for industrial access and development squares with its separate identification as a priority site for ecological restoration.
I also do not find it credible that the accompanying Sustainability Appraisal concludes this new information "does not change the overall characteristics or significance of effects." FMM31 confirms, for the first time, that access will run through a Local Wildlife Site, that works will extend beyond the Industrial Zone, that Green Belt and Urban Green Space will be affected, and that some harm may be unavoidable. I would ask the Council to explain, with supporting evidence, how it reached that conclusion.
Beyond this, I have several further concerns that FMM31 does not resolve:
Historic mining and ground stability — Hesley Wood has a documented history of coal and ironstone working, including recorded mine shafts and other former industrial features. I do not believe adequate site-specific evidence has been provided to demonstrate that ground stability and mine-entry risks can be managed safely, especially given the scale of remodelling now proposed.
Contamination — the site has previously been identified as containing heavy metals and other hazardous substances. I would ask what contamination has already been identified, how extensive it is, what remediation it would require, and whether this has been informed by proper investigation from a competent person.
Impact of the remediation process itself — remediation is not without environmental consequence in its own right: excavation, vegetation clearance and changes to drainage all carry impacts. I do not believe these have been assessed separately from the condition of the land once remediation is finished, as the NPPF requires.
Human health — I would ask whether the health implications for existing residents, construction workers and future site users have been properly assessed using up-to-date evidence, covering risks such as dust, asbestos, and contamination of soil, groundwater and surface water, and request that this assessment be published if it exists.
Finally, CH04 is not the only site in this consultation where boundaries or capacities have changed (NWS30 and NES38, for example). I do not believe the combined effect of these changes on local wildlife corridors, the Local Nature Recovery Network and Green Belt purposes in this area has been considered together, rather than site by site. I would ask the Council to confirm whether any cumulative assessment has taken place, and if not, why not.
My overall question is this: has the Council properly demonstrated that CH04 remains a suitable and justified employment allocation, given that FMM31 confirms access through a Local Wildlife Site, works beyond the Industrial Zone, unresolved habitat compensation arrangements, an unreconciled conflict with the South Yorkshire Local Habitat Map, known contamination and public health risk, a history of mining, land-stability concerns, and unassessed cumulative impacts across nearby sites?
I also do not consider this Further Main Modification to be legally compliant. The SEA Regulations and the Habitats Regulations require that the environmental consequences of a plan modification be properly and adequately assessed before it is adopted. FMM31 reveals, for the first time, that access to CH04 will require routing through the Hesley Wood Local Wildlife Site, that remediation and remodelling will extend into the Local Wildlife Site, Urban Green Space and Green Belt, and that harm to the Local Wildlife Site may be unavoidable. Despite this materially new information, the Sustainability Appraisal maintains that it "does not change the overall characteristics or significance of effects" — a conclusion I do not consider has been adequately evidenced. On that basis, I do not believe the assessment behind FMM31 meets the standard the SEA Regulations require. It does not appear to properly address: the environmental implications of routing access through a Local Wildlife Site, including whether alternatives were assessed; the scope and deliverability of the habitat compensation required, and who would be responsible for securing and monitoring it; the site's status within the South Yorkshire Local Habitat Map's ancient woodland restoration priority areas, and whether this has been reconciled with the allocation; and the cumulative environmental effect of CH04 taken together with other site allocations whose boundaries or capacities have changed in this consultation. Until these gaps are properly assessed and evidenced, I do not believe FMM31 can be considered legally compliant. |
The Council should not finalise FMM31 until it has published evidence that access routes to CH04 avoiding the Hesley Wood Local Wildlife Site were genuinely considered and reasonably ruled out.
FMM31 (or its supporting policy text) should be amended to specify who is responsible for securing replacement habitat, the required timing (for example, that compensatory habitat must be in place before or alongside development, not after it), and a clear monitoring and enforcement mechanism naming the body responsible for checking compliance.
The Council should explain how allocating CH04 for industrial access and development can be reconciled with Hesley Wood's identification as an ancient woodland restoration priority area under the South Yorkshire Local Habitat Map — or amend the allocation or modification to resolve the contradiction.
To meet the requirements of the SEA Regulations, the Council should commission and publish a supplementary environmental assessment covering access through the Local Wildlife Site, the scale of remediation and remodelling beyond the Industrial Zone, and the nature of the "unavoidable harm" now acknowledged — rather than continuing to rely on the existing Sustainability Appraisal's finding that this new detail "does not change the overall characteristics or significance of effects."
The Council should publish a cumulative assessment of the combined impact on local wildlife corridors, the Local Nature Recovery Network and Green Belt purposes arising from all site allocations in this consultation with amended boundaries or capacities — including CH04, NWS30 and NES38 — rather than assessing each in isolation.
Before FMM31 is finalised, the Council should commission and publish site-specific ground investigation evidence, prepared by a competent person, addressing former mining features, ground stability and contamination at Hesley Wood.
The environmental assessment should be widened to capture the impacts of the remediation process itself — excavation, spoil movement, vegetation loss and drainage changes — not just the state of the land once remediation is complete.
The Council should publish a human health impact assessment covering the risks to existing residents, construction workers and future site users from disturbing historically contaminated ground, including dust, asbestos, and soil and water pathways. |
| 658 |
5089969 |
27/10/2026 |
Seth Beighton |
Online |
|
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
FMM31 - CH03 Warren Lane |
|
No |
No |
I am submitting this representation as a local resident. While none of the Further Main Modifications directly amends the CH03 allocation, the updated agricultural land evidence published for this consultation is directly relevant to whether the allocation remains sound. I do not consider that the Council has adequately addressed the significance of this new evidence.
The updated DEFRA Predictive Agricultural Land Classification changes CH03 from a neutral rating to a predicted higher-quality classification, potentially including Best and Most Versatile land. The Council's own evidence recognises that this updated mapping is more detailed than the information available when the site was originally selected. However, the Council's conclusion regarding the suitability of CH03 remains unchanged, and I do not consider that this position has been adequately justified.
The NPPF makes clear that, where development of agricultural land is necessary, poorer-quality land should be preferred to higher-quality land. I do not believe the Council has demonstrated that CH03 would still have been selected for release from the Green Belt if the updated agricultural evidence had been available during the original comparative site-selection process.
CH03 remains active farmland in agricultural use. The updated evidence does not appear to have adequately assessed the consequences of permanently removing this land from agricultural production. Nor has the Council addressed the additional agricultural harm alongside the site's existing constraints, including the Tankersley Railway Tunnel, overhead electricity infrastructure and proximity to residential properties. These constraints reduce the area of land that would actually be available for development once appropriate buffers and mitigation measures have been taken into account.
I also consider that this allocation should be assessed in the context of the wider national position on food security. Government and independent assessments have identified growing pressures on UK food supply and affordability arising from climate change, reduced domestic self-sufficiency and global supply disruption. Some analysis has also warned of a significant risk to the resilience of the food system in the coming years. In this context, the permanent loss of newly identified higher-grade agricultural land appears inconsistent with the direction of national thinking on food security. I do not believe the Council's evidence base has adequately considered the CH03 allocation in this wider context.
The Council has not, in my view, demonstrated how much genuinely usable employment land could realistically be delivered at CH03 once its physical constraints have been taken into account. Nor has it demonstrated that the loss of higher-grade working farmland is justified when the actual deliverable employment capacity may be significantly reduced, food security considerations are becoming increasingly important, and alternative sites may be available.
I therefore ask whether the Council has adequately demonstrated that CH03 remains a suitable, justified and deliverable employment allocation in light of the updated agricultural land evidence, the site's continued agricultural use, its existing physical constraints and the wider national context of food security.
I also consider that the evidence supporting the continued allocation of CH03 is not legally compliant, specifically in relation to the assessment of reasonable alternatives.
The updated DEFRA Predictive Agricultural Land Classification changes CH03 from a neutral agricultural rating to a predicted higher-quality classification, potentially including Best and Most Versatile land. This represents a materially different starting point from the evidence available when CH03 was originally selected through the Council's comparative site-selection exercise.
The SEA Regulations require reasonable alternatives to be identified and assessed as part of the environmental assessment supporting a plan or modification. Where the underlying agricultural evidence relating to a site has materially changed, as it has in this case, I do not consider it legally sufficient for the Council to continue relying on a comparative assessment undertaken using the previous, lower-quality classification.
The comparative position of CH03 relative to other candidate sites or sites containing lower-grade agricultural land may now be different, but this comparison does not appear to have been revisited. I am not aware of any published evidence confirming whether alternative sites containing lower-grade agricultural land were available and assessed using the updated classification, or explaining why such sites were not considered as reasonable alternatives to CH03 in light of the new information.
I therefore ask whether the Council has complied with its obligations under the SEA Regulations to assess reasonable alternatives to CH03, given that the agricultural land evidence underpinning the original comparative site-selection exercise has materially changed. |
The Council should reassess CH03 against the other sites included in its original comparative site-selection exercise, using the updated DEFRA agricultural land classification, and publish the results.
The Council should publish an assessment of the consequences of permanently removing CH03 from agricultural use, including the effects on the farming business currently operating the land.
The Council should publish a combined assessment considering the agricultural harm alongside the site's existing physical constraints.
The Council should publish a clear figure showing how much usable employment land CH03 could realistically deliver after accounting for all known constraints, buffers and mitigation measures.
The Council should explicitly assess the loss of newly identified higher-grade agricultural land at CH03 against current national guidance and evidence concerning food security and land use, and publish this assessment as part of the evidence base supporting the allocation.
To comply with the SEA Regulations, the Council should confirm whether alternative sites containing lower-grade agricultural land were available and assessed as part of the original site-selection exercise. If they were not, the Council should confirm whether any such sites should now be considered in light of the updated evidence. |
| 659 |
5089980 |
27/10/2026 |
Seth Beighton |
Online |
|
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
FMM31 - CH05 Strawberry Fields |
|
No |
No |
I am submitting this representation as a local resident. The new evidence published as part of this consultation raises concerns about whether the continued allocation of CH05 remains justified, and I do not consider these concerns have been adequately addressed.
The updated DEFRA predictive agricultural assessment changes the classification of CH05 from neutral to poorer-quality land. However, the Council's own evidence acknowledges that this predictive mapping is a strategic planning tool and may not be reliable when assessing an individual parcel of land. This is particularly significant because the farmer who actively cultivates the land describes its soil as excellent and considers this plot to be among the best land he farms. Given the clear discrepancy between a desktop-based predictive assessment and the direct experience of someone who works the land, I question whether the Council should commission a site-specific Agricultural Land Classification survey before relying on the predictive classification to justify this allocation.
I would also point out that, although the site-level assessment of CH05 has become more favourable towards development, the Council's updated evidence shows that the Plan-wide Land and Soils assessment has deteriorated from Neutral to Minor Negative. Despite this worsening assessment, the Council has not changed its conclusion that the allocations remain appropriate. I therefore question whether the increased understanding of the Plan's overall impact on land and soils should lead to greater caution before productive farmland such as Strawberry Fields is permanently removed from agricultural use, rather than the Council proceeding without revisiting its position.
This allocation should also be considered in the context of the wider national situation regarding food security. Government and independent assessments have identified growing pressures on UK food supply and affordability, driven by climate change, reduced domestic self-sufficiency and global supply disruption. Some analysis has warned of a significant risk to the resilience of the food system in the coming years. In these circumstances, I consider it particularly important that any reclassification of productive farmland as "poorer quality" is properly tested where it is based on a tool that the Council itself acknowledges may be unreliable at the individual site level. This is especially important when the classification conflicts with the first-hand knowledge of the farmer responsible for managing the land.
CH05 remains active and productive farmland. I do not consider that the predictive classification establishes the land's actual productivity or adequately explains the consequences of its loss for the farming businesses that depend on it. I therefore question whether the Council has properly assessed these practical, real-world impacts rather than relying primarily on a desktop-based classification.
I also remain concerned that the housing capacity assumed for CH05, of 549 homes, has not been adequately tested. The Sheffield Green Belt Alliance's Site Capacities Investigation examined constraints including drainage, internal roads, landscape mitigation and ecological mitigation, and estimated a substantially lower realistic capacity for the site. Although this investigation does not constitute new evidence, the Council has now published an updated Integrated Impact Assessment/Sustainability Appraisal as part of this consultation. I therefore ask whether the updated assessment has adequately addressed the capacity concerns that were previously raised.
I further consider that the evidence supporting the continued allocation of CH05 is not legally compliant. The SEA Regulations require the environmental assessment supporting a plan to be adequate and sufficiently robust to justify the decision it informs.
In this case, the Council's updated evidence reclassifies CH05 using a predictive tool that its own documentation describes as a strategic planning instrument, which may not be suitable for determining the agricultural quality of an individual parcel of land. This reclassification directly conflicts with the first-hand evidence provided by the farmer who works the land. I do not consider that an assessment relying on a tool with acknowledged limitations, without resolving this direct conflict with contrary first-hand evidence, meets the standard of adequacy required by the SEA Regulations. This is particularly concerning given that the allocation could result in the permanent loss of productive farmland.
These concerns are heightened by the increasing challenges facing national food security. I therefore ask whether the Council has adequately demonstrated that CH05 remains a justified and deliverable allocation, taking into account the unresolved uncertainty about the land's true agricultural quality, the wider national context of food security, the previously raised concerns about its realistic housing capacity, and whether the evidence supporting the reclassification meets the required legal standard. |
The Council should commission a site-specific Agricultural Land Classification survey of CH05 before relying on the predictive reclassification as justification for the allocation.
The Council should provide an evidence-based explanation of why the Plan-wide deterioration in the Land and Soils assessment, from Neutral to Minor Negative, does not alter its conclusions specifically in relation to CH05.
The Council should explicitly assess the loss of Strawberry Fields against current national guidance and evidence concerning food security and land use, taking into account the uncertainty surrounding the land's true agricultural grade. This assessment should be published as part of the evidence base supporting the allocation.
The Council should publish an assessment of the consequences of permanently removing CH05 from agricultural use, including the impact on the farming business currently operating the land.
The Council should respond directly to the Sheffield Green Belt Alliance's Site Capacities Investigation and publish a revised housing capacity figure for CH05 that properly accounts for constraints relating to drainage, internal roads, landscape mitigation and ecological mitigation.
The Council should confirm whether reliance on a predictive agricultural assessment tool that it has itself described as potentially unsuitable for decisions concerning individual parcels of land, particularly where its findings directly conflict with the first-hand evidence of the farmer working the land, meets the evidential standard required to support a significant allocation decision. If it does not, the Council should explain what more robust assessment is required before CH05 can lawfully be relied upon in its current form. |
| 660 |
5090185 |
27/10/2026 |
Taylor Doman |
Online |
|
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
FMM29, FMM5 |
|
No |
No |
FMM5 (Policy BG1)-
the definitions and language in the revised wording has been weakened and is less definitive. This includes wording such as ‘where possible’ and replacing ‘sites should comply with policies’ with ‘where relevant be assessed against policies’, thereby undermining the importance of these policies.
These qualifiers introduce discretion without defining when compliance would not be possible or when relevant policies would not apply. This reduces certainty and weakens the effectiveness of the policy.
In addition, the ‘green spaces of citywide importance for recreation and/or biodiversity’ to be protected listed in the amended second paragraph of the policy omits the Moss Valley ecological network- which includes 26 hectares of SSSI designated land- despite the significant impact that the development of SS19 will have on this.
FMM29 -
the buffer to the Robin Brook watercourse was amended from 8 metres to a minimum of 15 metres either side following the public hearings that took place in Autumn 2025, providing explicit protection from development. In further modification FMM29, this has been changed to a buffer that will vary in width ‘to take account of the varying habitats along the brook’. The modification specifies that hedgerows should have a buffer of 5m either side, where it forms part of an ‘S41 native species rich hedgerow’, however, this stipulation may omit qualifying priority hedgerow that may not be species rich. |
The further main modifications do not adequately address the constraints and concerns highlighted in previous consultations, or during the public hearings. For the plan to be sound, it depends on modifications being made, however those proposed are vague and lack the detail to demonstrate that they are specific, credible, deliverable or proportionate to the scale of the development in the area.
I therefore ask the Inspectors to require further modification of FMM5 and FMM29; to reinstate clear and enforceable safeguards; and, where the evidence does not demonstrate that SS19 remains deliverable with those safeguards in place, to require the allocations and their assumed capacities to be reassessed.
I request that FMM29 should retain a minimum 15 metre buffer as the baseline, with wider buffers where ecological evidence requires them. Any departure from that minimum should be supported by a clear ecological justification. |
| 661 |
5076207 |
28/10/2026 |
Elizabeth Beardsley |
Online |
Sport England |
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
SES13 |
|
Yes |
No |
Sport England considers that the words “and priority projects for sports provision in the city” should be deleted from the criteria wording, as these are likely to focus on qualitative improvements only and would not necessarily secure equivalent replacement provision in quantitative terms. This change is required in order to ensure both qualitative and quantitative replacement is considered, in line with the requirements of NPPF para 104 (b) (December 2024). This issue was also raised at Main Modification stage in relation to “ES25 Land north of Bawtry Road” and “SS01 Land west of Jordanthorpe Parkway”. Although it is noted that this consultation is limited to the Further Main Modifications as listed in the Schedule, the Proposed Additional Site Allocations: Promoted Urban Sites – Topic Paper – Addendum (EXAM 130C) includes two sites that partly comprise of playing field (Bassett Place and SHU Collegiate Campus). Although it is noted that these sites are not being included in the draft plan as allocations, Sport England would wish to stress that similar consideration would need to be given to equivalent or better provision in regards to quantity and quality in respect of Policy HC7 of the NPPF if these sites were to come forward during the plan period as windfall sites. |
Sport England considers that the words “and priority projects for sports provision in the city” should be deleted from the criteria wording, as these are likely to focus on qualitative improvements only and would not necessarily secure equivalent replacement provision in quantitative terms. This change is required in order to ensure both qualitative and quantitative replacement is provided, in line with the requirements of NPPF para 104 (b) (December 2024). |
| 662 |
5092525 |
28/10/2026 |
Brian Connolly |
Online |
Chequered Flag Land Limited |
|
Schedule of Proposed Further Main Modifications to the Sheffield Plan |
FMM5 (Policy BG1), FMM32 (site SES13) and FMM1 (paragraph 3.11) |
|
Yes |
No |
Representations of Chequered Flag Land Limited on the Schedule of Proposed Further Main Modifications: FMM5 (Policy BG1), FMM32 (site SES13) and FMM1 (paragraph 3.11). They concern Speedway at Owlerton Stadium, Penistone Road, Sheffield and the protection of sports and recreational facilities. A separate representation is made on the Integrated Impact Assessment note (R3). The full representations (5 pages) are also being sent to SheffieldPlan@sheffield.gov.uk.
OWLERTON STADIUM AND THE PLAN
Owlerton Stadium opened on 30 March 1929 and Speedway was first raced there that year. The Sheffield Tigers Speedway team race at Owlerton. The track is 361 metres long. The stadium also stages greyhound racing, which is how the Plan refers to it. The Tigers' honours include the Division 2 title in 1999, 2002 and 2017, the League Cup in 2022, the SGB Premiership title in 2023 and the Knockout Cup in 1974 and 2024. The club finished as runners-up in the 2026 Grand Final, losing to Belle Vue on aggregate after a first leg at Owlerton.
Paragraph 4.57 of Part 1 (4.58 of the submission version) refers to "the Greyhound Track" on the Penistone Road corridor. That is the only reference to the stadium in the Plan. There is no site allocation for it in Annex A. The nearby allocations KN15 and NWS16 on Penistone Road are for housing. The Playing Pitch Strategy, to which Policy GS1A refers for the meaning of "suitable location", deals with pitch sports only. Policy GS1A and the cross-reference to it in Policy BG1 are therefore the whole of the protection the Plan gives to Owlerton Stadium. That is why the wording of BG1, as changed by FMM5, matters.
Paragraph 99 of the September 2023 Framework (paragraph 104 of the December 2024 Framework) provides that existing sports and recreational buildings and land should not be built on unless one of three exceptions applies. Policy GS1A follows that test. The Coventry Stadium appeal decision (APP/E3715/W/23/3322013, 19 January 2024) applied that paragraph to a Speedway stadium without qualification.
R1 - FMM5: POLICY BG1, FOURTH PARAGRAPH
Legally compliant: yes. Sound: no - not effective; not consistent with national policy.
FMM5 amends the fourth paragraph of Policy BG1 so that development affecting Urban Green Space Zones, Green Belt, Local Green Spaces, greenspaces, outdoor recreational facilities or designated ecological or geological sites "should, where relevant, be assessed against" policies SA5, SA6, GS1, GS1A, GS2, GS5 and GS8. The Main Modifications version said that such development "should comply with" those policies.
We support the retention of "outdoor recreational facilities" and of Policy GS1A in this paragraph. We object to the replacement of "should comply with" by "should, where relevant, be assessed against", for these reasons:
- An assessment is a process; compliance is an outcome. As modified, a proposal could be assessed against Policy GS1A, fail it and still be said to accord with Policy BG1, because BG1 would ask only that the assessment be carried out.
- It creates an inconsistency with Part 2. Policy GS1A says that development "should not result in the loss of sports and recreational buildings and land ... unless" one of its exceptions is met, and that development affecting an outdoor sports facility "should also comply" with Policy GS1 (b) to (g). A strategic policy that asks only for assessment, alongside development management policies that require compliance, invites the argument that the strategic policy sets the lower bar. A plan that can be read in two ways on the same question is not effective.
- It is not consistent with national policy. Paragraph 99 of the September 2023 Framework says that such land and buildings "should not be built on" unless an exception applies. That is a requirement, not a matter for assessment.
- The reason given for FMM5 is "for effectiveness". The words "where relevant" are enough to meet the point that not every listed policy applies to every site. Removing "comply with" is not needed for that purpose and reduces the effectiveness of the policy.
"Outdoor recreational facilities" is not defined. The definition of "outdoor sports areas" in Part 2 lists tennis courts, bowling greens, sports pitches, athletics tracks and playing fields but does not mention stadia or motorsport tracks. Owlerton Stadium, which the Plan itself describes as a leisure asset, should not be left to argument on whether it falls within the paragraph. A short clarification would remove the doubt.
R2 - FMM32: SITE SES13
Legally compliant: yes. Sound: yes - supported.
We support FMM32. It applies Policy GS1A(b) to an allocation where the Council has found new evidence of a former sports use and it shows that the Plan treats the loss of a former, as well as a current, sports use as requiring replacement. We ask the Inspectors to note two points. First, the condition would be most effective if the replacement were secured before the existing provision is lost. Second, the Playing Pitch Strategy deals with pitch sports only. For a sport outside its scope, such as Speedway at Owlerton, there is no equivalent evidence in the Plan and "priority projects for sports provision in the city" are not identified. Where Policy GS1A(b) is applied to such a facility, the "suitable location" and the equivalence of the replacement must be judged on evidence of the need for that sport and not on the Playing Pitch Strategy.
R4 - FMM1: PARAGRAPH 3.11, EARLY REVIEW OF EMPLOYMENT LAND EVIDENCE
Legally compliant: yes. Sound: yes if extended - positively prepared; effective.
We support the commitment in FMM1 to revisit the evidence on large-scale logistics land and to assess supply and requirements across a wider area. A Speedway track can be laid within a large building such as a warehouse. Speedway is a sui generis use whether indoor or outdoor: Use Class E(d) excludes indoor sport "involving motorised vehicles". An indoor venue needs a large clear-span building, generous parking and separation from homes. Those are the characteristics of employment land and large-scale logistics buildings and not of centres. Uses of this kind are easily overlooked in an employment land review because they are neither employment uses nor town centre uses. The review that FMM1 commits to is the right place to make sure they are considered.
We ask to be notified at **REDACTED** of the publication of the Inspectors' report.
Brian Connolly, Chequered Flag Land Limited, 27 October 2026 |
R1 - FMM5 (Policy BG1)
Amend the fourth paragraph of Policy BG1, as proposed in FMM5, to read:
"Development affecting Urban Green Space Zones, Green Belt, Local Green Spaces, greenspaces, outdoor recreational facilities (including sports stadia and motorsport tracks) or designated ecological or geological sites should comply with policies SA5, SA6, GS1, GS1A, GS2, GS5 and GS8 where they are relevant."
This makes the policy effective and consistent with national policy: it keeps the requirement to comply, keeps "where relevant" so that only the applicable policies apply to each site and removes any doubt that stadia and motorsport tracks are outdoor recreational facilities.
R2 - FMM32 (site SES13)
None to FMM32. We ask that the Inspectors' report records that the principle applied in FMM32 applies equally to the loss of any other sports facility under Policy GS1A(b), including a Speedway stadium, judged on evidence of the need for that sport.
R4 - FMM1 (paragraph 3.11)
Add at the end of paragraph 3.11, as proposed in FMM1:
"The review will also consider the needs of sport and leisure uses that require buildings or sites of an industrial scale and cannot reasonably be located in centres, such as indoor motorsport."
This makes the review positively prepared and effective by making sure that uses which are neither employment nor town centre uses are not overlooked. |
| 663 |
5092563 |
28/10/2026 |
Brian Connolly |
Online |
Chequered Flag Land Limited |
|
Integrated Impact Assessment: Sustainability Appraisal note to respond to Examination queries and Further Main Modifications |
FMM5 (screening of FMM5 in the IIA Sustainability Appraisal note) |
|
No |
No |
Representation of Chequered Flag Land Limited on the Integrated Impact Assessment: Sustainability Appraisal note to respond to Examination queries and Further Main Modifications (September 2026), screening of FMM5. This is R3 of our representations; R1, R2 and R4 are made separately on the Schedule of Proposed Further Main Modifications. The full representations (5 pages) are also being sent to SheffieldPlan@sheffield.gov.uk.
R3 - INTEGRATED IMPACT ASSESSMENT: SCREENING OF FMM5
Legally compliant: concern. Sound: no - not justified.
The Integrated Impact Assessment: Sustainability Appraisal note screens FMM5 as "an important point of clarity, which gives greater confidence that development will not lead to significant negative environmental effects on designated sites" and concludes that it is "unlikely to have significant effects on other sustainability factors". The screening considers only biodiversity and designated sites.
It does not consider the change in the fourth paragraph of Policy BG1 from "should comply with" to "should, where relevant, be assessed against". That change applies to greenspaces, Local Green Spaces, Green Belt and outdoor recreational facilities as well as to ecological sites. The appraisal framework includes an indicator for the loss of community, leisure and recreation facilities. A modification that weakens the protection of those facilities is capable of affecting that indicator and should have been appraised. An appraisal that does not identify an effect cannot have assessed it.
This matters for Owlerton Stadium, Penistone Road, home of the Sheffield Tigers Speedway team, which has no site allocation and whose protection in the Plan rests on Policy GS1A and the cross-reference to it in Policy BG1.
We ask to be notified at **REDACTED** of the publication of the Inspectors' report.
Brian Connolly, Chequered Flag Land Limited, 27 October 2026 |
Adopt the wording in R1 (our representation on FMM5), which retains the requirement to comply and removes the need for further appraisal:
"Development affecting Urban Green Space Zones, Green Belt, Local Green Spaces, greenspaces, outdoor recreational facilities (including sports stadia and motorsport tracks) or designated ecological or geological sites should comply with policies SA5, SA6, GS1, GS1A, GS2, GS5 and GS8 where they are relevant."
If FMM5 is to proceed as drafted, the Council should publish, before the Inspectors' report, an appraisal of the effect of the change on the indicator for the loss of community, leisure and recreation facilities. |